Airworthiness Directive · Amendment 39-18843 · Landing gear
Airbus Airplanes
Superseded. A later AD replaced this one: AD 2019-03-10. Comply with the one in force.
This AD applies to Airbus airplanes identified in paragraphs (c)(1) through (c)(5) of this AD, certificated in any category, all manufacturer serial numbers.
(1) Model A300 B2-1A, B2-1C, B2K-3C, B2-203, B4-2C, B4-103, and B4-203 airplanes.
(2) Model A300 B4-601, B4-603, B4-620, and B4-622 airplanes.
(3) Model A300 B4-605R and B4-622R airplanes.
(4) Model A300 F4-605R and F4-622R airplanes.
(5) Model A300 C4-605R Variant F airplanes.
We are adopting a new airworthiness directive (AD) for all Airbus Model A300 series airplanes; and Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes). This AD was prompted by reports of cracks in main landing gear (MLG) leg components. This AD requires detailed visual inspections of these MLG leg components and replacement of the MLG leg if cracked components are found. We are issuing this AD to address the unsafe condition on these products.
Within the compliance time specified in paragraphs (g)(1) and (g)(2) of this AD, whichever occurs later, and thereafter at intervals not to exceed 100 flight cycles: Accomplish a detailed visual inspection of the internal diameter of each affected MLG hinge arm/barrel pin, in accordance with the instructions of Airbus Alert Operators Transmission (AOT) A32W008-16, dated February 25, 2016, including Appendices 1 through 4. The affected MLG hinge arm/barrel pins are those with part number C66441-(x) and part number C65543-(x), where the x represents a variable number.
(1) Within 30 months since the pin's first flight on an airplane, or since the pin's first flight on an airplane after overhaul, as applicable.
(2) Within 30 days after the effective date of this AD.
If any cracked pin is found during any inspection required by paragraph (g) of this AD, before further flight, replace the MLG leg with a serviceable unit, in accordance with the instructions of Airbus AOT A32W008-16, dated February 25, 2016, including Appendices 1 through 4. Replacement of a MLG leg does not constitute terminating action for the repetitive inspections required by paragraph (g) of this AD.
At the applicable time specified in paragraph (i)(1) or (i)(2) of this AD, report the results of the inspections required by paragraph (g) of this AD to Airbus, in accordance with the instructions of Airbus AOT A32W008-16, dated February 25, 2016, including Appendices 1 through 4.
(1) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection.
(2) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.