Airworthiness Directive · Amendment 39-18985 · Embraer S.A. Airplanes
Embraer S.A. Airplanes
Superseded. A later AD replaced this one: AD 2019-24-16. Comply with the one in force.
This AD applies to Embraer S.A. Model ERJ 190-100 STD, -100 LR, -100 ECJ, and -100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes; certificated in any category; serial numbers 19000002, 19000004, 19000006 through 19000213 inclusive, 19000215 through 19000276 inclusive, 19000278 through 19000466 inclusive, 19000468 through 19000525 inclusive, and 19000527 through 19000696 inclusive.
We are superseding Airworthiness Directive (AD) 2012-23-09, which applied to all Embraer S.A. Model ERJ 190-100 STD, -100 LR, and - 100 IGW airplanes; and Model ERJ 190-200 STD, -200 LR, and -200 IGW airplanes. AD 2012-23-09 required revising the maintenance program to incorporate certain modifications in airworthiness limitations. This new AD requires revising the maintenance or inspection program to incorporate certain modifications in the airworthiness limitations to include new inspection tasks and their respective thresholds and intervals. This AD was prompted by our determination that more restrictive maintenance requirements and airworthiness limitations are necessary. We are issuing this AD to address the unsafe condition on these products.
For Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW, ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes: This paragraph restates the actions required by paragraph (h) of AD 2012-23-09, with no changes. Within 90 days after January 14, 2013 (the effective date of AD 2012-23-09), revise the maintenance program to incorporate the tasks specified in Part 2—Airworthiness Limitation Inspections (ALI)—Structures, of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010; and EMBRAER Temporary Revision (TR) 5-1, dated February 11, 2011, to Part 2—Airworthiness Limitation Inspections (ALI)—Structures, of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010; with the thresholds and intervals stated in these documents. The initial compliance times for the tasks are stated in the “Implementation Plan” section of Appendix A, Airworthiness Limitations (AL), of the EMBRAER 190 Maintenance Review Board Report, MRB-1928, Revision 5, dated November 11, 2010.
This paragraph restates the actions required by paragraph (i) of AD 2012-23-09, with a new exception. After accomplishing the revision required by paragraph (g) of this AD, no alternative actions (e.g., inspections) or intervals, may be used, unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD, and except as required by paragraph (i) of this AD.
(1) For Model ERJ 190-100 STD, ERJ 190-100 LR, ERJ 190-100 IGW, ERJ 190-200 STD, ERJ 190-200 LR, and ERJ 190-200 IGW airplanes: Within 90 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the tasks specified in Part 2—Airworthiness Limitation Inspections—Structures, of Appendix A—Airworthiness Limitations (AL), of the EMBRAER 190/195 Maintenance Review Board Report, MRB-1928, Revision 9, dated August 14, 2015 (“MRB-1928, Revision 9”); EMBRAER MRB—TR 9-1, dated October 27, 2015, to Part 2—Airworthiness Limitation Inspections—Structures, and Part 4—Life Limited Items, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; and EMBRAER MRB—TR 9-3, dated October 27, 2015, to Part 2—Airworthiness Limitation Inspections—Structures, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; with the thresholds and intervals stated in these documents. The initial compliance times for the tasks are at the later of the times specified in paragraphs (i)(1)(i) and (i)(1)(ii) of this AD. Doing the revision required by this paragraph terminates the revision required by paragraph (g) of this AD.
(i) Within the applicable times specified in MRB-1928, Revision 9; EMBRAER MRB—TR 9-1, dated October 27, 2015, to Part 2—Airworthiness Limitation Inspections—Structures, and Part 4—Life Limited Items, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9; and EMBRAER MRB—TR 9-3, dated October 27, 2015, to Part 2—Airworthiness Limitation Inspections—Structures, of Appendix A, Airworthiness Limitations (AL), of MRB-1928, Revision 9. Where tasks are listed in both MRB-1928, Revision 9, and a temporary revision, the compliance times in the temporary revision take precedence.
(ii) Within 90 days or 600 flight cycles after the effective date of this AD, whichever occurs later.
(2) For Model ERJ 190-100 ECJ airplanes: Within 90 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the tasks specified in Part 1, Certification Maintenance Requirements, Part 2, Airworthiness Limitation Inspections—Structures, Part 3, Fuel System Limitation Items, and Part 4, Life Limited Items, of Appendix A, Airworthiness Limitation, of the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14, 2014; EMBRAER MPG—TR 4-2, dated February 13, 2015; and EMBRAER MPG—TR 4-3, dated October 30, 2015; with the thresholds and intervals stated in these documents. The initial compliance times for the tasks are at the later of the times specified in paragraphs (i)(2)(i) and (i)(2)(ii) of this AD.
(i) Within the applicable times specified in Part 1, Certification Maintenance Requirements, Part 2, Airworthiness Limitation Inspections—Structures, Part 3, Fuel System Limitation Items, and Part 4, Life Limited Items, of Appendix A, Airworthiness Limitation (AL), of the EMBRAER Lineage 1000/1000E Maintenance Planning Guide, MPG-2928, Revision 4, dated July 14, 2014; EMBRAER MPG—TR 4-2, dated February 13, 2015; and EMBRAER MPG—TR 4-3, dated October 30, 2015. Where tasks are listed in both MPG-2928, Revision 4, and a temporary revision, the compliance times in the temporary revision take precedence.
(ii) Within 90 days or 600 flight cycles after the effective date of this AD, whichever occurs later.
After accomplishment of the revision required by paragraph (i) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used unless the actions, intervals, and/or CDCCLs are approved as an AMOC in accordance with the procedures specified in paragraph (k)(1) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.