Airworthiness Directive · Amendment 39-18603 · Fuel
Fokker Services B.V. Airplanes
This AD applies to Fokker Services B.V. Model F.28 Mark 1000, 2000, 3000, and 4000 airplanes, certificated in any category, all serial numbers.
We are adopting a new airworthiness directive (AD) for all Fokker Services B.V. Model F.28 Mark 1000, 2000, 3000, and 4000 airplanes. This AD was prompted by a design review that revealed a hot spot may develop in the main fuel tank under certain failure conditions of the solenoid of the level control pilot valve, the reed switch of the main tank overflow valve, the level float switch of the collector tank, or the solenoid of the main tank fueling shut-off valve. This AD requires installing fuses in the wiring of the solenoid of the level control pilot valve, the reed switch of the main tank overflow valve, the level float switch of the collector tank, and the solenoid of the main tank fueling shut-off valve, as applicable. This AD also requires accomplishing concurrent actions and revising the airplane maintenance or inspection program, as applicable, by incorporating fuel airworthiness limitation items and critical design configuration control limitations (CDCCLs). We are issuing this AD to prevent an ignition source in the main fuel tank vapor space, which could result in a fuel tank explosion and consequent loss of the airplane.
Within 24 months after the effective date of this AD, install fuses in the wiring of the solenoid of the level control pilot valve, the reed switch of the main tank overflow valve, the level float switch of the collector tank, and the solenoid of the main tank fueling shut-off valve, as applicable, in accordance with the Accomplishment Instructions of Fokker F28 Appendix Service Bulletin SBF28-28-056/APP01, dated July 15, 2014, and Fokker Proforma Service Bulletin SBF28-28-056, dated January 9, 2014.
Prior to or concurrently with accomplishing the requirements of paragraph (g) of this AD, do the actions specified in paragraphs (h)(1) and (h)(2) of this AD. Accomplishment of the actions in this paragraph terminates the requirement of paragraph (g) of AD 2011-17-03.
(1) Install fuses packed in jiffy junctions (i.e., crimped wire in-line junction device(s)), in accordance with the Accomplishment Instructions of the service information identified in paragraph (h)(1)(i) and the instructions of the service information identified in paragraph (h)(1)(ii) of this AD.
(i) Fokker Service Bulletin SBF28-28-049, Revision 2, dated November 3, 2014.
(ii) Fokker Manual Change Notification—Maintenance Documentation MCNM-F28-035, Rev 1, dated January 9, 2014.
Note 1 to paragraph (h)(1) of this AD: Accomplishment of this action is required by AD 2011-17-03.
(2) Rework the wiring and install fuses packed in jiffy junctions in the power supply wire of the solenoid in the left and right level control pilot valves, in accordance with the Accomplishment Instructions of the service information identified in paragraph (h)(2)(i) and the instructions of the service information identified in paragraph (h)(2)(ii) of this AD. Accomplishment of the actions in this paragraph terminates the requirement of paragraph (g) of AD 2011-21-01, for the actions specified in the Accomplishment Instructions of the service information identified in paragraph (h)(2)(i) and the instructions of the service information identified in paragraph (h)(2)(ii) of this AD only.
(i) Fokker Manual Change Notification—Maintenance Documentation
MCNM-F28-034, Rev 1, dated January 9, 2014.
(ii) Fokker Service Bulletin SBF28-28-051, Revision 2, dated November 3, 2014.
Note 2 to paragraph (h)(2) of this AD: Accomplishment of this action is required by AD 2011-21-01.
Before further flight after completing the installation specified in paragraph (g) of this AD, or within 30 days after the effective date of this AD, whichever occurs later: Revise the airplane maintenance or inspection program, as applicable, by incorporating the critical design configuration control limitations (CDCCLs) specified in paragraph 1.L.(1)(c) of Fokker Proforma Service Bulletin SBF28-28-056, dated January 9, 2014.
After accomplishing the revision required by paragraph (i) of this AD, no alternative CDCCLs may be used unless the CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k)(1) of this AD.