Airworthiness Directive · Amendment 39-21323 · Emergency equipment, and 2564, life raft
Leonardo S.p.a. Helicopters
Superseded. A later AD replaced this one: AD 2022-07-01. Comply with the one in force.
This airworthiness directive (AD) applies to Leonardo S.p.a. Model AB139 and AW139 helicopters, certificated in any category, with emergency flotation kit part number (P/N) 4G9560F00111 (15 passengers) or 4G9560F00211 (18 passengers).
The FAA is adopting a new airworthiness directive for all Leonardo S.p.a. Model AB139 and AW139 helicopters. This AD requires removing certain emergency life raft (raft) reservoirs (reservoirs) from service, inspecting the reservoirs and raft actuator cables (actuator cables), and depending on the inspection results, replacing the reservoir or adjusting the actuator cable. This AD was prompted by the inadvertent activation and deployment of a raft while the helicopter was in flight. The actions of this AD are intended to address an unsafe condition on these products.
You are responsible for performing each action required by this AD within the specified compliance time unless it has already been accomplished prior to that time.
(1) For helicopters with a right-hand (RH) or left-hand (LH) life raft reservoir (reservoir) P/N 3G2560V01951 or P/N 3G2560V01251 and with a serial number (S/N) listed in Table 1 of the Leonardo Helicopters Alert Service Bulletin No. 139-648, dated August 10, 2020 (ASB 139-648), within 25 hours time-in-service (TIS), remove each affected reservoir from service.
(2) For helicopters with a RH or LH reservoir P/N 3G2560V01951 or P/N 3G2560V01251 and with an S/N not listed in Table 1 of ASB 139-648 installed, within 25 hours TIS or before the reservoir accumulates 55 total hours TIS since first installation on a helicopter, whichever occurs later, inspect the valve pull rod of each reservoir by following paragraphs 3. through 5.1, of the Accomplishment Instructions, part II, of ASB 139-648. If the measurement of the raft actuator cable (actuator cable) between the face of the pull rod and the back of the valve cap exceeds 68.5 mm, before further flight, replace the reservoir.
(3) For helicopters with a RH or LH reservoir P/N 3G2560V01951 or P/N 3G2560V01251 and with an S/N not listed in Table 1 of ASB 139-648 installed, within 25 hours TIS, inspect the actuator cable of each reservoir by following paragraphs 3. through 5.1, of the Accomplishment Instructions, part III, of ASB 139-648. If the clearance between the sphere at the end of the actuator cable and the activation system exceeds 5.0 +0.00/−2.0 mm, before further flight, adjust the life raft actuator cable by following Annex A of ASB 139-648.
(4) As of the effective date of this AD, do not install reservoir P/N 3G2560V01951 or P/N 3G2560V01251 with an S/N listed in Table 1 of ASB 139-648 on any helicopter.
(5) As of the effective date of this AD, do not install a reservoir P/N 3G2560V01951 or P/N 3G2560V01251 with an S/N other than an S/N listed in Table 1 of ASB 139-648 on any helicopter unless you have complied with the requirements in paragraph (e)(3) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft