Airworthiness Directive · Amendment 39-18803 · Fuselage
The Boeing Company Airplanes
(1) This AD applies to The Boeing Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015.
(2) Installation of Supplemental Type Certificate (STC) ST01219SE (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/BE866B732F6CF31086257B9700692796?OpenDocument&Highlight=st01219se) does not affect the ability to accomplish the actions required by this AD. Therefore, for airplanes on which STC ST01219SE is installed, a ”change in product” alternative method of compliance (AMOC) approval request is not necessary to comply with the requirements of 14 CFR 39.17.
We are superseding Airworthiness Directive (AD) 2008-13-12 R1 for certain The Boeing Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes. AD 2008-13-12 R1 required various repetitive inspections for cracking of a certain splice of the fuselage, and other specified and corrective actions if necessary; and provided for an optional preventive modification, which terminated the repetitive inspections. This new AD adds an inspection to determine if the existing frame repair meets all specified requirements; a modification of a certain splice, which terminates the repetitive inspections; reduces certain inspection thresholds and repetitive intervals; and adds post-repair/post-modification inspections. This AD was prompted by reports of additional fatigue cracking of a certain splice of the fuselage and one report of a severed frame, due to susceptibility to widespread fatigue damage (WFD). We are issuing this AD to address the unsafe condition on these products.
(1) For Groups 1 through 3, Configurations 1, 3, 4, and 5 airplanes; Group 7, Configurations 1, 3, 4, and 5 airplanes; Groups 4 through 6, Configurations 1, 3, 4, and 6 airplanes; and Groups 8 through 11, Configurations 1, 3, 4, and 6 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Do the actions specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this AD, and all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD. Do all applicable corrective actions before further flight.
(i) At the applicable time specified in Tables 1, 2, 3, 5, 6, and 8 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraphs (i)(1) and (i)(2) of this AD: Do medium frequency eddy current inspections for cracking of the upper-frame-to-side-frame splice of the fuselage.
(ii) Repeat the inspections specified in paragraph (g)(1)(i) of this AD at the applicable time specified in Tables 1, 2, 3, 5, 6, and 8 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, until the preventive modification required by paragraph (k) of this AD, or a terminating action specified in paragraph (l) of this AD, has been accomplished. The inspections are terminated for the repaired or modified areas only.
(2) For Groups 4 through 6, Configurations 2 and 5 airplanes; and Groups 8 through 11, Configurations 2 and 5 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Do the actions specified in paragraphs (g)(2)(i) and (g)(2)(ii) of this AD, and all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD. Do all applicable corrective actions before further flight.
(i) At the applicable time specified in Tables 4 and 7 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraphs (i)(1) and (i)(2) of this AD: Do a detailed inspection to determine if the existing frame repair meets all requirements specified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, and for any frame repair that does meet all requirements, do detailed and high frequency eddy current (HFEC) inspections for cracking of the existing frame repairs.
(ii) Repeat the inspections for cracking specified in paragraph (g)(2)(i) of this AD at the applicable time specified in Tables 4 and 7 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015.
For Group 1, Configurations 2 and 6 airplanes; Group 2, Configurations 2 and 6 airplanes; Group 3, Configurations 2 and 6 airplanes; and Group 7, Configurations 2 and 6 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Within 120 days after the effective date of this AD, do post-repair and post-modification actions using a method approved in accordance with the procedures specified in paragraph (n) of this AD.
(1) Where Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, specifies a compliance time “after the Revision 1 date of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(2) Where the “Condition” column of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, specifies a condition based on whether an airplane has or has not been inspected, this AD bases the condition on whether an airplane has or has not been inspected as of the effective date of this AD.
(3) Where Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, specifies to contact Boeing for repair instructions: Before further flight, repair using a method approved in accordance with the procedures specified in paragraph (n) of this AD.
For Groups 4 through 6, Configurations 1, 3, 4, 6, 7, 8, 9, and 10 airplanes; and Groups 8 through 11, Configurations 1, 3, 4, 6, 7, 8, 9, and 10 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Except as provided by paragraphs (i)(1) and (i)(2) of this AD, at the applicable time specified in Tables 12 through 17 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015; do the post-repair/post-modification inspections, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD. Do all applicable corrective actions before further flight.
For Groups 4 through 6, Configurations 1, 3, 4, and 6 airplanes; and Groups 8 through 11, Configurations 1, 3, 4, and 6 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Except as provided by paragraphs (i)(1) and (i)(2) of this AD, at the applicable time specified in Tables 3, 5, 6, and 8 in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, do the preventive modification, including HFEC inspections for cracking and applicable corrective actions, in accordance with Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD. Do all applicable corrective actions before further flight. Accomplishing the modification required by this paragraph terminates the inspections required by paragraph (g)(1) of this AD for the modified area only.
(1) For Groups 4 through 6, Configurations 1, 3, 4, and 6 airplanes; and Groups 8 through 11, Configurations 1, 3, 4, and 6 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Accomplishing the preventive modification, including HFEC inspections for cracking and applicable corrective actions, in accordance with Part 4 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD, terminates the inspections required by paragraph (g)(1) of this AD for the modified area only.
(2) For Groups 4 through 6, Configurations 3 and 6 airplanes; and Groups 8 through 11, Configurations 3 and 6 airplanes; as identified in Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015: Accomplishing the repair, including HFEC inspections for cracking and applicable corrective actions, in accordance with Part 3 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-53A1261, Revision 1, dated January 30, 2015, except as required by paragraph (i)(3) of this AD, terminates the repetitive inspections required by paragraph (g)(1) of this AD, and the preventive modification required by paragraph (k) of this AD, for the repaired area only.
(3) Accomplishment of the repair or the preventive modification specified in Boeing Message M-7200-02-1294, dated August 20, 2002, before the effective date of this AD terminates the repetitive inspections required by paragraph (g)(1) of this AD and the preventive modification required by paragraph (k) of this AD for the repaired or modified area only.