Airworthiness Directive · Amendment 39-19052 · Time limits
British Aerospace Regional Aircraft Airplanes
Superseded. A later AD replaced this one: AD 2023-19-05. Comply with the one in force.
This AD applies to British Aerospace Regional Aircraft Jetstream Series 3101 and Jetstream Model 3201 airplanes, all serial numbers, certificated in any category.
We are superseding Airworthiness Directive (AD) 2014-07-09 for British Aerospace Regional Aircraft Jetstream Series 3101 and Jetstream Model 3201 airplanes. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as both the need for newly added inspections for corrosion, which includes the door hinges/supporting structure and attachment bolts for the main spar joint and engine support, and inadequate existing instructions for inspection for corrosion for several areas including the rudder hinge location on the vertical stabilizer. We are issuing this AD to require actions to address the unsafe condition on these products.
Comply with paragraphs (f)(1) through (3) of this AD within the compliance times specified, unless already done:
(1) Before further flight after October 30, 2017 (the effective date of this AD), incorporate BAE Systems (Operations) Limited Jetstream Series 3100 & 3200 Corrosion Prevention and Control Programme, Manual Ref. JS/CPCP/01, Revision 8, dated October 15, 2016, into the Limitations of your FAA-approved maintenance program (instructions for continued airworthiness) on the basis of which the operator or the owner ensures the continuing airworthiness of each operated airplane, as applicable to the airplane model.
(2) Do all tasks in the BAE Systems (Operations) Limited Jetstream Series 3100 & 3200 Corrosion Prevention and Control Programme, Manual Ref. JS/CPCP/01, Revision 8, dated October 15, 2016, at the compliance times specified in the manual, or within the next 12 months after October 30, 2017 (the effective date of this AD), whichever occurs later; except for the following tasks, which must be done within 12 months after October 30, 2017 (the effective date of this AD): 52-11-002 C1, 200/EX/01 C2, 500/IN/02 C1, 600/IN/04 C1, and 700/IN/04 C1.
(3) If any discrepancy, particularly corrosion, is found during any inspections or tasks required by paragraphs (f)(1) or (2) of this AD, within the compliance time specified, repair or replace, as applicable, all damaged structural parts and components and do the maintenance procedures for corrective action following BAE Systems (Operations) Limited Jetstream Series 3100 & 3200 Corrosion Prevention and Control Programme, Manual Ref. JS/CPCP/01, Revision 8, dated October 15, 2016. If no compliance time is defined, do the applicable corrective action before further flight.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft