Airworthiness Directive · Amendment 39-19677 · Time limits/maintenance checks
ATR-GIE Avions de Transport Régional Airplanes
Superseded. A later AD replaced this one: AD 2021-03-03. Comply with the one in force.
This AD applies to ATR-GIE Avions de Transport Régional Model ATR72-101, -102, -201, -202, -211, -212, and -212A airplanes, certificated in any category, with an original airworthiness certificate or original export certificate of airworthiness issued on or before January 30, 2018.
The FAA is adopting a new airworthiness directive (AD) for certain ATR-GIE Avions de Transport R[eacute]gional Model ATR72 airplanes. This AD was prompted by a determination that new or more restrictive maintenance instructions and airworthiness limitations are necessary. This AD requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive maintenance instructions and airworthiness limitations. The FAA is issuing this AD to address the unsafe condition on these products.
Within 90 days after the effective date of this AD, revise the existing maintenance or inspection program, as applicable, to incorporate the information specified in ATR ATR72 Time Limits Document, Revision 16, dated January 30, 2018. The initial compliance time for doing the tasks is at the time specified in ATR ATR72 Time Limits Document, Revision 16, dated January 30, 2018, or within 90 days after the effective date of this AD, whichever occurs later, except as provided by paragraphs (h) and (i) of this AD.
For accomplishing airworthiness limitations (AWL) and certification maintenance requirement (CMR)/maintenance significant item (MSI) tasks identified in figure 1 to paragraph (h) of this AD, the initial compliance time is at the applicable time specified in the airworthiness limitations section (ALS) of the ATR ATR72 Time Limits Document, Revision 16, dated January 30, 2018, or at the applicable compliance time in figure 1 to paragraph (h) of this AD, whichever occurs later.
For CMR task 220000-5, a one-time initial threshold, as specified in ATR ATR72 Time Limits Document, Revision 16, dated January 30, 2018, is allowed as specified in figure 2 to paragraph (i) of this AD.
After the existing maintenance or inspection program has been revised as required by paragraph (g) of this AD, no alternative actions (e.g., inspections) and intervals may be used unless the actions and intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (l)(1) of this AD.
Accomplishing the actions required by this AD terminates all requirements of AD 2018-14-11, AD 2000-23-26, and AD 2008-04-19 R1.