Airworthiness Directive · Amendment 39-18824 · Fuel control/turbine engines
Safran Helicopter Engines, S.A., Turboshaft Engines
Superseded. A later AD replaced this one: AD 2017-15-07. Comply with the one in force.
This AD applies to all Safran Helicopter Engines, S.A., Arriel 1A1, 1A2, 1B, 1C, 1C1, 1C2, 1D, 1D1, 1E2, 1K1, 1S, and 1S1 turboshaft engines equipped with a drain valve assembly (DV) with a part number and a serial number listed in Appendix 5.1 in Safran Helicopter Engines Alert Mandatory Service Bulletin (MSB) A292 73 0851, Version A, dated January 31, 2017.
We are adopting a new airworthiness directive (AD) for all Safran Helicopter Engines, S.A., Arriel 1A1, 1A2, 1B, 1C, 1C1, 1C2, 1D, 1D1, 1E2, 1K1, 1S, and 1S1 turboshaft engines. Emergency AD 2017-04-51 was sent previously to all known U.S. owners and operators of these engines. This AD requires inspecting, wrapping, and replacing the affected drain valve assembly (DV) installed on these Arriel 1 engines. This AD was prompted by reports of fuel leaks originating from the DV on certain Arriel engines. We are issuing this AD to correct the unsafe condition on these products.
(1) Comply with this AD within the compliance times specified, unless already done.
(2) Within 10 flight hours or 7 days, whichever occurs first, after the effective date of this AD:
(i) Replace the affected DV with a DV eligible for installation. Use the Accomplishment Instructions, Paragraph 2, of Safran Helicopter Engines Alert MSB A292 73 0851, Version A, dated January 31, 2017, to do the replacement; or
(ii) Visually inspect the affected DV for fuel leakage.
(A) If a fuel leak is detected, replace the affected DV with a DV eligible for installation, before the next flight.
(B) If no fuel leak is detected, before next flight, wrap the affected DV with a self-amalgamate tape using the Accomplishment Instructions, paragraph 2, of Safran Helicopter Engines Alert MSB A292 73 0851, Version A, dated January 31, 2017.
(C) After wrapping an affected DV, as specified in paragraph (f)(2)(ii)(B) of this AD, inspect the DV for fuel leakage before each first flight of the day. If a fuel leak is detected, replace the affected DV with a DV eligible for installation, before the next flight.
(D) After wrapping an affected DV, as specified in paragraph (f)(2)(ii)(B) of this AD, inspect the DV wrapping before each first flight of the day. If the wrapping is found defective (loose, missing, or damaged), before the next flight, remove the wrap and re-wrap the affected DV using the Accomplishment Instructions, paragraph 2, of Safran Helicopter Engines Alert MSB A292 73 0851, Version A, dated January 31, 2017.
(E) For an engine on which the affected DV was wrapped, within 180 days after the first wrapping of the affected DV as specified in paragraph (f)(2)(ii)(B) of this AD, replace the affected DV with a DV eligible for installation.
For the purpose of this AD, a DV eligible for installation is:
(1) a DV that is not affected by this AD; or
(2) a DV in which the diaphragm has been replaced in accordance with the instructions in paragraph 4 of Safran Helicopter Engines Alert MSB A292 73 0851, Version A, dated January 31, 2017.
Replacement of an affected DV installed on an engine, with a DV eligible for installation constitutes terminating action for the repetitive inspections required by paragraph (f)(2)(ii) of this AD.