Airworthiness Directive · Amendment 39-18898 · Periodic inspections
Airbus Airplanes
Superseded. A later AD replaced this one: AD 2022-18-01. Comply with the one in force.
This AD applies to the Airbus airplanes identified in paragraphs (c)(1), (c)(2), and (c)(3) of this AD, certificated in any category, with an original certificate of airworthiness or original export certificate of airworthiness issued on or before April 11, 2016.
(1) Airbus Model A330-201, -202, -203, -223, and -243 airplanes.
(2) Airbus Model A330-223F and -243F airplanes.
(3) Airbus Model A330-301, -302, -303, -321, -322, -323, -341, -342, and -343 airplanes.
We are superseding Airworthiness Directive (AD) 2011-17- 09 for all Airbus Model A330-200, -200 Freighter, and -300 series airplanes; and AD 2012-25-12 for all Airbus Model A330-200 and -300 series airplanes. AD 2011-17-09 required revisions to certain operator maintenance documents to include new inspections. AD 2012-25-12 required replacing certain main landing gear (MLG) bogie beams before reaching new reduced life limits. This new AD requires revising the maintenance or inspection program, as applicable, to incorporate new, more restrictive, or revised instructions and/or airworthiness limitation requirements. This AD was prompted by revisions to certain airworthiness limitation item (ALI) documents, which specify more restrictive instructions and/or airworthiness limitations. We are issuing this AD to address the unsafe condition on these products.
This paragraph restates the requirements of paragraph (h) of AD 2011-17-09, with new terminating action. Within 3 months after September 30, 2011 (the effective date of AD 2011-17-09): Revise the maintenance program by incorporating Airbus A330 Airworthiness Limitations Section (ALS) Part 1, Safe Life Airworthiness Limitation Items (SL-ALI), Revision 05, dated July 29, 2010. Comply with all ALIs in Airbus A330 ALS Part 1, SL-ALI, Revision 05, dated July 29, 2010, at the times specified therein. Accomplishing the actions specified in paragraph (k) of this AD terminates the requirements of this paragraph.
This paragraph restates the requirements of paragraph (i) of AD 2011-17-09, with additional exception. Except as provided by paragraphs (k) and (m)(1) of this AD, after accomplishment of the actions specified in paragraph (g) of this AD, no alternatives to the maintenance tasks, intervals, or limitations specified in paragraph (g) of this AD may be used.
This paragraph restates the requirements of paragraph (g) of AD 2012-25-12, with specific delegation approval language and terminating action and new service information. For airplanes identified in paragraphs (c)(1) and (c)(3) of this AD: At the later of the times specified in paragraphs (i)(1) and (i)(2) of this AD, replace all main landing gear (MLG) bogie beams having part number (P/N) 201485300, 201485301, 201272302, 201272304, 201272306, or 201272307, except those that have serial number (S/N) S2A, S2B, or S2C, as identified in Messier-Dowty Service Letter A33-34 A20, Revision 5, including Appendixes A through F, dated July 31, 2009; or Messier-Bugatti-Dowty Service Letter A33-34 A20, Revision 7, including Appendixes A through F, dated July 20, 2012; with a new or serviceable part, using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the European Aviation Safety Agency (EASA); or Airbus's EASA Design Organization Approval (DOA). As of the effective date of this AD, the applicable MLG bogie beams specified in this paragraph must be replaced using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or EASA; or Airbus's EASA DOA. Accomplishing the actions specified in paragraph (k) of this AD terminates the requirements of this paragraph.
(1) At the applicable time specified in paragraphs (i)(1)(i), (i)(1)(ii), and (i)(1)(iii) of this AD.
(i) For Model A330-201, -202, -203, -223, -243 series airplanes, weight variant (WV)02x, WV05x (except WV058), and WV06x series: Before the accumulation of a life limit of 50,000 landings or 72,300 total flight hours, whichever occurs first from the first installation of a MLG bogie beam on the airplane.
(ii) For Model A330-201, -202, -203, -223, -243 WV058 series airplanes: Before the accumulation of a life limit of 50,000 landings or 57,900 total flight hours, whichever occurs first from the first installation of a MLG bogie beam on the airplane.
(iii) For Model A330-301, -302, -303, -321, -322, -323, -341, -342, -343 series airplanes, WV00x, WV01x, WV02x, and WV05x series: Before the accumulation of a life limit of 46,000 landings or 75,000 total flight hours, whichever occurs first from the first installation of a MLG bogie beam on the airplane.
(2) Within 6 months after January 30, 2013 (the effective date of AD 2012-25-12).
This paragraph restates the requirements of paragraph (h) of AD 2012-25-12, with new terminating action. For airplanes identified in paragraphs (c)(1) and (c)(3) of this AD, as of January 30, 2013 (the effective date of AD 2012-25-12), a MLG bogie beam having any part number identified in paragraph (i) of this AD may be installed on an airplane, provided its life has not exceeded the life limit specified in paragraphs (i)(1)(i), (i)(1)(ii), and (i)(1)(iii) of this AD, and it is replaced with a new or serviceable part before reaching the life limit specified in paragraphs (i)(1)(i), (i)(1)(ii), and (i)(1)(iii) of this AD. Accomplishing the actions specified in paragraph (k) of this AD terminates the requirements of this paragraph.
Within 3 months after the effective date of this AD: Revise the maintenance or inspection program, as applicable, by incorporating the information in Airbus A330 ALS Part 1, SL-ALI, Revision 08, dated April 11, 2016. The initial compliance times for the actions specified in Airbus A330 ALS Part 1, SL-ALI, Revision 08, dated April 11, 2016, are at the times specified in Airbus A330 ALS Part 1, SL-ALI, Revision 08, dated April 11, 2016, or within 3 months after the effective date of this AD, whichever occurs later. Accomplishing the actions specified in this paragraph terminates the requirements specified in paragraphs (g) through (j) of this AD.
After the maintenance or inspection program, as applicable, has been revised, as required by paragraph (k) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (m)(1) of this AD.