Airworthiness Directive · Amendment 39-16531 · Wings
The Boeing Company Model 777-200, -300, and -300ER Series Airplanes
Superseded. A later AD replaced this one: AD 2011-26-03. Comply with the one in force.
This AD applies to The Boeing Company airplanes, certificated in any category, as identified in the applicable service information specified in Table 1 of this AD.
| For Model— | Boeing— |
|---|---|
| 777-200, -300, and -300ER airplanes | Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009. |
| 777-200 and -300 airplanes | Alert Service Bulletin 777-57A0051, dated May 15, 2006. |
| 777-200, -300, and -300ER airplanes | Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007. |
| 777-200, -300, and -300ER airplanes | Alert Service Bulletin 777-57A0059, dated October 30, 2008. |
Note 1: Although Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009, refers to “Model 777-200ER” airplanes, this is a European designation that does not apply to airplanes of U.S. registry. Therefore, the applicability of this AD will not specify Model 777-200ER airplanes. However, U.S. operators should consider any reference to Model 777-200ER airplanes in Boeing Service Bulletin 777-57A0050, Revision 2, as applicable to Model 777-200 airplanes as designated by the type certificate data sheet.
We are adopting a new airworthiness directive (AD) for certain Model 777-200, -300, and -300ER series airplanes. This AD requires installing Teflon sleeving under the clamps of certain wire bundles routed along the fuel tank boundary structure, and cap sealing certain penetrating fasteners of the main and center fuel tanks. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent electrical arcing on the fuel tank boundary structure or inside the fuel tanks, which could result in a fire or explosion.
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Within 60 months after the effective date of this AD, do the applicable actions specified in paragraph (g)(1), (g)(2), (g)(3), or (g)(4) of this AD.
(1) For airplanes identified in Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009: Install Teflon sleeving under the clamps of certain wire bundles routed along the fuel tank boundary structure and cap seal certain penetrating fasteners of the fuel tanks, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009.
(2) For airplanes identified in Boeing Alert Service Bulletin 777-57A0051, dated May 15, 2006: Cap seal certain penetrating fasteners of the fuel tanks, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0051, dated May 15, 2006.
(3) For airplanes identified in Boeing Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007: Do a general visual inspection to determine if certain fasteners are cap sealed and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0057, Revision 1, dated August 2, 2007. Do all applicable corrective actions before further flight.
(4) For airplanes identified in Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008: Cap seal the fasteners in the center fuel tanks that were not sealed during production, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0059, dated October 30, 2008.
Actions done before the effective date of this AD in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0050, dated January 26, 2006; or Revision 1, dated August 2, 2007; are acceptable for compliance with the corresponding actions required by paragraph (g)(1) of this AD, provided that the applicable additional work specified in Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009, is done within the compliance time specified in paragraph (g) of this AD. The additional work must be done in accordance with Boeing Service Bulletin 777-57A0050, Revision 2, dated May 14, 2009.
(i) Actions done before the effective date of this AD in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-57A0057, dated August 7, 2006, are acceptable for compliance with the actions required by paragraph (g)(3) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft