Airworthiness Directive · Amendment 39-19077 · Fuel
328 Support Services GmbH (Type Certificate Previously Held by AvCraft Aerospace GmbH; Fairchild Dornier GmbH; Dornier Luftfahrt GmbH) Airplanes
This AD applies to 328 Support Services GmbH (Type Certificate Previously Held by AvCraft Aerospace GmbH; Fairchild Dornier GmbH; Dornier Luftfahrt GmbH) airplanes, certificated in any category, as identified in paragraphs (c)(1) and (c)(2) of this AD.
(1) Model 328-100 airplanes, all serial numbers.
(2) Model 328-300 airplanes, all serial numbers.
We are adopting a new airworthiness directive (AD) for certain 328 Support Services GmbH Model 328-100 and Model 328-300 airplanes. This AD was prompted by reports of broken bonding wires of certain fuel line clamps. This AD requires repetitive inspections of certain fuel line clamps for discrepancies; repetitive inspections of certain parts for chafing marks; and replacement of any discrepant parts. This AD also includes an optional modification, which is a terminating action for the inspections. We are issuing this AD to address the unsafe condition on these products.
Within 6 months after the effective date of this AD, do a general visual inspection of all Hydraflow fuel line clamps for worn and missing bonding wires; do a general visual inspection of the jet pump outlet, connection part, and fuel lines for chafing marks; and for parts with chafing marks, before further flight, measure the depth of the chafing marks; in accordance with the Accomplishment Instructions of the service information specified in paragraph (g)(1) or (g)(2) of this AD, as applicable. Repeat the inspections thereafter at intervals not to exceed 2,500 flight hours.
(1) 328 Support Services GmbH Alert Service Bulletin ASB-328-28-041, Revision 2, dated December 12, 2016 (for Model 328-100 airplanes).
(2) 328 Support Services GmbH Alert Service Bulletin ASB-328J-28-018, Revision 2, dated December 12, 2016 (for Model 328-300 airplanes).
(1) If any worn or missing bonding wires are found during any inspection required by paragraph (g) of this AD, before further flight, replace all affected clamps, in accordance with the Accomplishment Instructions of the service information specified in paragraph (g)(1) or (g)(2) of this AD, as applicable.
(2) If, during any inspection required by paragraph (g) of this AD, any chafing depth is found that is more than the replacement limits specified in the Accomplishment Instructions of the service information specified in paragraph (g)(1) or (g)(2) of this AD, as applicable, before further flight, replace all affected parts, in accordance with the Accomplishment Instructions of the service information specified in paragraph (g)(1) or (g)(2) of this AD, as applicable.
At the applicable time specified in paragraph (i)(1) or (i)(2) of this AD, report the inspection results, positive or negative, to 328 Support Services, GmbH, Global Support Center, P.O. Box 1252, D-82231 Wessling, Federal Republic of Germany; fax +49 8153 88111 6565; email gsc.op@328support.de. The report must include findings on fuel line clamps, aircraft serial number, total flight hours, and total landings.
(1) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection.
(2) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.