Airworthiness Directive · Amendment 39-18776 · Air conditioning
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 767-300 and 767-300F series airplanes, certificated in any category; as identified in the service information specified in paragraphs (c)(1) through (c)(5) of this AD. This AD does not apply to The Boeing Company Model 767-300 (passenger) series airplanes.
(1) Boeing Service Bulletin 767-21-0244, Revision 1, dated March 8, 2010 (“SB 767-21-0244, R1”).
(2) Boeing Alert Service Bulletin 767-21A0245, Revision 2, dated September 27, 2013 (“ASB 767-21A0245, R2”).
(3) Boeing Alert Service Bulletin 767-21A0247, Revision 1, dated April 9, 2013 (“ASB 767-21A0247, R1”).
(4) Boeing Alert Service Bulletin 767-21A0253, dated October 12, 2012.
(5) Boeing Alert Service Bulletin 767-21A0254, dated June 7, 2013.
The FAA is correcting an airworthiness directive (AD) that published in the Federal Register. That AD applies to certain The Boeing Company Model 767-300 and 767-300F airplanes. Certain service information citations in the preamble and regulatory text are incorrect. This document corrects those errors. In all other respects, the original document remains the same.
(1) For Model 767-300F series airplanes, as identified in Boeing Alert Service Bulletin 767-21A0253, dated October 12, 2012: Within 72 months after the effective date of this AD, in the main equipment center and the area under the left and right sides of the flight deck floor, replace the existing duct with a new duct; install an FDARS (including the installation of mounting brackets, ducts, orifice, outlet valve, and screen); change the 3-way valve logic (including modification of the associated wiring and related actions); and install a new altitude switch and pitot tube; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 767-21A0253, dated October 12, 2012.
(2) For Model 767-300F series airplanes, as identified in Boeing Alert Service Bulletin 767-21A0254, dated June 7, 2013: Within 72 months after the effective date of this AD, in the main equipment center and the area under the left and right sides of the flight deck floor, replace the duct with a new duct; install an FDARS (including the installation of mounting brackets, ducts, orifice, outlet valve, and screen); and activate the 3-way valve logic (including modification of the associated wiring and related actions); in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 767-21A0254, dated June 7, 2013.
(1) For Model 767-300F series airplanes, as identified in ASB 767-21A0245, R2: Within 72 months after the effective date of this AD, in the main equipment center and the area under the left and right sides of the flight deck floor, change (modify) the 3-way valve control logic and main cargo air distribution system (MCADS), and install an FDARS, in accordance with the Accomplishment Instruction of ASB 767-21A0245, R2, except as provided by paragraph (j) of this AD.
(2) For Model 767-300F series airplanes, as identified in ASB 767-21A0247, R1: Within 72 months after the effective date of this AD, change (modify) the 3-way valve control logic and MCADS, and install an FDARS, in accordance with the Accomplishment Instructions of ASB 767-21A0247, R1.
For Model 767-300 series airplanes that have been converted by Boeing to Model 767-300BCF (Boeing Converted Freighter) airplanes, as identified in SB 767-21-0244, R1: Within 72 months after the effective date of this AD, change (modify) the 3-way valve control logic and install a flight deck display equipment cooling system, in accordance with the Accomplishment Instructions of SB 767-21-0244, R1.
For Model 767-300F series airplanes, as identified in ASB 767-21A0245, R2: If the 3 way valve control logic change (modification) specified in Boeing Service Bulletin 767-21-0235, dated October 8, 2009; or Revision 1, dated July 29, 2011 (“SB 767-21-0235, R1”); is done prior to or concurrent with the actions required by paragraph (h)(1) of this AD, operators need to do only the functional test, FDARS installation, and flex duct change, in accordance with the Accomplishment Instructions of ASB 767-21A0245, R2. Operators do not need to do the other actions specified in the Accomplishment Instructions of ASB 767-21A0245, R2, if the actions in the Accomplishment Instructions of Boeing Service Bulletin 767-21-0235, dated October 8, 2009; or SB 767-21-0235, R1; are done concurrently. If the functional test fails, before further flight, do corrective actions that are approved in accordance with the procedures specified in paragraph (l) of this AD.
(1) For Groups 1 and 3 airplanes, as identified in ASB 767-21A0245, R2: Prior to or concurrently with accomplishing the requirements of paragraph (h)(1) of this AD, do the relay installation and related wiring changes specified in, and in accordance with, the Accomplishment Instructions of Boeing Service Bulletin 767-21-0235, dated October 8, 2009; or SB 767-21-0235, R1.
(2) For Group 1 airplanes, as identified in ASB 767-21A0247, R1: Prior to or concurrently with accomplishing the requirements of paragraph (h)(2) of this AD, do the relay installation and related wiring changes specified in the Accomplishment Instructions of Boeing Service Bulletin 767-21-0235, dated October 8, 2009; or SB 767-21-0235, R1.
(3) For Model 767-300 series airplanes that have been converted by Boeing to Model 767-300BCF airplanes, as identified in SB 767-21-0244, R1: Prior to or concurrently with accomplishing the requirements of paragraph (i) of this AD, do all the actions (installation) specified in the Accomplishment Instructions of Boeing Service Bulletin 767-31-0073, dated October 12, 1995.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.