Airworthiness Directive · Amendment 39-18608 · Fuselage
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes, certificated in any category, as identified in Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes. This AD was prompted by reports of fatigue cracks in the station 320 crown frame and in window post number 3. This AD requires repetitive inspections for cracks and missing fasteners of the station 320 crown frame, cracks in the web and flange surfaces of the forward segment of window post number 3, and missing fasteners and cracks of the window upper sill; post-modification inspections for cracks of the window upper sill; a one-time fastener rework; and related investigative and corrective actions if necessary. We are issuing this AD to detect and correct fatigue cracking and missing fasteners of the station 320 crown frame, cracking of the window post number 3, and cracking of the window upper sill, which could result in an in-flight decompression and a loss of structural integrity of the fuselage.
At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, except as provided by paragraphs (j)(1) and (j)(2) of this AD: Do the actions specified in paragraphs (g)(1) through (g)(5) of this AD; and do all applicable related investigative and corrective actions; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, except as required by paragraph (j)(3) of this AD. Do all applicable related investigative and corrective actions before further flight.
(1) Do a detailed inspection for cracks and missing fasteners of the station 320 crown frame.
(2) Do a surface high frequency eddy current (HFEC) inspection for cracks of the station 320 crown frame.
(3) Do a surface HFEC inspection for cracks in the web and flange surfaces of the forward segment of window post number 3.
(4) Do a detailed inspection for missing fasteners of the window upper sill.
(5) Do a surface HFEC inspection for cracks of the window upper sill.
Do applicable repetitive post-repair inspections and repeat the inspections specified in paragraphs (g)(1) through (g)(5) of this AD thereafter at the applicable compliance time and intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015; and do all applicable related investigative and corrective actions; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, except as required by paragraph (j)(3) of this AD. Do all applicable related investigative and corrective actions before further flight.
At the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015: Do the applicable actions (including fastener rework and a detailed inspection of the condition of the fastener hole) specified in Part 11 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015; and do all applicable related investigative and corrective actions; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, except as specified in paragraph (j)(3) of this AD. Do all applicable related investigative and corrective actions before further flight.
(1) Where Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, specifies a compliance time “after the original date of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(2) Where Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, specifies a compliance time “after the Revision 1 date of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(3) Where Boeing Alert Service Bulletin 747-53A2862, Revision 1, dated July 24, 2015, specifies to contact Boeing for repairs: Before further flight, repair, using a method approved in accordance with the procedures specified in paragraph (k)(1) of this AD.