Airworthiness Directive · Amendment 39-19620 · Turbine engine compressor section
Rolls-Royce plc Turbofan Engines
This AD applies to Rolls-Royce plc (RR) Trent 1000-A2, Trent 1000-AE2, Trent 1000-C2, Trent 1000-CE2, Trent 1000-D2, Trent 1000-E2, Trent 1000-G2, Trent 1000-H2, Trent 1000-J2, Trent 1000-K2, and Trent 1000-L2 model turbofan engines with intermediate-pressure compressor (IPC) rotor seal, part number (P/N) KH77674, installed.
We are adopting a new airworthiness directive (AD) for certain Rolls-Royce plc (RR) Trent 1000-A2, Trent 1000-AE2, Trent 1000-C2, Trent 1000-CE2, Trent 1000-D2, Trent 1000-E2, Trent 1000-G2, Trent 1000-H2, Trent 1000-J2, Trent 1000-K2, and Trent 1000-L2 model turbofan engines. This AD was prompted by reports of intermediate-pressure compressor (IPC) rotor seal failures. This AD requires initial and repetitive on-wing borescope inspections (BSIs) of affected IPC rotor seals and removing any cracked parts from service. We are issuing this AD to address the unsafe condition on these products.
(1) Perform an on-wing borescope inspection (BSI) of the IPC rotor seal using the Accomplishment Instructions, Paragraph 3, of RR Alert Non-Modification Service Bulletin (NMSB) Trent 1000 72-AJ929, Initial Issue, dated November 23, 2017, as follows:
(i) For engines with an IPC rotor seal with 300 cycles since new (CSN) or more as of the effective date of this AD, perform a BSI before the IPC rotor seal accumulates 400 flight cycles (FCs) after the effective date of this AD.
(ii) For engines with an IPC rotor seal with less than 300 CSN as of the effective date of this AD, perform a BSI before the IPC rotor seal accumulates 300 CSN or within 100 FCs after the effective date of this AD, whichever is later.
(iii) For engines that were modified to incorporate RR Service Bulletin (SB) Trent 1000 72-J704, Initial Issue, dated June 23, 2017, before the effective date of this AD, perform a BSI before the IPC rotor seal accumulates 400 FCs since the shop visit modification or before the next flight, whichever occurs later.
(2) Repeat the on-wing BSI at intervals in accordance with Figure 2 of RR Alert NMSB Trent 1000 72-AJ929, Initial Issue, dated November 23, 2017.
(3) An in-shop inspection in accordance with the Accomplishment Instructions, Paragraph 3, of RR NMSB Trent 1000 72-J353, Revision 2, dated February 14, 2018, may be substituted for an on-wing BSI as required by paragraphs (g)(1) and (2) of this AD, within the compliance times specified by paragraphs (g)(1) and (2) of this AD.
(4) If a crack is found on the front face of the seal that is at or beyond the rejection limits specified in Figures 1, 2, and 3 of RR Alert NMSB Trent 1000 72-AJ929, Initial Issue, dated November 23, 2017, replace the IPC rotor seal with a part eligible for installation before further flight.
After the effective date of this AD, do not operate an aircraft that has two engines installed that are both required by this AD to complete either the 50 FCs interval inspections or the single 100 FCs fly-on period as specified in Figures 1, 2, and 3 of RR Alert NMSB Trent 1000 72-AJ929, Initial Issue, dated November 23, 2017.
None of the reporting requirements referenced in RR Alert NMSB Trent 1000 72- AJ929, Initial Issue, dated November 23, 2017; RR SB Trent 1000 72-J704, Initial Issue, dated June 23, 2017; or RR NMSB Trent 1000 72-J353, Revision 2, dated February 14, 2018, are required by this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Engines