Airworthiness Directive · Amendment 39-21519 · Fuselage
The Boeing Company Airplanes
Superseded. A later AD replaced this one: AD 2025-07-03. Comply with the one in force.
(1) This AD applies to all The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes, certificated in any category.
(2) Installation of Supplemental Type Certificate (STC) ST00830SE does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST00830SE is installed, a “change in product” alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17.
The FAA is superseding Airworthiness Directive (AD) 2019-22- 10, which applied to all The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes. AD 2019-22-10 required repetitive inspections for cracking of the left- and right-hand side outboard chords of frame fittings and failsafe straps at a certain station around eight fasteners, and repair if any cracking is found. For certain airplanes, this AD reduces the compliance time for the initial inspection, and for all airplanes this AD reduces the repetitive interval. This AD was prompted by a determination that the initial inspection threshold and repetitive inspection interval are inadequate to address the cracking in a timely manner. The FAA is issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (g) of AD 2019-22-10, with no changes. At the earlier of the times specified in paragraphs (g)(1) and (2) of this AD: Do a detailed inspection for cracking of the left- and right-hand side outboard chords of the STA 663.75 frame fittings and failsafe straps adjacent to the stringer S 18A straps, in accordance with Boeing Multi-Operator Message MOM-MOM-19-0536-01B, dated September 30, 2019. If any crack is found, repair before further flight using a method approved in accordance with the procedures specified in paragraph (n) of this AD. Repeat the inspection thereafter at intervals not to exceed 3,500 flight cycles until the initial inspection required by paragraph (i) of this AD is done.
(1) Prior to the accumulation of 30,000 total flight cycles, or within 7 days after October 3, 2019 (the effective date of AD 2019-20-02, Amendment 39-19755 (84 FR 52754, October 3, 2019) (AD 2019-20-02)), whichever occurs later.
(2) Prior to the accumulation of 22,600 total flight cycles, or within 1,000 flight cycles after October 3, 2019 (the effective date of AD 2019-20-02), whichever occurs later.
This paragraph restates the requirements of paragraph (h) of AD 2019-22-10, with no changes. At the applicable time specified in paragraph (h)(1) or (2) of this AD, submit a report of all findings, positive and negative, of the initial inspection required by paragraph (g) of this AD. Submit the report in accordance with Boeing Multi-Operator Message MOM-MOM-19-0536-01B, dated September 30, 2019.
(1) If the inspection was done on or after October 3, 2019 (the effective date of AD 2019-20-02): Submit the report within 10 days after the inspection.
(2) If the inspection was done before October 3, 2019 (the effective date of AD 2019-20-02): Submit the report within 10 days after October 3, 2019.
Except as specified in paragraph (j) of this AD: At the applicable initial compliance time specified in Tables 1 and 2 of “Ref I” of Boeing Multi-Operator Message MOM-MOM-20-0443-01B (R1), dated June 2, 2020, do a detailed inspection of the left- and right-hand side outboard chords of the STA 663.75 frame fittings and failsafe straps around eight fasteners adjacent to the stringer S-18A straps, in accordance with Boeing Multi-Operator Message MOM-MOM-20-0443-01B (R1), dated June 2, 2020. If any crack is found, repair before further flight using a method approved in accordance with the procedures specified in paragraph (n) of this AD. Repeat the inspection thereafter at the applicable intervals specified in Tables 1 and 2 of “Ref I” of Boeing Multi-Operator Message MOM-MOM-20-0443-01B (R1), dated June 2, 2020. Accomplishing the initial inspection required by this paragraph or an initial inspection specified in Boeing Multi-Operator Message MOM-MOM-19-0623-01B, dated November 5, 2019, terminates the inspections required by paragraph (g) of this AD.
Where Boeing Multi-Operator Message MOM-MOM-20-0443-01B (R1), dated June 2, 2020, uses the phrase “the original issue date of MOM-MOM-20-0443-01B(R1),” this AD requires using “the effective date of this AD.”
At the applicable time specified in paragraph (k)(1) or (2) of this AD, submit a report of all findings, positive and negative, of the initial inspection required by paragraph (i) of this AD. Submit the report in accordance with MOM-MOM-20-0443-01B (R1), dated June 2, 2020. A report submitted as specified in paragraph (h) of this AD is acceptable for compliance with the requirements of this paragraph.
(1) If the inspection was done on or after the effective date of this AD: Submit the report within 10 days after the inspection.
(2) If the inspection was done before the effective date of this AD: Submit the report within 10 days after the effective date of this AD.