Airworthiness Directive · Amendment 39-19028 · Wings
Airbus Airplanes
This AD applies to Airbus Model A310-203, -204, -221, -222, -304, -322, -324, and -325 airplanes, certificated in any category, all serial numbers.
We are adopting a new airworthiness directive (AD) for all Airbus Model A310-203, -204, -221, -222, -304, -322, -324, and -325 airplanes. This AD was prompted by reports of cracking in the drainage holes on the lower skin panel in the center wing box between frames (FR) 42 and FR46. This AD requires repetitive rotating probe inspections for cracking of the trellis boom drainage holes, the holes in the stringers bottom, and the holes of the inner pump, and corrective actions if necessary. We are issuing this AD to address the unsafe condition on these products.
Except as provided by paragraph (h)(1) of this AD, before exceeding the applicable threshold or grace period, whichever occurs later, as defined in paragraph 1.E., “Compliance,” of Airbus Service Bulletin A310-57-2050, Revision 04, dated March 13, 2015, accomplish the rotating probe inspection for cracking of the trellis boom drainage holes, the holes in the stringers bottom, and the holes of the inner pump, as applicable, and do all applicable corrective actions, as specified in, and in accordance with the Accomplishment Instructions of Airbus Service Bulletin A310-57-2050, Revision 04, dated March 13, 2015, except as required by paragraph (h)(2) of this AD. Do all applicable corrective actions before further flight. Repeat the inspection thereafter at intervals not to exceed those defined in paragraph 1.E., “Compliance,” of Airbus Service Bulletin A310-57-2050, Revision 04, dated March 13, 2015.
(1) Where Airbus Service Bulletin A310-57-2050, Revision 04, dated March 13, 2015, specifies a grace period “after receipt of the Service Bulletin without exceeding previous Service Bulletin revision values,” this AD requires compliance within the specified grace period after the effective date of this AD.
(2) Where Airbus Service Bulletin A310-57-2050, Revision 04, dated March 13, 2015, specifies to contact Airbus for appropriate action, and specifies that action as “RC” (Required for Compliance): Before further flight, accomplish corrective actions in accordance with the procedures specified in paragraph (l)(2) of this AD.
Accomplishing corrective actions on an airplane as required by paragraph (g) or (h)(2) of this AD does not constitute terminating action for the repetitive actions required by paragraph (g) of this AD.
Accomplishment of the initial inspection required by paragraph (g) of this AD constitutes terminating action for the actions required by paragraph (h) of AD 2011-10-06.