Airworthiness Directive · Amendment 39-19429 · Nacelles/pylons
Embraer S.A. Airplanes
Superseded. A later AD replaced this one: AD 2021-25-02. Comply with the one in force.
This AD applies to the Embraer S.A. airplanes identified in paragraphs (c)(1) and (c)(2) of this AD, certificated in any category.
(1) Model ERJ 190-100 STD, -100 LR, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes; as identified in Embraer Service Bulletin 190-54-0016, Revision 04, dated December 7, 2017.
(2) Model ERJ 190-100 ECJ airplanes as identified in Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018.
We are adopting a new airworthiness directive (AD) for certain Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 ECJ, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes. This AD was prompted by reports of bushing migration and loss of nut torque on the engine pylon lower inboard and outboard link fittings. This AD requires modification of the attaching parts of the left-hand (LH) and right-hand (RH) pylon lower link fittings, inboard and outboard positions. We are issuing this AD to address the unsafe condition on these products.
(1) Group 1 airplanes are defined as: Serial numbers 19000002, 19000004, 19000006 through 19000108 inclusive, 19000110 through 19000139 inclusive, 19000141 through 19000158 inclusive, 19000160 through 19000176 inclusive, 19000178 through 19000202 inclusive, 19000204 through 19000224 inclusive, 19000226 through 19000235 inclusive, 19000237 through 19000242 inclusive, 19000244 through 19000260 inclusive, 19000262 through 19000277 inclusive, 19000279 through 19000295 inclusive, 19000297 through 19000306 inclusive, 19000308 through 19000316 inclusive, 19000318 through 19000361 inclusive, 19000363 through 19000437 inclusive, 19000439 through 19000452 inclusive, 19000454 through 19000466 inclusive, 19000468 through 19000525 inclusive, 19000527 through 19000533 inclusive, 19000535 through 19000558 inclusive, 19000560 through 19000570 inclusive, 19000572 through 19000610 inclusive, 19000612 through 19000631 inclusive, and 19000633 through 19000636 inclusive.
(2) Group 2 airplanes are defined as: Serial numbers 19000637 through 19000640 inclusive, 19000642 through 19000655 inclusive, 19000657 through 19000682 inclusive, 19000684 through 19000686 inclusive, 19000688, 19000689, and 19000692 through 19000694 inclusive.
(1) For Group 1 airplanes as identified in paragraph (g)(1) of this AD: Within 15,000 flight hours or 48 months after the effective date of this AD, whichever occurs later, replace the plain bushings of the lower inboard and outboard link fittings, install the lock washers with the L-profile on the fuse pin's head side, and replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART I” of the Accomplishment Instructions of Embraer Service Bulletin 190-54-0016, Revision 04, dated December 7, 2017.
(2) For Group 2 airplanes as identified in paragraph (g)(2) of this AD: Within 15,000 flight hours or 48 months after the effective date of this AD, whichever occurs later, replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART I” of the Accomplishment Instructions of Embraer Service Bulletin 190-54-0016, Revision 04, dated December 7, 2017.
(3) For airplanes identified as Group 1 in Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018: Within 48 months after the effective date of this AD, replace the plain bushings of the lower inboard and outboard link fittings, install the lock washers with the L-profile on the fuse pin's head side, and replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART I” of the Accomplishment Instructions of Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018.
(4) For airplanes identified as Group 2 in Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018: Within 48 months after the effective date of this AD, replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART I” of the Accomplishment Instructions of Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018.
(1) For Group 1 airplanes as identified in paragraph (g)(1) of this AD: Within 15,000 flight hours or 48 months after the effective date of this AD, whichever occurs later, replace the plain bushings of the lower inboard and outboard link fittings, install the lock washers with the L-profile on the fuse pin's head side, and replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART II” of the Accomplishment Instructions of Embraer Service Bulletin 190-54-0016, Revision 04, dated December 7, 2017.
(2) For Group 2 airplanes as identified in paragraph (g)(2) of this AD: Within 15,000 flight hours or 48 months after the effective date of this AD, whichever occurs later, replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART II” of the Accomplishment Instructions of Embraer Service Bulletin 190-54-0016, Revision 04, dated December 7, 2017.
(3) For airplanes identified as Group 1 in Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018: Within 48 months after the effective date of this AD, replace the plain bushings of the lower inboard and outboard link fittings, install the lock washers with the L-profile on the fuse pin's head side, and replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART II” of the Accomplishment Instructions of Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018.
(4) For airplanes identified as Group 2 in Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018: Within 48 months after the effective date of this AD, replace the internal shear pin of the fuse pins with new ones having larger head diameter, in accordance with “PART II” of the Accomplishment Instructions of Embraer Service Bulletin 190LIN-54-0008, Revision 02, dated May 9, 2018.
(1) Accomplishing the actions required by paragraph (h)(1) or (h)(2) of this AD, as applicable, terminates the requirements of paragraphs (g)(1), (h)(1), and (i)(1) of AD 2014-16-16 for that LH pylon lower link fitting.
(2) Accomplishing the actions required by paragraph (h)(3) or (h)(4) of this AD, as applicable, terminates the requirements of paragraphs (g)(2), (h)(2), and (i)(2) of AD 2014-16-16 for that LH pylon lower link fitting.
(3) Accomplishing the actions required by paragraph (i)(1) or (i)(2) of this AD, as applicable, terminates the requirements of paragraphs (g)(1), (h)(1), and (i)(1) of AD 2014-16-16 for that RH pylon lower link fitting.
(4) Accomplishing the actions required by paragraph (i)(3) or (i)(4) of this AD, as applicable, terminates the requirements of paragraphs (g)(2), (h)(2), and (i)(2) of AD 2014-16-16 for that RH pylon lower link fitting.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.