Airworthiness Directive · Amendment 39-18941 · Flight controls
Gulfstream Aerospace Corporation Airplanes
This AD applies to all Gulfstream Aerospace Corporation Model G-IV airplanes, certificated in any category.
We are adopting a new airworthiness directive (AD) for all Model G-IV airplanes. This AD was prompted by a report indicating that the G-IV gust lock system allows more throttle travel than was intended and could allow the throttle to be advanced to reach take-off thrust. This AD requires modification of the gust lock system, and a revision of the maintenance or inspection program to incorporate functional tests. We are issuing this AD to address the unsafe condition on these products.
Within 36 months after the effective date of this AD, modify the gust lock system by doing a retrofit of the gust lock throttle interlock, in accordance with the Accomplishment Instructions of the applicable service information specified in paragraph (g)(1), (g)(2), or (g)(3) of this AD.
(1) Gulfstream IV Customer Bulletin Number 236B, dated February 3, 2017.
(2) Gulfstream G300 Customer Bulletin Number 236B, dated February 3, 2017.
(3) Gulfstream G400 Customer Bulletin Number 236B, dated February 3, 2017.
Within 90 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate a functional test of the throttle lever gust lock protection specified in the applicable temporary revision (TR) identified in paragraphs (h)(1) through (h)(4) of this AD. The initial compliance time for the functional test is within the applicable time specified in paragraphs (h)(1) through (h)(4) of this AD, or within 90 days after the effective date of this AD, whichever occurs later. The functional test must be done in accordance with the applicable service information specified in paragraphs (i)(1) through (i)(4) of this AD.
(1) For Gulfstream IV Maintenance Manual TR 5-7, dated April 29, 2016: Within 12 months or 4,500 flight hours, whichever occurs first after accomplishing the modification required by paragraph (g) of this AD.
(2) For Gulfstream IV MSG-3 Maintenance Manual TR 5-6, dated April 29, 2016: Before the next 1C maintenance check or within 4,500 flight hours, whichever occurs first after accomplishing the modification required by paragraph (g) of this AD.
(3) For Gulfstream G300 Maintenance Manual TR 5-3, dated April 29, 2016: Before the next 1C maintenance check or within 4,500 flight hours, whichever occurs first after accomplishing the modification required by paragraph (g) of this AD.
(4) For Gulfstream G400 Maintenance Manual TR 5-3, dated April 29, 2016: Before the next 1C maintenance check or within 4,500 flight hours, whichever occurs first after accomplishing the modification required by paragraph (g) of this AD.
The functional test of the throttle lever gust lock protection specified in paragraph (h) of this AD must be done in accordance with the applicable service information specified in paragraphs (i)(1) through (i)(4) of this AD.
(1) Gulfstream IV Maintenance Manual TR 27-3, dated April 29, 2016.
(2) Gulfstream IV MSG-3 Maintenance Manual TR 27-3, dated April 29, 2016.
(3) Gulfstream G300 Maintenance Manual TR 27-3, dated April 29, 2016.
(4) Gulfstream G400 Maintenance Manual TR 27-3, dated April 29, 2016.
After the maintenance or inspection program has been revised as required by paragraph (h) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (m) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft