Airworthiness Directive · Amendment 39-19458 · Fuel
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes, certificated in any category, line numbers 1 through 6899 inclusive.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes. This AD was prompted by significant changes made to the airworthiness limitations (AWL) related to fuel tank ignition prevention and the nitrogen generation system. This AD requires revision of the maintenance or inspection program, as applicable, to include the latest revision of the AWLs. We are issuing this AD to address the unsafe condition on these products.
Within 60 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the information in Section A, including Subsections A.1, A.2, and A.3, of Boeing 737-600/700/700C/800/900/900ER Special Compliance Items/Airworthiness Limitations, D626A001-9-04, Revision January 2017; except as provided in paragraph (h) of this AD. The initial compliance times for the airworthiness limitation instructions (ALI) tasks are within the applicable compliance times specified in paragraphs (g)(1) through (g)(11) of this AD:
(1) For AWL No. 28-AWL-01, “External Wires Over Center Fuel Tank”: Within 120 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, or within 120 months after the most recent inspection was performed as specified in AWL No. 28-AWL-01, whichever is later.
(2) For AWL No. 28-AWL-03, “Fuel Quantity Indicating System (FQIS)—Out Tank Wiring Lightning Shield to Ground Termination”: Within 120 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, or within 120 months after the most recent inspection was performed as specified in AWL No. 28-AWL-03, whichever is later.
(3) For AWL No. 28-AWL-19, “Center Tank Fuel Boost Pump Automatic Shutoff System”: Within 12 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1206, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-19, whichever is latest. This AWL does not apply to airplanes that have complied with paragraph (s) of AD 2011-18-03.
(4) For AWL No. 28-AWL-20, “Over-Current and Arcing Protection Electrical Design Features Operation—Boost Pump Ground Fault Interrupter (GFI)”: Within 12 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1201, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-20, whichever is latest. For airplanes that have complied with paragraph (g)(2)(ii) of AD 2011-20-07, Amendment 39-16818 (76 FR 60710, September 30, 2011), the operational test for left center tank fuel boost pump relay R54 and right center tank fuel boost pump relay R55 does not apply.
(5) For AWL No. 28-AWL-23, “Center Tank Fuel Boost Pump Power Failed On Protection System”: Within 12 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1248, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-23, whichever is latest. This AWL does not apply to airplanes that have complied with paragraph (s) of AD 2011-18-03.
(6) For AWL No. 28-AWL-24, “Spar Valve Motor Operated Valve (MOV) Actuator—Lightning and Fault Current Protection Electrical Bond”: Within 72 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1207, or within 72 months after the most recent inspection was performed as specified in AWL No. 28-AWL-24, whichever is later.
(7) For AWL No. 28-AWL-29, “Full Cushion Clamps and Teflon Sleeving (If Installed) Installed on Out-of-Tank Wire Bundles Installed on Brackets that are Mounted Directly on the Fuel Tanks”: For airplanes having line numbers (L/N) 1 through 1754 inclusive, within 120 months after accomplishment of the actions specified in Boeing Service Bulletin 737-57A1279, or within 24 months after the effective date of this AD, whichever is later. For airplanes having L/N 1755 and on, within 120 months after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, or within 24 months after the effective date of this AD, whichever is later.
(8) For AWL No. 47-AWL-04, “Nitrogen Generation System—Thermal Switch”: Within 22,500 flight hours after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 22,500 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 22,500 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-04, whichever is latest.
(9) For AWL No. 47-AWL-06, “Nitrogen Generation System (NGS)—Cross Vent Check Valve”: Within 13,000 flight hours after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 13,000 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 13,000 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-06, whichever is latest.
(10) For AWL No. 47-AWL-07, “Nitrogen Generation System (NGS)—Nitrogen Enriched Air (NEA) Distribution Ducting Integrity”: Within 6,500 flight hours after the date of issuance of the original standard airworthiness certificate or the date of issuance of the original export certificate of airworthiness, within 6,500 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 6,500 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-07, whichever is latest.
(11) For AWL No. 28-AWL-101, “Engine Fuel Suction Feed Operational Test”: Within 7,500 flight hours or 36 months, whichever occurs first, after the date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness; or within 7,500 flight hours or 36 months, whichever occurs first, after the most recent inspection was performed as specified in AWL No. 28-AWL-101; whichever is later.
As an option, when accomplishing the actions required by paragraph (g) of this AD, the changes specified in paragraphs (h)(1) and (h)(2) of this AD are acceptable.
(1) Where AWL No. 28-AWL-05 identifies wire types BMS 13-48, BMS 13-58, and BMS 13-60, the following wire types are acceptable: MIL-W-22759/16, SAE AS22759/16 (M22759/16), MIL-W-22759/32, SAE AS22759/32 (M22759/32), MIL-W-22759/34, SAE AS22759/34 (M22759/34), MIL-W-22759/41, SAE AS22759/41 (M22759/41), MIL-W-22759/86, SAE AS22759/86 (M22759/86), MIL-W-22759/87, SAE AS22759/87 (M22759/87), MIL-W-22759/92, and SAE AS22759/92 (M22759/92); and MIL-C-27500 and NEMA WC 27500 cables constructed from these military or SAE specification wire types, as applicable.
(2) Where AWL No. 28-AWL-05 identifies TFE-2X Standard wall for wire sleeving, the following sleeving materials are acceptable: Roundit 2000NX and Varglas Type HO, HP, or HM.
Except as provided in paragraph (h) of this AD, after the maintenance or inspection program, as applicable, has been revised as required by paragraph (g) of this AD, no alternative actions (e.g., inspections), intervals, and CDCCLs may be used unless the actions, intervals, and CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k) of this AD.
Accomplishment of the revision required by paragraph (g) of this AD terminates the requirements specified in paragraphs (j)(1) through (j)(5) of this AD for that airplane:
(1) The revision required by paragraphs (h) and (h)(1) of AD 2008-06-03.
(2) All requirements of AD 2008-10-10 R1.
(3) The revision required by paragraph (g) of AD 2008-17-15.
(4) The revision required by paragraph (k) of AD 2011-18-03.
(5) All requirements of AD 2013-15-17.