Airworthiness Directive · Amendment 39-19264 · Fuselage
The Boeing Company Airplanes
(1) This AD applies to The Boeing Company Model 737-200, -300, -400, and -500 series airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin 737-53A1363, dated April 7, 2017.
(2) Installation of Supplemental Type Certificate (STC) ST01219SE (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/EBD1CEC7B301293E86257CB30045557A?OpenDocument&Highlight=st01219se) does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST01219SE is installed, a “change in product” alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 737-200, -300, -400, and -500 series airplanes. This AD was prompted by reports of cracks in the frame web common to the stringer ties adjacent to the air-conditioning support brackets. This AD requires an inspection of the frame for any air- conditioning bracket assembly or intercostal, and, depending on the results, repetitive inspections of the frame web for cracking of certain locations, and applicable on-condition actions. We are issuing this AD to address the unsafe condition on these products.
Except as required by paragraph (h) of this AD: At the applicable times specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1363, dated April 7, 2017, do all applicable actions identified as “RC” (required for compliance) in, and in accordance with, the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1363, dated April 7, 2017.
(1) Where Boeing Alert Service Bulletin 737-53A1363, dated April 7, 2017, uses the phrase “after the original issue date of this service bulletin,” for purposes of determining compliance with the requirements of this AD, the phrase “after the effective date of this AD” applies.
(2) Where Boeing Alert Service Bulletin 737-53A1363, dated April 7, 2017, specifies contacting Boeing, and specifies that action as RC: This AD requires using a method approved in accordance with the procedures specified in paragraph (j) of this AD.
Accomplishment of a reinforcement repair for a frame web crack at the stringer tie location using a method approved in accordance with the procedures specified in paragraph (j) of this AD terminates the repetitive inspections required by paragraph (g) of this AD for the repaired stringer tie location only, provided the crack is removed or trimmed out from the stringer tie holes.