Airworthiness Directive · Amendment 39-18725 · Rolls-Royce plc Turbofan Engines
Rolls-Royce plc Turbofan Engines
Superseded. A later AD replaced this one: AD 2020-25-04. Comply with the one in force.
This AD applies to Rolls-Royce plc (RR) RB211-Trent 875-17, RB211-Trent 877-17, RB211-Trent 884-17, RB211-Trent 884B-17, RB211-Trent 892-17, RB211-Trent 892B-17, and RB211-Trent 895-17 turbofan engines.
We are adopting a new airworthiness directive (AD) for all Rolls-Royce plc (RR) RB211-Trent 875-17, RB211-Trent 877-17, RB211- Trent 884-17, RB211-Trent 884B-17, RB211-Trent 892-17, RB211-Trent 892B-17, and RB211-Trent 895-17 turbofan engines. This AD requires repetitive inspections of the engine upper bifurcation fairing and repairing or replacing any fairing that fails inspection. This AD was prompted by a report of cracking and material release from an engine upper bifurcation fairing. We are issuing this AD to prevent failure of the engine fire protection system, engine fire, and damage to the airplane.
(1) Within 7,500 engine flight hours (FHs) time since new, or since last inspection, or within 150 flight cycles (FCs) after the effective date of this AD, whichever occurs later, inspect the engine upper bifurcation fairing for cracks or missing material. Use paragraph (e)(3) of this AD to perform the inspections.
(2) Repeat the inspection required by this AD within every 7,500 engine FHs time since last inspection.
(3) Inspect the engine upper bifurcation fairing as follows. Refer to Figure 1 of RR Alert Non-Modification Service Bulletin (NMSB) RB.211-72-AJ165, dated March 31, 2016, for guidance on upper bifurcation fairing inspection locations.
(i) Visually inspect upper bifurcation fairing seal face 22, seal support 23, and zone A for any cracks or material loss on the right side.
(A) If fairing seal face 22 is found to have released material, repair or replace the fairing before further flight.
(B) If there is a single crack found on fairing seal face 22, shorter than 6 mm, repair or replace the fairing within 100 engine flight cycles, or at the next shop visit, whichever occurs sooner.
(C) If there is a single crack, longer than 6 mm, found on fairing seal face 22, repair or replace the fairing within 15 engine FCs or at the next shop visit, whichever occurs sooner.
(D) If there are two or more cracks found on fairing seal face 22, replace the fairing within 15 engine FCs or at next shop visit, whichever occurs sooner.
(E) If there is any cracking or material loss found on seal support 23, replace the fairing within 15 engine FCs or at next shop visit, whichever occurs sooner.
(ii) If the visual inspection required by paragraph (e)(3)(i) of this AD does not detect any crack, fluorescent penetrant inspect zone A. Refer to AMM TASK 70-20-02, Water Washable Fluorescent Penetrant Inspection (Maintenance Process 213), or OMat 632, high sensitivity fluorescent penetrant inspection, for guidance on fluorescent penetrant inspection.
(A) If a crack shorter than 6 mm is detected, repair or replace the fairing within 100 engine FCs, or at the next shop visit, whichever occurs sooner.
(B) If a crack longer than 6 mm is detected, repair or replace the fairing within 15 engine FCs or at the next shop visit, whichever occurs sooner.
For the purpose of this AD, a “shop visit” is defined as induction of an engine into the shop for maintenance involving the separation of pairs of major mating engine flanges, except that the separation of engine flanges solely for the purposes of transportation without subsequent engine maintenance does not constitute an engine shop visit.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Engines