Airworthiness Directive · Amendment 39-22313 · Time limits/maintenance checks
BAE Systems (Operations) Limited Airplanes
Superseded. A later AD replaced this one: AD 2025-16-03. Comply with the one in force.
This AD applies to all BAE Systems (Operations) Limited Model 4101 airplanes, certificated in any category.
The FAA is superseding Airworthiness Directives (ADs) 2005-15- 11, 2016-07-09, and 2018-19-24, which applied to all BAE Systems (Operations) Limited Model 4101 airplanes. AD 2005-15-11 required repetitive detailed and specialized inspections to detect fatigue damage in the fuselage, replacement of certain bolt assemblies, and corrective actions if necessary. AD 2016-07-09 required a revision of the maintenance or inspection program, as applicable. AD 2018-19-24 required a one-time detailed inspection of a certain fuselage frame and repair, if necessary, and a revision of the maintenance or inspection program, as applicable, to incorporate new or revised maintenance instructions and airworthiness limitations. This AD was prompted by a determination that new or more restrictive airworthiness limitations are necessary. This AD continues to require the actions in ADs 2016-07- 09 and 2018-19-24 and requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations. The FAA is issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (i) of AD 2016-07-09, with no changes. Within 90 days after May 16, 2016 (the effective date of AD 2016-07-09): Revise the existing maintenance or inspection program, as applicable, by incorporating Subjects 05-10-10, “Airworthiness Limitations”; 05-10-20, “Certification Maintenance Requirements”; and 05-10-30, “Critical Design Configuration Control Limitations (CDCCL)—Fuel System”; of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 Aircraft Maintenance Manual (AMM), Revision 38, dated September 15, 2013. The initial compliance times for the tasks are at the applicable times specified in paragraphs (g)(1) through (3) of this AD. Accomplishing the revision of the existing maintenance or inspection program required by paragraph (m) of this AD terminates the requirements of this paragraph.
(1) For replacement tasks of life limited parts specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Revision 38, dated September 15, 2013: Prior to the applicable flight cycles (landings) or flight hours (flying hours) on the part specified in the “Mandatory Life Limits” column in Subject 05-10-10, or within 90 days after May 16, 2016 (the effective date of AD 2016-07-09), whichever occurs later.
(2) For structurally significant item tasks specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Revision 38, dated September 15, 2013: Prior to the accumulation of the applicable flight cycles specified in the “Initial Inspection” column in Subject 05-10-10, or within 90 days after May 16, 2016 (the effective date of AD 2016-07-09), whichever occurs later.
(3) For certification maintenance requirements tasks specified in Subject 05-10-20, “Certification Maintenance Requirements,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Revision 38, dated September 15, 2013: Prior to the accumulation of the applicable flight hours specified in the “Time Between Checks” column in Subject 05-10-20, or within 90 days after May 16, 2016 (the effective date of AD 2016-07-09), whichever occurs later; except for tasks that specify “first flight of the day” in the “Time Between Checks” column in Subject 05-10-20, the initial compliance time is the first flight of the next day after doing the revision required by paragraph (g) of AD 2016-07-09, or within 90 days after May 16, 2016, whichever occurs later.
This paragraph restates the requirements of paragraph (j) of AD 2016-07-09, with no changes. Except as required by paragraph (m) of this AD, after the existing maintenance or inspection program, as applicable, has been revised as required by paragraph (g) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used unless the actions, intervals, and/or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (o)(1) of this AD.
This paragraph restates the requirements of paragraph (g) of AD 2018-19-24, with no changes. At the compliance times specified in paragraphs (i)(1) and (2) of this AD, as applicable: Do a detailed inspection of fuselage frame 90 for cracking or fatigue damage, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Alert Service Bulletin J41-A53-058, dated December 6, 2016. If any cracking or fatigue damage is found: Before further flight, repair using a method approved by the Manager, International Section, Transport Standards Branch, FAA; or the European Aviation Safety Agency (EASA); or BAE Systems (Operations) Limited's EASA Design Organization Approval (DOA). Accomplishing the revision of the existing maintenance or inspection program required by paragraph (m) of this AD terminates the requirements of this paragraph.
(1) For airplanes with 6,300 flight cycles or fewer since Structural Significant Items (SSI) 53-10-029 (Maintenance Planning Document (MPD) 531029-DVl-10010-1) was last accomplished: Within 6,600 flight cycles after the last accomplishment of SSI 53-10-029 (MPD 531029-DVl-10010-1), or within 6 months after November 7, 2018 (the effective date of AD 2018-19-24), whichever is later.
(2) For airplanes with more than 6,300 flight cycles since SSI 53-10-029 (MPD 531029-DVl-10010-1) was last accomplished: Within 300 flight cycles or 4.5 months, whichever is earlier, since the last accomplishment of SSI 53-10-029 (MPD 531029-DVl-10010-1), or within 6 months after November 7, 2018 (the effective date of AD 2018-19-24), whichever is later.
This paragraph restates the requirements of paragraph (h) of AD 2018-19-24, with no changes. Within 90 days after November 7, 2018 (the effective date of AD 2018-19-24): Revise the existing maintenance or inspection program, as applicable, by incorporating the maintenance tasks and associated thresholds and intervals described in, and in accordance with, the Accomplishment Instructions of BAE Systems (Operations) Limited Service Bulletin J41-51-001, Revision 4, dated July 11, 2017. The initial compliance times for new or revised tasks are at the applicable times specified in BAE Systems (Operations) Limited Service Bulletin J41-51-001, Revision 4, dated July 11, 2017, or within 6 months after November 7, 2018, whichever is later. Accomplishing the revision of the existing maintenance or inspection program required by paragraph (m) of this AD terminates the requirements of this paragraph.
This paragraph restates the requirements of paragraph (i) of AD 2018-19-24, with no changes. Except as required by paragraph (m) of this AD: After the existing maintenance or inspection program has been revised as required by paragraph (j) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an AMOC in accordance with the procedures specified in paragraph (o)(1) of this AD.
This paragraph restates the requirements of paragraph (k) of AD 2018-19-24, with no changes. Although the Accomplishment Instructions of BAE Systems (Operations) Limited Alert Service Bulletin J41-A53-058, dated December 6, 2016, specify to submit certain information to the manufacturer, this AD does not include that requirement.
Within 90 days after the effective date of this AD: Revise the existing maintenance or inspection program, as applicable, by incorporating Subjects 05-10-10, “Airworthiness Limitations”; 05-10-20, “Certification Maintenance Requirements”; and 05-10-30, “Critical Design Configuration Control Limitations (CDCCL)—Fuel System”; of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Effectivity Group 403, Revision 44, dated June 15, 2021; or BAE Systems (Operations) Limited J41 AMM, Effectivity Group 408, Revision 44, dated June 15, 2021; as applicable. The initial compliance times for the tasks are at the applicable times specified in paragraphs (m)(1) through (3) of this AD. Accomplishing the revision of the existing maintenance or inspection program required by this paragraph terminates the actions required by paragraphs (g), (i) and (j) of this AD.
(1) For replacement tasks of life limited parts specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Effectivity Group 403, Revision 44, dated June 15, 2021; or BAE Systems (Operations) Limited J41 AMM, Effectivity Group 408, Revision 44, dated June 15, 2021; as applicable: Prior to the applicable flight cycles (landings) or flight hours (flying hours) on the part specified in the “Mandatory Life Limits” column in Subject 05-10-10, or within 90 days after the effective date of this AD, whichever occurs later.
(2) For structurally significant item tasks specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Effectivity Group 403, Revision 44, dated June 15, 2021; or BAE Systems (Operations) Limited J41 AMM, Effectivity Group 408, Revision 44, dated June 15, 2021; as applicable: Prior to the accumulation of the applicable flight cycles specified in the “Initial Inspection” column in Subject 05-10-10, or within 90 days after the effective date of this AD, whichever occurs later.
(3) For certification maintenance requirements tasks specified in Subject 05-10-20, “Certification Maintenance Requirements,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited J41 AMM, Effectivity Group 403, Revision 44, dated June 15, 2021; or BAE Systems (Operations) Limited J41 AMM, Effectivity Group 408, Revision 44, dated June 15, 2021; as applicable: Prior to the accumulation of the applicable flight hours specified in the “Time Between Checks” column in Subject 05-10-20, or within 90 days after the effective date of this AD, whichever occurs later; except for tasks that specify “first flight of the day” in the “Time Between Checks” column in Subject 05-10-20, the initial compliance time is the first flight of the next day after accomplishing the revision required by paragraph (m) of this AD, or within 90 days after the effective date of this AD, whichever occurs later.
After the existing maintenance or inspection program has been revised as required by paragraph (m) of this AD, no alternative actions (e.g., inspections), intervals, or CDCCLs may be used unless the actions, intervals, and CDCCLs are approved as an AMOC in accordance with the procedures specified in paragraph (o)(1) of this AD.
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, International Validation Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or responsible Flight Standards Office, as appropriate. If sending information directly to the International Validation Branch, send it to the attention of the person identified in paragraph (p)(2) of this AD. Information may be emailed to: 9-AVS-AIR-730-AMOC@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the responsible Flight Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, International Validation Branch, FAA; or the United Kingdom Civil Aviation Authority (U.K. CAA); or BAE Systems (Operations) Limited's U.K. CAA Design Organization Approval (DOA). If approved by the DOA, the approval must include the DOA-authorized signature.
(1) Refer to U.K. CAA AD G-2022-0006, dated March 30, 2022, for related information. This U.K. CAA AD may be found in the AD docket at regulations.gov under Docket No. FAA-2022-1298.
(2) For more information about this AD, contact Todd Thompson, Aerospace Engineer, Large Aircraft Section, FAA, International Validation Branch, 2200 South 216th St., Des Moines, WA 98198; telephone 206-231-3228; email todd.thompson@faa.gov.