Airworthiness Directive · Amendment 39-16654 · Landing gear
Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701 & 702) Airplanes, Model CL-600-2D15 (Regional Jet Series 705) Airplanes, and Model CL-600-2D24 (Regional Jet Series 900) Airplanes
Superseded. A later AD replaced this one: AD 2012-10-08. Comply with the one in force.
This AD applies to the Bombardier airplanes identified in paragraphs (c)(1) and (c)(2) of this AD, certificated in any category.
(1) Model CL-600-2C10 (Regional Jet Series 700, 701 & 702) airplanes, serial numbers (S/Ns) 10003 and subsequent.
(2) Model CL-600-2D15 (Regional Jet Series 705) airplanes and Model CL-600-2D24 (Regional Jet Series 900) airplanes, S/Ns 15001 and subsequent.
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
For all airplanes identified in paragraphs (c)(1) and (c)(2) of this AD: Within 900 flight hours after the effective date of this AD, inspect the main landing gear (MLG) shock strut assemblies to determine whether an MLG shock strut assembly having P/Ns 49000-11 through 49000-22 inclusive and a S/N 0001 through 0284 inclusive is installed. A review of airplane maintenance records is acceptable in lieu of this inspection if the part and serial numbers of the MLG shock strut assembly can be conclusively determined from that review.
For any MLG shock strut assembly having P/Ns 49000-11 through 49000-22 inclusive and a S/N 0001 through 0284 inclusive found installed during the inspection or records check required by paragraph (g) of this AD: Within 900 flight hours after the effective date of this AD, perform a one-time detailed inspection and all applicable corrective actions on the torque link apex joint, in accordance with Part A of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008, except as provided by paragraph (l) of this AD. Do all applicable corrective actions before further flight.
(i) For any MLG shock strut assembly identified during the inspection or records check required by paragraph (g) of this AD: Within 4,500 flight hours after the effective date of this AD, replace or rework the apex nut, in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008.
As of the effective date of this AD, no person may install, on any airplane, a replacement MLG shock strut assembly identified in paragraph (j)(1) or (j)(2) of this AD, unless it has been reworked in accordance with paragraph B. of Part B of the Accomplishment Instructions of Bombardier Service Bulletin 670BA-32-019, Revision A, dated September 18, 2008.
(1) Part numbers 49000-11 through 49000-22 inclusive, and with a serial number in the range of S/Ns 0001 through 0284 inclusive (the serial number can start with “MA,” “MAL,” or “MA-”).
(2) Part numbers 49050-5 through 49050-10 inclusive, and with a serial number in the range of S/Ns 1001 through 1114 inclusive (the serial number can start with “MA,” “MAL,” or “MA-”).
Inspections, corrective actions, replacements, and rework accomplished before the effective date of this AD in accordance with Bombardier Service Bulletin 670BA-32-019, dated March 16, 2006, are considered acceptable for compliance with the corresponding actions specified in this AD.
(l) The inspections specified in paragraph (h) of this AD are not required if the actions specified in paragraph (i) of this AD have already been accomplished; or if Bombardier Repair Engineering Order 670-32-11-0022, dated October 22, 2005, or Goodrich Service Concession Request SCR 0056-05, dated October 22, 2005; has been incorporated.
Note 1: The MCAI specifies to inspect only airplanes having certain serial numbers that are part of the MCAI applicability. Because the affected part could be rotated onto any of the airplanes listed in the applicability, this AD requires that the inspection be done on all airplanes. We have coordinated this with the Transport Canada Civil Aviation (TCCA).