Airworthiness Directive · Amendment 39-19142 · Fuel
The Boeing Company Airplanes
This AD applies to the Boeing Company Model MD-11 and MD-11F airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin MD11-28A150, dated October 6, 2016.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model MD-11 and MD-11F airplanes. This AD was prompted by fuel system reviews conducted by the manufacturer. This AD requires a one-time inspection of the wire assemblies of the tail fuel tank transfer pumps to determine if metallic transitions are installed at the wire harness breakouts, and corrective actions if necessary. We are issuing this AD to address the unsafe condition on these products.
Within 27 months after the effective date of this AD, do a one-time detailed inspection of the wire assemblies of the tail fuel tank transfer pumps to determine if metallic transitions are installed at the wire harness breakouts, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin MD11-28A150, dated October 6, 2016. If metallic transitions are installed, no further action is required by this paragraph. If metallic transitions are not installed, do the corrective actions required by paragraphs (g)(1) and (g)(2) of this AD, as applicable, and if, after any repair or replacement is done, any test fails, before further flight, do corrective actions, repeat the test, and do applicable corrective actions until the test is passed.
(1) Repair any affected wire assembly before further flight, in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin MD11-28A150, dated October 6, 2016, or replace any affected wire assembly with a new wire assembly before further flight, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin MD11-28A150, dated October 6, 2016. If the replacement is done, no further action is required for that wire assembly only.
(2) Within 24 months after accomplishment of the repair required by paragraph (g)(1) of this AD: Replace any repaired wire assembly with a new wire assembly, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin MD11-28A150, dated October 6, 2016.