Airworthiness Directive · Amendment 39-19095 · Landing gear
Bombardier, Inc., Airplanes
This AD applies to Bombardier, Inc., Model DHC-8-400, -401 and -402 airplanes, certificated in any category, serial numbers 4001, and 4003 through 4325 inclusive.
We are superseding Airworthiness Directive (AD) 2016-13-14, which applied to certain Bombardier, Inc., Model DHC-8-400 series airplanes. AD 2016-13-14 required an inspection to determine if certain left and right main landing gear (MLG) retract actuator rod ends were installed, repetitive liquid penetrant inspections (LPIs) of affected left and right MLG retract actuator rod ends, and corrective actions if necessary. This new AD retains the actions specified in AD 2016-13-14 and also requires replacement of the left and right MLG retract actuator rod ends. This AD was prompted by a report of a cracked MLG retract actuator rod end. We are issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (g) of AD 2016-13-14, with no changes. Within 100 flight cycles after July 20, 2016 (the effective date of AD 2016-13-14), inspect the left and right MLG retract actuator rod ends to determine if part number (P/N) P3A2750 or P3A2750-1 is installed. A review of airplane maintenance records is acceptable in lieu of this inspection if the part number can be conclusively determined from that review.
This paragraph restates the requirements of paragraph (h) of AD 2016-13-14, with no changes. For each left or right MLG retract actuator rod end having P/N P3A2750 or P3A2750-1: At the applicable time specified in paragraph (h)(1) or (h)(2) of this AD, do an LPI to detect cracks of the MLG retract actuator rod end, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-32-142, dated May 4, 2016, except as required by paragraph (k) of this AD. Thereafter, repeat the LPI at intervals not to exceed 600 flight cycles.
(1) If the MLG retract actuator rod end has accumulated more than 6,000 flight cycles as of July 20, 2016 (the effective date of AD 2016-13-14): Inspect within 100 flight cycles after July 20, 2016.
(2) If the MLG retract actuator rod end has accumulated 6,000 flight cycles or fewer as of July 20, 2016 (the effective date of AD 2016-13-14): Inspect within 600 flight cycles after July 20, 2016.
This paragraph restates the requirements of paragraph (i) of AD 2016-13-14, with no changes. If any crack is found during any inspection required by paragraph (h) of this AD, before further flight, replace the cracked MLG retract actuator rod end, P/N P3A2750 or P3A2750-1, with a MLG retract actuator rod end, P/N P3A6460, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-32-142, dated May 4, 2016, except as required by paragraph (k) of this AD.
This paragraph restates the optional replacement specified in paragraph (j) of AD 2016-13-14, with no changes. Replacement of the left and right side MLG retract actuator rod ends, P/N P3A2750 or P3A2750-1, with left and right MLG retract actuator rod ends, P/N P3A6460, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-32-142, dated May 4, 2016, except as required by paragraph (k) of this AD, constitutes terminating action for the actions required by paragraphs (g) and (h) of this AD for that airplane.
This paragraph restates the requirements of paragraph (k) of AD 2016-13-14, with no changes. If it is not possible to complete all the instructions in Bombardier Service Bulletin 84-32-142, dated May 4, 2016, because of the configuration of the airplane: Before further flight, repair using a method approved by the Manager, New York ACO Branch, FAA; or Transport Canada Civil Aviation (TCCA); or Bombardier, Inc.'s TCCA Design Approval Organization (DAO).
This paragraph restates the requirements of paragraph (l) of AD 2016-13-14, with no changes. As of July 20, 2016 (the effective date of AD 2016-13-14), no person may install a left or right MLG retract actuator rod end, P/N P3A2750 or P3A2750-1, on any airplane.
Within 1,800 flight cycles after accomplishing the initial inspection required by paragraph (g) of this AD, replace the left and right side MLG retract actuator rod ends having P/N P3A2750 or P3A2750-1, with left and right MLG retract actuator rod ends having P/N P3A6460, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-32-142, dated May 4, 2016, except as required by paragraph (k) of this AD. Accomplishing this replacement terminates the requirements of paragraphs (g) and (h) of this AD for that airplane.