Airworthiness Directive · Amendment 39-19217 · Fuel system
GA 8 Airvan (Pty) Ltd Airplanes
This AD applies to the following GA 8 Airvan (Pty) Ltd airplane models and serial numbers (S/Ns) presented in paragraphs (c)(1) and (c)(2) that are certificated in any category:
(1) Group 1 Airplanes:
(i) Model GA8: S/N GA8-02-012 and S/Ns 128 through 205; and
(ii) Model GA8-TC320: S/Ns GA8-TC 320-02-016, GA8-TC 320-03-025, GA8-TC 320-09-120, and S/Ns 129 through 205.
(2) Group 2 Airplanes:
(i) Model GA8: S/N GA8-02-012 and S/Ns 128 through 246; and
(ii) Model GA8-TC320: S/Ns GA8-TC 320-02-016, GA8-TC 320-03-025, GA8-TC 320-09-120, and S/Ns 129 through 246.
Note 1 to paragraph (c) of this AD: The last three digits (third tier designation) of the affected airplane model S/Ns are sequential regardless of the model designation (first tier designation) or the year produced (second tier designation).
We are superseding Airworthiness Directive (AD) 2013-19-12 for GA 8 Airvan (Pty) Ltd Models GA8 and GA8-TC320 airplanes. This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and address an unsafe condition on an aviation product. The MCAI describes the unsafe condition as the fuel system integral sump tank not meeting FAA regulations. We are issuing this AD to require actions to address the unsafe condition on these products.
Unless already done, do the following actions:
(1) For all affected Group 1 airplanes: Within the next 100 hours time-in-service (TIS) after April 12, 2018 (the effective date of this AD) or within the next 3 months after April 12, 2018 (the effective date of this AD), whichever occurs first, modify the airplane following Part 1 of GippsAero Service Bulletin SB-GA8-2012-96, Issue 6, dated July 21, 2016. If the airplane was previously affected under AD 2013-19-12 and compliance with that AD has already been done, this AD allows credit for doing this modification following Part 1 of GippsAero Mandatory Service Bulletin SB-GA8-2012-96, Issue 4, dated August 12, 2013.
(2) For affected Group 1 airplanes that are equipped with a cargo pod part number GA8-255004-017 or GA8-255004-019: Before further flight after the modification required in paragraph (f)(1) of this AD, modify the cargo pod following Part 2 of GippsAero Service Bulletin SB-GA8-2012-96, Issue 6, dated July 21, 2016. If the airplane was previously affected under AD 2013-19-12 and compliance with that AD has already been done, this AD allows credit for doing this modification following Part 2 of GippsAero Mandatory Service Bulletin SB-GA8-2012-96, Issue 4, dated August 12, 2013.
(3) For all affected Group 2 airplanes: Within the next 100 hours TIS after April 12, 2018 (the effective date of this AD) or within 3 months after April 12, 2018 (the effective date of this AD), whichever occurs first, modify the airplane following Part 3 of GippsAero Service Bulletin SB-GA8-2012-96, Issue 6, dated July 21, 2016.
This AD allows credit for airplanes that were previously affected by AD 2013-19-12 and the actions required in paragraphs (f)(1) and (f)(2) of this AD were previously done following Part 1 and Part 2 of GippsAero Mandatory Service Bulletin SB-GA8-2012-96, Issue 4, dated August 12, 2013.