Airworthiness Directive · Amendment 39-16893 · Wings
The Boeing Company Model 777-200, -200LR, -300, and -300ER Series Airplanes
Superseded. A later AD replaced this one: AD 2017-11-14. Comply with the one in force.
This AD applies to The Boeing Company airplanes, certificated in any category, as identified in the applicable service information specified in paragraphs (c)(1), (c)(2), (c)(3), and (c)(4) of this AD.
(1) For Model 777-200, -300, and -300ER airplanes: Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009.
(2) For Model 777-200 and -300 airplanes: Boeing Alert Service Bulletin 777-57A0051, dated May 15, 2006.
(3) For Model 777-200, -300, and -300ER airplanes: Boeing Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007.
(4) For Model 777-200, -200LR, -300, and -300ER airplanes: Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008.
Note 1: Operators should consider any reference to Model 777-200ER airplanes identified in the service information specified in paragraphs (c)(1), (c)(2), (c)(3), and (c)(4) of this AD, as applicable, to be to the Model 777-200 airplanes designated by the type certificate data sheet.
We are superseding an existing airworthiness directive (AD) for certain Model 777-200, -300, and -300ER series airplanes. That AD currently requires installing Teflon sleeving under the clamps of certain wire bundles routed along the fuel tank boundary structure, and cap sealing certain penetrating fasteners of the main and center fuel tanks. This AD expands the applicability in the existing AD. This AD was prompted by fuel system reviews conducted by the manufacturer, which determined that electrical arcing on the fuel tank boundary structure or inside the fuel tanks could result in a fire or explosion. We are issuing this AD to correct the unsafe condition on these products.
Within 60 months after January 20, 2011 (the effective date of AD 2010-24-12, amendment 39-16531 (75 FR 78588, December 16, 2010)), do the applicable actions specified in paragraph (g)(1), (g)(2), (g)(3), or (g)(4) of this AD.
(1) For airplanes identified in Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009: Install Teflon sleeving under the clamps of certain wire bundles routed along the fuel tank boundary structure and cap seal certain penetrating fasteners of the fuel tanks, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009.
(2) For airplanes identified in Boeing Alert Service Bulletin 777-57A0051, dated May 15, 2006: Cap seal certain penetrating fasteners of the fuel tanks, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0051, dated May 15, 2006.
(3) For airplanes identified in Boeing Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007: Do a general visual inspection to determine if certain fasteners are cap sealed and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007. Do all applicable corrective actions before further flight.
(4) For Model 777-200, -300, and -300ER airplanes identified in Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008: Cap seal the fasteners in the center fuel tanks that were not sealed during production, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008.
(1) Actions done before January 20, 2011, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0050, dated January 26, 2006; or Revision 1, dated August 2, 2007; are acceptable for compliance with the corresponding actions required by paragraph (g)(1) of this AD, provided that the applicable additional work specified in Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009, is done within the compliance time specified in paragraph (g) of this AD. The additional work must be done in accordance with Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009.
(2) Actions done before January 20, 2011, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0057, dated August 7, 2006, are acceptable for compliance with the actions required by paragraph (g)(3) of this AD.
For Model 777-200LR airplanes identified in Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008: Within 60 months after the effective date of this AD, cap seal the fasteners in the center fuel tanks that were not sealed during production, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.