Airworthiness Directive · Amendment 39-23049 · Turbine section
General Electric Company Engines
This AD applies to General Electric Company Model GEnx-1B64, GEnx-1B64/P1, GEnx-1B64/P2, GEnx-1B67, GEnx-1B67/P1, GEnx-1B67/P2, GEnx-1B70, GEnx-1B70/75/P1, GEnx-1B70/75/P2, GEnx-1B70/P1, GEnx-1B70/P2, GEnx-1B70C/P1, GEnx-1B70C/P2, GEnx-1B74/75/P1, GEnx-1B74/75/P2, GEnx-1B76/P2, GEnx-1B76A/P2, and GEnx-2B67/P engines with at least one of the following installed:
(1) High Pressure Turbine (HPT) stage 1 disk having part number (P/N) 2383M83G03 and a serial number (S/N) listed in Table 1 of GE GEnx-1B Service Bulletin 72-0542 R00, dated April 15, 2024 (GE GEnx-1B SB 72-0542 R00);
(2) HPT stage 2 disk having P/N 2300M84P02 and a S/N listed in Table 2 of GE GEnx-1B SB 72-0542 R00;
(3) HPT stage 1 disk having P/N 2383M83G03 and a S/N listed in Table 1 of GE GEnx-2B Service Bulletin 72-0471 R00, dated April 15, 2024 (GE GEnx-2B SB 72-0471 R00); or
(4) HPT stage 2 disk having P/N 2300M84P02 and a S/N listed in Table 2 of GE GEnx-2B SB 72-0471 R00.
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) Model GEnx-1B64, GEnx-1B64/P1, GEnx-1B64/P2, GEnx-1B67, GEnx-1B67/P1, GEnx-1B67/P2, GEnx-1B70, GEnx- 1B70/75/P1, GEnx-1B70/75/P2, GEnx-1B70/P1, GEnx-1B70/P2, GEnx-1B70C/P1, GEnx-1B70C/P2, GEnx-1B74/75/P1, GEnx-1B74/75/P2, GEnx-1B76/P2, GEnx- 1B76A/P2, and GEnx-2B67/P engines. This AD was prompted by a manufacturer's investigation that revealed certain high-pressure turbine (HPT) stage 1 and HPT stage 2 disks were manufactured from powder metal material suspected to contain iron inclusion. This AD requires replacement of affected HPT stage 1 and HPT stage 2 disks with parts eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.
At the applicable time specified in paragraphs (g)(1) through (4) of this AD, remove each affected HPT stage 1 disk and HPT stage 2 disk from service and replace with a part eligible for installation.
(1) For engines identified in paragraph (c)(1) of this AD, at the next piece-part exposure after the effective date of this AD or before the affected HPT stage 1 disk exceeds the cyclic removal threshold listed in Table 1 of GE GEnx-1B SB 72-0542 R00, whichever occurs first.
(2) For engines identified in paragraph (c)(2) of this AD, at the next piece-part exposure after the effective date of this AD or before the affected HPT stage 2 disk exceeds the cyclic removal threshold listed in Table 2 of GE GEnx-1B SB 72-0542 R00, whichever occurs first.
(3) For engines identified in paragraph (c)(3) of this AD, at the next piece-part exposure after the effective date of this AD or before the affected HPT stage 1 disk exceeds the cyclic removal threshold listed in Table 1 of GE GEnx-2B SB 72-0471 R00, whichever occurs first.
(4) For engines identified in paragraph (c)(4) of this AD, at the next piece-part exposure after the effective date of this AD or before the affected HPT stage 2 disk exceeds the cyclic removal threshold listed in Table 2 of GE GEnx-2B SB 72-0471 R00, whichever occurs first.
For the purpose of this AD:
(1) A “part eligible for installation” is any HPT stage 1 disk or HPT stage 2 disk with a P/N and S/N that is not listed in Table 1 or Table 2 of either GEnx-1B SB 72-0542 R00 or GEnx-2B SB 72-0471 R00.
(2) A “piece-part exposure” is when the affected HPT stage 1 disk or HPT stage 2 disk is removed from the engine.