Airworthiness Directive · Amendment 39-19896 · Time limits/maintenance checks
Saab AB, Support and Services (Formerly Known as Saab AB, Saab Aeronautics) Airplanes
Superseded. A later AD replaced this one: AD 2021-26-05. Comply with the one in force.
This AD applies to all Saab AB, Support and Services (formerly known as Saab AB, Saab Aeronautics) Model SAAB 2000 airplanes, certificated in any category.
The FAA is adopting a new airworthiness directive (AD) for all Saab AB, Support and Services Model SAAB 2000 airplanes. This AD was prompted by a determination that new or more restrictive airworthiness limitations are necessary. This AD requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference. The FAA is issuing this AD to address the unsafe condition on these products.
Except as specified in paragraph (h) of this AD: Comply with all required actions and compliance times specified in, and in accordance with, European Union Aviation Safety Agency (EASA) AD 2019-0263, dated October 22, 2019 (“EASA AD 2019-0263”).
(1) The requirements specified in paragraphs (1) and (2) of EASA AD 2019-0263 do not apply to this AD.
(2) Paragraph (3) of EASA AD 2019-0263 specifies revising “the approved AMP [aircraft maintenance program]” within 12 months after its effective date, but this AD requires revising the existing maintenance or inspection program, as applicable, to incorporate the “limitations, tasks and associated thresholds and intervals” specified in paragraph (3) of EASA AD 2019-0263 within 90 days after the effective date of this AD.
(3) The initial compliance time for doing the tasks specified in paragraph (3) of EASA AD 2019-0263 is at the applicable “associated thresholds” specified in paragraph (3) of EASA AD 2019-0263, or within 90 days after the effective date of this AD, whichever occurs later.
(4) The provisions specified in paragraphs (4) and (5) of EASA AD 2019-0263 do not apply to this AD.
(5) The “Remarks” section of EASA AD 2019-0263 does not apply to this AD.
After the maintenance or inspection program has been revised as required by paragraph (g) of this AD, no alternative actions (e.g., inspections), intervals, and CDCCLs are allowed unless they are approved as specified in the provisions of the “Ref. Publications” section of EASA AD 2019-0263.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft