Airworthiness Directive · Amendment 39-21471 · Fuselage structure
Gulfstream Aerospace Corporation Airplanes
This AD applies to Gulfstream Aerospace Corporation Model GV airplanes, all serial numbers, certificated in any category.
The FAA is adopting a new airworthiness directive (AD) for all Gulfstream Aerospace Corporation (Gulfstream) Model GV airplanes. This AD was prompted by notification of corrosion present in floor beam support links. This AD requires inspecting the right butt line 6 floor beam inboard support links and bushings for corrosion. The FAA is issuing this AD to address the unsafe condition on these products.
(1) Within 24 months after the effective date of this AD, inspect the right butt line 6 floor beam inboard support links at fuselage stations (FS) 499, 531, and 569.5 for corrosion by following the Accomplishment Instructions, steps A through M, of Gulfstream GV Customer Bulletin No. 231, Revision A, dated July 30, 2019 (Gulfstream CB 231A). Where Gulfstream CB 231A specifies contacting Gulfstream for procedures if any corrosion is found, you must replace the support link in accordance with a method approved by the Manager, Atlanta ACO Branch, FAA, before further flight. For a method to be approved by the Manager, Atlanta ACO Branch, as required by this paragraph, the Manager's approval letter must specifically refer to this AD.
(2) Within 24 months after the effective date of this AD, revise the airworthiness limitations section of your maintenance manual or inspection program to incorporate the airworthiness limitations specified in Table 13: Fuselage Inspection Table in Section 05-10-10 of Chapter 5—Time Limits/Maintenance Checks of Gulfstream GV Aircraft Maintenance Manual, Revision 51, dated February 28, 2020. Thereafter, except as provided in paragraph (h) of this AD, no alternative inspection intervals may be approved for the fuselage floor beam and wing link FS 465-FS 576.