Airworthiness Directive · Amendment 39-18923 · Periodic inspections
BAE Systems (Operations) Limited Airplanes
Superseded. A later AD replaced this one: AD 2022-06-14. Comply with the one in force.
This AD applies to BAE Systems (Operations) Limited Model BAe 146-100A, -200A, and -300A airplanes; and Model Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A airplanes; certificated in any category; all serial numbers.
We are superseding Airworthiness Directive (AD) 2011-24-06 for all BAE Systems (Operations) Limited Model BAe 146-100A, -200A, and - 300A airplanes; and Model Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A airplanes. AD 2011-24-06 required revising the maintenance program to incorporate life limits for certain items, adding new and more restrictive inspections to detect fatigue cracking in certain structures, and adding fuel system critical design configuration control limitations (CDCCLs) to prevent ignition sources in the fuel tanks. AD 2011-24-06 also required modifying the main fittings of the main landing gear (MLG) and revising the maintenance program to incorporate new life limits on MLG up-locks and door up-locks and other MLG components. This new AD requires revising the maintenance or inspection program, as applicable, to incorporate new or revised structural inspection requirements. This AD was prompted by a determination that new or revised structural inspection requirements are necessary. We are issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (j) of AD 2011-24-06, with no changes. Within 90 days after January 3, 2012 (the effective date of AD 2011-24-06), revise the maintenance program, by incorporating Subject 05-10-15, “Aircraft Equipment Airworthiness Limitations” of Chapter 05, “Time Limits/Maintenance Checks,” of the BAE Systems (Operations) Limited BAe 146 Series/Avro 146-RJ Series Aircraft Maintenance Manual (AMM), Revision 104, dated April 15, 2011, to remove life limits on shock absorber assemblies, but not the individual shock absorber components, amend life limits on main landing gear (MLG) up-locks and door up-locks, and to introduce and amend life limits on MLG components. Accomplishing the actions required by paragraph (i) of this AD terminates the actions required by this paragraph.
This paragraph restates the requirements of paragraph (k) of AD 2011-24-06, with no changes. Except as specified in paragraph (i) of this AD: After accomplishing the revision required by paragraph (g) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used, unless the actions, intervals, and/or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD.
Within 90 days after the effective date of this AD: Revise the maintenance or inspection program, as applicable, to incorporate new and revised limitations, tasks, thresholds, and intervals using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA. Accomplishing the actions required by this paragraph terminates the actions required by paragraph (g) of this AD.
Note 1 to paragraph (i) of this AD: An additional source of guidance for the actions specified in paragraph (i) of this AD can be found in BAe 146/AVRO 146-RJ Airplane Maintenance Manual, Revision 112, dated October 15, 2013.
Note 2 to paragraph (i) of this AD: An additional source of guidance for the actions specified in paragraph (i) of this AD can be found in Corrosion Prevention Control Program (CPCP) Document No. CPCP-146-01, Revision 4, dated September 15, 2010.
Note 3 to paragraph (i) of this AD: An additional source of guidance for the actions specified in paragraph (i) of this AD can be found in Supplemental Structural Inspections Document (SSID) Document No. SSID-146-01, Revision 2, dated August 15, 2012.
Note 4 to paragraph (i) of this AD: An additional source of guidance for the actions specified in paragraph (i) of this AD can be found in Maintenance Review Board Report Document No. MRB 146-01, Issue 2, Revision 19, dated August 2012.
Note 5 to paragraph (i) of this AD: An additional source of guidance for the actions specified in paragraph (i) of this AD can be found in BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-237, Revision 1, dated April 2, 2013.
After accomplishment of the revision required by paragraph (i) of this AD, no alternative actions (e.g., inspections), intervals, and/or CDCCLs may be used, unless the actions, intervals, and/or CDCCLs are approved as an AMOC in accordance with the procedures specified in paragraph (k)(1) of this AD.