Airworthiness Directive · Amendment 39-19659 · Wings
Airbus SAS Airplanes
This AD applies to Airbus SAS Model A300 B4-603, B4-620, B4-622, B4-605R, B4-622R, C4-605R Variant F, F4-605R, and F4-622R airplanes, certificated in any category, as identified in European Aviation Safety Agency (EASA) AD 2018-0229, dated October 23, 2018 (“EASA AD 2018-0229”).
The FAA is superseding Airworthiness Directive (AD) 2018-19- 18, which applied to certain Airbus SAS Model A300 B4-603, B4-620, and B4-622 airplanes; Model A300 B4-600R series airplanes; Model A300 C4- 605R Variant F airplanes; and Model A300 F4-605R airplanes. AD 2018-19- 18 required, depending on airplane configuration, a modification of certain angle fitting attachment holes; repetitive inspections for cracking of certain holes of the internal lower angle fitting web, certain holes of the internal lower angle fitting horizontal splicing, the aft bottom panel, and a certain junction area; and related investigative and corrective actions if necessary. This new AD retains those actions, expands the applicability, and, for certain airplanes, requires repetitive inspections for cracking of certain holes of the center wing box (CWB) lower angle fittings and the CWB lower panel, and corrective actions if necessary, as specified in an European Aviation Safety Agency (EASA) AD, which is incorporated by reference. This AD was prompted by reports of cracking of a certain frame (FR) angle fitting. The FAA is issuing this AD to address the unsafe condition on these products.
Except as specified in paragraph (h) of this AD: Comply with all required actions and compliance times specified in, and in accordance with EASA AD 2018-0229.
(1) For purposes of determining compliance with the requirements of this AD: Where EASA AD 2018-0229 refers to its effective date, this AD requires using the effective date of this AD.
(2) The “Remarks” section of EASA AD 2018-0229 does not apply to this AD.
(3) Where Note 1 of EASA AD 2018-0229 specifies the grace period to be counted from January 6, 2001, this AD requires the grace period to be counted from December 19, 2005 (the effective date of AD 2005-23-08, Amendment 39-14366 (70 FR 69056, November 14, 2005) (“AD 2005-23-08”)).
(4) Where Note 2 and Note 4 of EASA AD 2018-0229 specify the grace periods to be counted from November 7, 2017, without exceeding certain inspection thresholds and intervals, the grace periods in those Notes for this AD are within 12 months after November 7, 2018 (the effective date of AD 2018-19-18).
(5) Paragraph (11) of EASA AD 2018-0229 specifies to report all inspection results to Airbus. For this AD, report all inspection results to Airbus Service Bulletin Reporting Online Application on Airbus World (https://w3.airbus.com/) at the applicable time specified in paragraph (h)(5)(i) or (h)(5)(ii) of this AD. The report must include the inspection results, the method of inspection, the airplane serial number, and the number of flight cycles and flight hours on the airplane.
(i) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection.
(ii) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD.
Accomplishment of the action required by paragraph (1) of EASA AD 2018-0229 and the initial inspections required by paragraphs (3), (4), and (5) of EASA AD 2018-0229 terminates all requirements of AD 2014-20-18.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.