Airworthiness Directive · Amendment 39-19640 · Wings
Bombardier, Inc., Airplanes
This AD applies to Bombardier, Inc., Model CL-600-2A12 (601) airplanes, certificated in any category, serial numbers (S/N) 3001 through 3009 inclusive and 3011 through 3029 inclusive.
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc., Model CL-600-2A12 (601) airplanes. This AD was prompted by a report of damage to the anti-rotation tab on a main landing gear (MLG) side brace fitting due to the installation of an incorrect side brace fitting shaft. This AD requires an inspection of the MLG side brace fitting for damage, a verification of the side brace fitting shaft part number, and replacement of the side brace fitting shaft if necessary. It also requires the installation of an anti- rotation bracket. We are issuing this AD to address the unsafe condition on these products.
Within 400 flight cycles or 12 months, whichever occurs first, after the effective date of this AD, do the actions specified in paragraphs (g)(1) and (g)(2) of this AD.
(1) Identify the part number of the installed side brace fitting shaft.
(2) Do a detailed visual inspection (DVI) of the side brace fitting for signs of damage, including cracking and gouges, in accordance with paragraph 2.B. of the Accomplishment Instructions of Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018.
(1) For airplanes on which a side brace fitting shaft having P/N 600-10237-3 is installed and the actions required by paragraph (g) of this AD are done on or after the effective date of this AD: Before further flight, modify the MLG side brace fitting by installing the anti-rotation bracket in accordance with paragraph 2.C. of the Accomplishment Instructions of Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018.
(2) For airplanes on which a side brace fitting shaft having P/N 600-10237-3 is installed and the actions required by paragraph (g) of this AD were done before the effective date of this AD: Within 6 months after the effective date of this AD, modify the MLG side brace fitting by installing the anti-rotation bracket in accordance with paragraph 2.C. of the Accomplishment Instructions of Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018.
(1) For airplanes on which a side brace fitting shaft having P/N 600-10237-1 or 600-10237-5 is installed and damage is found during the DVI of the side brace fitting: Before further flight, do a DVI of the anti-rotation tab and side brace fitting aft bushing for cracking, scratches, gouges, corrosion, and inner diameter tolerance, and a special detailed inspection (SDI) of the side brace fitting aft bore for cracks and defects; perform applicable repairs; replace the side brace fitting shaft with a side brace fitting shaft having P/N 600-10237-3; and install the anti-rotation bracket in accordance with paragraph 2.D. of the Accomplishment Instructions of Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018.
(2) For airplanes on which a side brace fitting shaft having P/N 600-10237-1 or 600-10237-5 is installed and no damage is found during the DVI of the side brace fitting: Within 300 flight cycles or 12 months, whichever occurs first, after the inspection required by paragraph (g)(2) of this AD, do a DVI of the anti-rotation tab and side brace fitting aft bushing for cracking, scratches, gouges, corrosion, and inner diameter tolerance, and an SDI of the side brace fitting aft bore for cracks and defects; perform applicable repairs; replace the side brace fitting shaft with a side brace fitting shaft having P/N 600-10237-3; and install the anti-rotation bracket in accordance with paragraph 2.D. of the Accomplishment Instructions of Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018.
Where Bombardier Service Bulletin 601-0624, Revision 02, dated January 29, 2018, specifies contacting Bombardier's Customer Support Engineering for repair instructions: This AD requires doing the repair before further flight using a method approved in accordance with the procedures specified in paragraph (l)(2) of this AD.