Airworthiness Directive · Amendment 39-18629 · Doors
Bombardier, Inc. Airplanes
This AD applies to Bombardier, Inc. Model BD-700-1A10 and BD-700-1A11 airplanes, certificated in any category, serial numbers 9002 and subsequent.
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc. Model BD-700-1A10 and BD-700-1A11 airplanes. This AD was prompted by in-service reports of passenger door tensator spring failures, and qualification testing indicating that non-conforming tensator springs could be susceptible to failure prior to reaching their safe-life limit. This AD requires revising the maintenance or inspection program to incorporate certain temporary revisions, and replacing the passenger door tensator springs with new springs. We are issuing this AD to prevent tensator spring failure, resulting in the inability to open the main passenger door, which could impede evacuation in the event of an emergency.
Within 30 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate task number 52-11-41-101 as specified in the Temporary Revisions (TRs) identified in paragraphs (g)(1) through (g)(5) of this AD. The compliance time for doing the initial replacement of the passenger door tensator springs with new springs is at the times specified in the applicable TR specified in paragraphs (g)(1) through (g)(5) of this AD, or within 30 days after the effective date of this AD, whichever occurs later. The revision required by this paragraph may be done by inserting copies of the TRs identified in paragraphs (g)(1) through (g)(5) of this AD into the applicable Time Limits/Maintenance Checks manual. When the information in a TR has been included in general revisions of the applicable Time Limits/Maintenance Checks manual, the general revisions may be inserted in the Time Limits/Maintenance Checks manual, and the TR may be removed.
(1) TR 5-2-7, dated June 4, 2014, to Part 2, Section 5-10-11, of Bombardier Global Express XRS BD-700 Time Limits/Maintenance Checks (for Model BD-700-1A10 airplanes).
(2) TR 5-2-10, dated September 9, 2014, to Part 2, Section 5-10-11, of Bombardier Global 5000 GL 5000 Featuring Global Vision Flight Deck—Time Limits/Maintenance Checks (for Model BD-700-1A11 airplanes).
(3) TR 5-2-10, dated September 9, 2014, to Part 2, Section 5-10-11, of Bombardier Global 6000 GL 6000 Time Limits/Maintenance Checks (for Model BD-700-1A10 airplanes).
(4) TR 5-2-13, dated June 4, 2014, to Part 2, Section 5-10-11, of Bombardier Global 5000 BD-700 Time Limits/Maintenance Checks (for Model BD-700-1A11 airplanes).
(5) TR 5-2-44, dated June 4, 2014, to Part 2, Section 5-10-11, of Bombardier Global Express BD-700 Time Limits/Maintenance Checks (for Model BD-700-1A10 airplanes).
After accomplishing the revision required by paragraph (g) of this AD, no alternative actions (e.g., inspections) and intervals may be used unless the actions and intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD.
For airplanes identified in section 1.A., “Effectivity,” of Bombardier Global 5000 Service Bulletin 700-1A11-52-023, dated October 4, 2013; or Bombardier Global Express/Global Express XRS Service Bulletin 700-52-046, dated October 4, 2013; except as provided by paragraph (j)(1) or (j)(2) of this AD: Within 15 months after the effective date of this AD, but not exceeding the applicable life limit of the passenger tensator spring identified in the applicable TR specified in paragraphs (g)(1) through (g)(5) of this AD, replace the passenger door tensator springs having part number (P/N) GS321-0580-1, with new springs, in accordance with the Accomplishment Instructions of Bombardier Global 5000 Service Bulletin 700-1A11-52-023, dated October 4, 2013; or Bombardier Global Express/Global Express XRS Service Bulletin 700-52-046, dated October 4, 2013; as applicable.
(1) For airplanes having serial numbers (S/N) 9278 through 9360 inclusive: Replacement of the passenger door tensator springs having P/N GS321-0580-1 with new springs before the effective date of this AD is acceptable for compliance with the requirements of paragraph (i) of this AD. Refer to the task specified in the applicable TRs identified in paragraphs (g)(1) through (g)(5) of this AD for subsequent spring replacements.
(2) For airplanes with serial numbers other than those identified in paragraph (j)(1) of this AD: Accomplishment after the effective date of this AD of the “Time Limits/Maintenance Checks” discard task identified in the applicable service information specified in paragraphs (g)(1) through (g)(5) of this AD is acceptable for compliance with the requirements of paragraph (i) of this AD.