Airworthiness Directive · Amendment 39-19009 · Fuselage
The Boeing Company Airplanes
This AD applies to all The Boeing Company Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes, and Model MD-88 airplanes, certificated in any category.
We are adopting a new airworthiness directive (AD) for all The Boeing Company Model DC-9-81 (MD- 81), DC-9-82 (MD-82), DC-9-83 (MD-83), and DC-9-87 (MD-87) airplanes, and Model MD-88 airplanes. This AD was prompted by reports of cracking of various structures in the bulkhead. This AD requires an inspection for cracking in these structures, and corrective actions if necessary. We are issuing this AD to address the unsafe condition on these products.
Within 700 flight cycles or 6 months after the effective date of this AD, whichever occurs first, do a detailed inspection for cracking on the left and right sides of the forward and aft surfaces of the cant station 1463 bulkhead (for Model DC-9-81 (MD-81), DC-9-82 (MD-82), and DC-9-83 (MD-83) airplanes, and Model MD-88 airplanes) and cant station 1254 bulkhead (for Model DC-9-87 (MD-87) airplanes); and do all applicable corrective actions; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin MD80-53A316, dated December 15, 2016, except as required in paragraph (h) of this AD. Do all applicable corrective actions before further flight.
Where Boeing Alert Service Bulletin MD80-53A316, dated December 15, 2016, specifies to contact Boeing for appropriate action and specifies that action as “RC” (Required for Compliance): Before further flight, repair the cracking using a method approved in accordance with the procedures specified in paragraph (k) of this AD.