Airworthiness Directive · Amendment 39-22676 · Landing gear
Bombardier, Inc., Airplanes
This AD applies to Bombardier, Inc., Model CL-600-2B16 (604 Variant) airplanes, serial numbers (S/N) 5301 through 5665 inclusive, 5701 through 5988 inclusive, and 6050 through 6188 inclusive, certificated in any category.
The FAA is superseding Airworthiness Directive (AD) 2021-20- 13, which applied to certain Bombardier, Inc., Model CL-600-2B16 (604 Variant) airplanes. AD 2021-20-13 required repetitive lubrication and repetitive detailed visual inspections (DVI) and non-destructive test (NDT) inspections of the main landing gear (MLG) shock strut lower pins, and replacement if necessary. This AD continues to require the lubrication and inspections specified in AD 2021-20-13 until the MLG shock strut assembly is modified by replacing the trailing arm bushing and installing new dynamic joint components. This AD was prompted by a new design solution for this potential failure of the shock strut lower pin. The FAA is issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (g) of AD 2021-20-13, with revised applicability. Within 200 flight hours (FH) or 12 months after November 18, 2021 (the effective date of AD 2021-20-13), whichever occurs first, lubricate the left-hand (LH) and right-hand (RH) MLG shock strut lower pins having part number (P/N) 19146-3, in accordance with paragraph 2.B., “Part A,” of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (g)(1) through (3) of this AD. Repeat thereafter at intervals not to exceed 200 FH or 12 months, whichever occurs first.
(1) For airplanes having S/N 5301 through 5665 inclusive: Bombardier Service Bulletin 604-32-030, dated June 30, 2020.
(2) For airplanes having S/N 5701 through 5988 inclusive: Bombardier Service Bulletin 605-32-007, dated June 30, 2020.
(3) For airplanes having S/N 6050 through 6188 inclusive: Bombardier Service Bulletin 650-32-004, dated June 30, 2020.
This paragraph restates the requirements of paragraph (h) of AD 2021-20-13, with no changes. At the applicable compliance time specified in paragraphs (h)(1) through (3) of this AD, perform the DVI for cracking and damage of the LH and RH MLG shock strut lower pins having part number (P/N) 19146-3, in accordance with paragraph 2.C., “Part B,” of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (g)(1) through (3) of this AD. Repeat thereafter at intervals not to exceed 400 FH or 24 months, whichever occurs first. If the DVI coincides with a non-destructive testing (NDT) inspection required by paragraph (i) of this AD, the NDT inspection supersedes the DVI for that interval only. If the accumulated flight cycles (FC) of the MLG shock strut lower pin are not known, use the related MLG assembly accumulated FC to determine when to accomplish the actions required by this paragraph.
(1) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued on or before November 18, 2021 (the effective date of AD 2021-20-13) and on which an MLG shock strut lower pin has accumulated fewer than 600 total FC on the pin as of November 18, 2021: Before the accumulation of 750 total FC on the pin.
(2) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued on or before November 18, 2021 (the effective date of AD 2021-20-13) and on which an MLG shock strut lower pin has accumulated 600 total FC or more on the pin as of November 18, 2021: Within 150 FC after November 18, 2021.
(3) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued after November 18, 2021 (the effective date of AD 2021-20-13): Before the accumulation of 750 total FC.
This paragraph restates the requirements of paragraph (i) of AD 2021-20-13, with no changes. At the applicable compliance time specified in paragraphs (i)(1) through (4) of this AD: Perform the NDT inspection for cracking and damage of the LH and RH MLG shock strut lower pins having P/N 19146-3, in accordance with paragraph 2.D., “Part C,” of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (g)(1) through (3) of this AD. Repeat thereafter at intervals not to exceed 900 FC. If the accumulated FC of the MLG shock strut lower pin is not known, use the related MLG assembly accumulated FC to determine when to accomplish the actions required by this paragraph.
(1) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued on or before November 18, 2021 (the effective date of AD 2021-20-13) and on which an MLG shock strut lower pin has accumulated fewer than 1,200 total FC on the pin as of November 18, 2021: Before the accumulation of 1,500 total FC on the pin.
(2) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued on or before November 18, 2021 (the effective date of AD 2021-20-13) and on which an MLG shock strut lower pin has accumulated 1,200 total FC or more but fewer than 2,000 total FC on the pin as of November 18, 2021: Within 300 FC after November 18, 2021, or before the accumulation of 2,200 total FC on the pin, whichever occurs first.
(3) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued on or before November 18, 2021 (the effective date of AD 2021-20-13) and on which an MLG shock strut lower pin has accumulated 2,000 total FC or more on the pin as of November 18, 2021: Within 200 FC after November 18, 2021.
(4) For airplanes with an original airworthiness certificate or original export certificate of airworthiness issued after November 18, 2021 (the effective date of AD 2021-20-13): Before the accumulation of 1,500 total FC.
This paragraph restates the requirements of paragraph (j) of AD 2021-20-13, with no changes. If, during any inspection required by this AD, any crack or damage of the MLG shock strut lower pin is detected, before further flight, replace the affected MLG shock strut lower pin with a new part in accordance with paragraph 2.E., “Part D,” of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (g)(1) through (3) of this AD.
Within 60 months from the effective date of this AD, modify the LH and RH MLG assembly in accordance with paragraph 2.B. of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (k)(1) through (3) of this AD.
(1) For airplanes having S/N 5301 through 5665 inclusive: Bombardier Service Bulletin 604-32-031, Revision 01, dated March 17, 2023.
(2) For airplanes having S/N 5701 through 5988 inclusive: Bombardier Service Bulletin 605-32-008, Revision 01, dated March 17, 2023.
(3) For airplanes having S/N 6050 through 6188 inclusive: Bombardier Service Bulletin 650-32-005, Revision 01, dated March 17, 2023.
Before further flight after completing the actions required by paragraph (k) of this AD, perform the testing of the MLG shock strut assembly to trailing arm assembly joint in accordance with paragraph 2.C. of the Accomplishment Instructions of the applicable service bulletin, as specified in paragraphs (k)(1) through (3) of this AD.
Modifying and testing an airplane as required by paragraphs (k) and (l) of this AD terminates the initial and repetitive lubrication and inspections required by paragraphs (g), (h), and (i) of this AD for that airplane.