Airworthiness Directive · Amendment 39-19425 · Time limits/maintenance checks
BAE Systems (Operations) Limited Airplanes
Superseded. A later AD replaced this one: AD 2023-02-06. Comply with the one in force.
This AD applies to all BAE Systems (Operations) Limited Model 4101 airplanes, certificated in any category, all manufacturer serial numbers.
We are adopting a new airworthiness directive (AD) for all BAE Systems (Operations) Limited Model 4101 airplanes. This AD was prompted by a determination that inspection requirements for a number of maintenance tasks are incorrect. This AD requires a one-time detailed inspection of a certain fuselage frame and repair, if necessary, and a revision of the maintenance or inspection program, as applicable, to incorporate new or revised maintenance instructions and airworthiness limitations. We are issuing this AD to address the unsafe condition on these products.
At the compliance times specified in paragraphs (g)(1) and (g)(2) of this AD, as applicable: Do a detailed inspection of fuselage frame 90 for cracking or fatigue damage, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Alert Service Bulletin J41-A53-058, dated December 6, 2016. If any cracking or fatigue damage is found: Before further flight, repair using a method approved by the Manager, International Section, Transport Standards Branch, FAA; or the European Aviation Safety Agency (EASA); or BAE Systems (Operations) Limited's EASA Design Organization Approval (DOA).
(1) For airplanes with 6,300 flight cycles or fewer since Structural Significant Items (SSI) 53-10-029 (Maintenance Planning Document (MPD) 531029-DVl-10010-1) was last accomplished: Within 6,600 flight cycles after the last accomplishment of SSI 53-10-029 (MPD 531029-DVl-10010-1), or within 6 months after the effective date of this AD, whichever is later.
(2) For airplanes with more than 6,300 flight cycles since SSI 53-10-029 (MPD 531029-DVl-10010-1) was last accomplished: Within 300 flight cycles or 4.5 months, whichever is earlier, since the last accomplishment of SSI 53-10-029 (MPD 531029-DVl-10010-1), or within 6 months after the effective date of this AD, whichever is later.
Within 90 days after the effective date of this AD: Revise the maintenance or inspection program, as applicable, by incorporating the maintenance tasks and associated thresholds and intervals described in, and in accordance with, the Accomplishment Instructions of BAE Systems (Operations) Limited Service Bulletin J41-51-001, Revision 4, dated July 11, 2017. The initial compliance times for new or revised tasks are at the applicable times specified in BAE Systems (Operations) Limited Service Bulletin J41-51-001, Revision 4, dated July 11, 2017, or within 6 months after the effective date of this AD, whichever is later.
After the maintenance or inspection program has been revised as required by paragraph (h) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (l)(1) of this AD.
Accomplishment of the actions required by paragraph (h) of this AD terminates all requirements of AD 2005-15-11.
Although the Accomplishment Instructions of BAE Systems (Operations) Limited Alert Service Bulletin J41-A53-058, dated December 6, 2016, specify to submit certain information to the manufacturer, this AD does not include that requirement.