Airworthiness Directive · Amendment 39-17057 · Landing gear
Bombardier, Inc. Airplanes
This AD applies to the Bombardier airplanes identified in paragraphs (c)(1) and (c)(2) of this AD, certificated in any category.
(1) Model CL-600-2C10 (Regional Jet Series 700, 701 & 702) airplanes, serial numbers (S/Ns) 10003 and subsequent.
(2) Model CL-600-2D15 (Regional Jet Series 705) airplanes and Model CL-600-2D24 (Regional Jet Series 900) airplanes, S/Ns 15001 and subsequent.
We are superseding an existing airworthiness directive (AD) for certain Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701 & 702), CL-600-2D15 (Regional Jet Series 705), and CL-600-2D24 (Regional Jet Series 900) airplanes. That AD currently requires a one- time inspection of the main landing gear (MLG) shock strut assemblies for part and serial numbers; for certain MLG shock strut assemblies, a one-time inspection of the torque link apex joint, and corrective actions if necessary; and, for certain MLG shock strut assemblies, replacement or rework of the apex nut. This new AD continues to require the actions in the existing AD, and adds the previously omitted part and serial numbers. This AD was prompted by reports of loose or detached main landing gear (MLG) torque link apex pin locking plate and the locking plate retainer bolt in the torque link apex joint. We are issuing this AD to detect and correct improper assembly and damage of the MLG torque link apex joint, which could cause heavy vibration during landing, consequent damage to MLG components, and subsequent collapse of the MLG.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
This paragraph restates the requirements of paragraph (g) of AD 2011-08-04, Amendment 39-16654 (76 FR 20498, April 13, 2011). For airplanes identified in paragraph (c)(1) of this AD: Within 900 flight hours after May 18, 2011 (the effective date of AD 2011-08-04), inspect the MLG shock strut assemblies to determine whether an MLG shock strut assembly having a P/N 49000-11 through 49000-22 inclusive and a S/N 0001 through 0284 inclusive is installed. A review of airplane maintenance records is acceptable in lieu of this inspection if the part and serial numbers of the MLG shock strut assembly can be conclusively determined from that review.
This paragraph restates the requirements of paragraph (h) of AD 2011-08-04, Amendment 39-16654 (76 FR 20498, April 13, 2011). For any MLG shock strut assembly having a P/N 49000-11 through 49000-22 inclusive and a S/N 0001 through 0284 inclusive found installed during the inspection or records check required by paragraph (g) of this AD: Within 900 flight hours after May 18, 2011 (the effective date of AD 2011-08-04), perform a one-time detailed inspection and all applicable corrective actions on the torque link apex joint, in accordance with Part A of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008, except as provided by paragraph (o) of this AD. Do all applicable corrective actions before further flight.
This paragraph restates the requirements of paragraph (i) of AD 2011-08-04, Amendment 39-16654 (76 FR 20498, April 13, 2011). For any MLG shock strut assembly identified during the inspection or records check required by paragraph (g) of this AD: Within 4,500 flight hours after May 18, 2011 (the effective date of AD 2011-08-04), replace or rework the apex nut, in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008.
For all airplanes: As of May 18, 2011 (the effective date of AD 2011-08-04, Amendment 39-16654 (76 FR 20498, April 13, 2011)), no person may install, on any airplane, a replacement MLG shock strut assembly identified in paragraph (j)(1) or (j)(2) of this AD, unless it has been reworked in accordance with paragraph B. of Part B of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008.
(1) Part numbers 49000-11 through 49000-22 inclusive, and with a serial number in the range of S/Ns 0001 through 0284 inclusive (the serial number can start with “MA,” “MAL,” or “MA-”).
(2) Part numbers 49050-5 through 49050-10 inclusive, and with a serial number in the range of S/Ns 1001 through 1114 inclusive (the serial number can start with “MA,” “MAL,” or “MA-”).
For airplanes identified in paragraph (c)(2) of this AD: Within 900 flight hours after the effective date of this AD, inspect the MLG shock strut assemblies to determine whether an MLG shock strut assembly having P/Ns 49050-5 through 49050-10 inclusive and a S/N 0001 through 1114 inclusive is installed. A review of airplane maintenance records is acceptable in lieu of this inspection if the part and serial numbers of the MLG shock strut assembly can be conclusively determined from that review.
For any MLG shock strut assembly having P/Ns 49050-5 through 49050-10 inclusive and a S/N 0001 through 1114 inclusive found installed during the inspection or records check required by paragraph (k) of this AD: Within 900 flight hours after the effective date of this AD, perform a one-time detailed inspection and all applicable corrective actions on the torque link apex joint, in accordance with Part A of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008, except as provided by paragraph (o) of this AD. Do all applicable corrective actions before further flight.
For any MLG shock strut assembly identified during the inspection or records check required by paragraph (k) of this AD: Within 900 flight hours after the effective date of this AD, replace or rework the apex nut, in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008.