Airworthiness Directive · Amendment 39-18543 · Engine exhaust
The Boeing Company Airplanes
This AD applies to The Boeing Company Model 777-200 and -300 series airplanes, certificated in any category, equipped with Rolls-Royce Model RB211-Trent 800 engines.
We are adopting a new airworthiness directive (AD) for certain The Boeing Company Model 777-200 and -300 series airplanes equipped with Rolls-Royce Model RB211-Trent 800 engines. This AD was prompted by reports of thrust reverser (T/R) events related to thermal damage of the T/R inner wall. Depending on the airplane configuration, this AD requires a records review and applicable repetitive inspections, replacements, and installations of the T/R inner wall; and related investigative and corrective actions if necessary. This AD also requires installation of serviceable T/R halves, which would terminate the repetitive actions. This AD also requires revising the inspection or maintenance program by incorporating new airworthiness limitations. We are issuing this AD to detect and correct a degraded T/R inner wall panel. A degraded T/R inner wall panel could lead to failure of the T/R and adjacent components and their consequent separation from the airplane, which could result in a rejected takeoff (RTO) and cause asymmetric thrust and consequent loss of control of the airplane during reverse thrust operation. If a T/R inner wall overheats, separated components could cause structural damage to the airplane, damage to other airplanes, or possible injury to people on the ground.
For airplanes with pre-TPS insulation blankets, P/Ns 315W5113-(XX) and 315W5010-(XX): Except as required by paragraphs (h)(1), (h)(2), (h)(3), and (h)(4) of this AD, at the applicable time in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, review the airplane maintenance records to determine whether sealant was added to insulation blankets around the compression pad fittings and the powered door opening system (PDOS) fitting; do the applicable actions specified in paragraphs (g)(1), (g)(2), (g)(3), (g)(4), (g)(5), and (g)(6) of this AD; and do all applicable related investigative and corrective actions; in accordance with the applicable work packages of the Accomplishment Instructions of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, except as required by paragraph (h)(5) of this AD. Do all applicable related investigative and corrective actions before further flight. Repeat the applicable inspections, replacement, and installations required by paragraphs (g)(1), (g)(2), (g)(3), (g)(4), (g)(5), and (g)(6) of this AD thereafter at the applicable intervals specified in paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010.
(1) Do a detailed inspection of all T/R inner wall insulation blanket edges, grommet holes, penetrations, and seams for sealant that is cracked, has gaps, is loose, or is missing; do a general visual inspection of click bond studs, blanket studs, and temporary fasteners; and replace sealant as applicable.
(2) Do the actions specified by either paragraph (g)(2)(i) or (g)(2)(ii) of this AD.
(i) Do a full inner wall panel nondestructive test (NDT) inspection for delamination and disbonding of each T/R half, and do a general visual inspection for areas of thermal degradation.
(ii) Do a limited area NDT inspection of the inner wall panel of each T/R half for delamination and disbonding, and do a general visual inspection for areas of thermal degradation.
(3) Do a general visual inspection of the T/R perforated wall aft of the intermediate pressure compressor 8th stage (IP8) and the high pressure compressor 3rd stage (HP3) bleed port exits for a color that is different from that of the general area.
(4) Do a detailed inspection of the PDOS lug bushings on the upper number 1 compression pad fittings to detect hole elongation, deformation, and contact with the PDOS actuator; and install a PDOS actuator rod and sealant.
(5) Do an NDT inspection for unsatisfactory number 1 upper and numbers 1 and 2 lower compression pad fittings.
(6) Install and seal insulation blankets.
(1) Where paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, specifies a compliance time “after the date on the original issue of this service bulletin,” this AD requires compliance within the specified compliance time after the effective date of this AD.
(2) Where table 2 of paragraph 1.E., “Compliance,” in Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, specifies a compliance time of “2,000 flight cycles after the date of the operator's own inspections,” for doing Work Packages 2 and 5, or Work Packages 5 and 6, this AD requires compliance within 2,000 flight cycles after the date of the operator's own inspections, or within 12 months after the effective date of this AD, whichever occurs later.
(3) Where the Condition column in table 2 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, refers to a T/R half that has or has not been inspected before “the date on this service bulletin,” this AD requires compliance for each corresponding T/R half that has or has not been inspected before the effective date of this AD.
(4) Where the Condition column in tables 2 and 3 of paragraph 1.E., “Compliance,” of Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, refers to “total flight cycles,” this AD applies to each T/R half with the specified total flight cycles as of the effective date of this AD.
(5) Where Boeing Alert Service Bulletin 777-78A0065, Revision 2, dated May 6, 2010, specifies to contact Boeing for appropriate action: Before further flight, repair using a method approved in accordance with the procedures specified in paragraph (r) of this AD.
For airplanes with TPS insulation blankets, P/N 315W5115-(XX): Within 2,000 flight cycles after doing any NDT inspection specified in Boeing Special Attention Service Bulletin 777-78-0071; or within 2,000 flight cycles after doing any NDT inspection specified in Boeing Service Bulletin 777-78-0082; or within 30 days after the effective date of this AD; whichever occurs latest; do the inspections specified in paragraphs (i)(1) and (i)(2) of this AD, and do all applicable related investigative and corrective actions, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013, or in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-78-0082, Revision 1, dated June 15, 2015, as applicable; except as required by paragraph (m) of this AD. Do all applicable related investigative and corrective actions before further flight. Repeat the inspections specified in paragraphs (i)(1) and (i)(2) of this AD thereafter at the applicable time specified in paragraph 1.E., “Compliance,” of Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013; or Boeing Service Bulletin 777-78-0082, Revision 1, dated June 15, 2015; as applicable.
(1) Do an NDT inspection of the full T/R inner wall panel for delaminations and disbonds.
(2) Do a detailed inspection of the perforated side of the T/R inner wall aft of the IP8 and the HP3 bleed port exits for color that is different from the normal T/R perforated wall color.
For airplanes with TPS insulation blankets, P/N 315W5115-(XX), on which any action specified in Boeing Special Attention Service Bulletin 777-78-0071 have been done but the actions specified in paragraphs (j)(1) and (j)(2) of this AD have not been done: Prior to or concurrently with doing the inspection required by paragraph (i) of this AD, do the actions specified in paragraphs (j)(1) and (j)(2) of this AD, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013, except as required by paragraph (m) of this AD.
(1) Install click bond covers and bracket and replace the washers.
(2) Do a detailed inspection of the compression fitting for incorrect pin orientation, and do all applicable related investigative and corrective actions. Do all applicable related investigative and corrective actions before further flight.
For airplanes with TPS insulation blankets, P/N 315W5115-(XX): Do the inspections specified in paragraphs (k)(1) or (k)(2) of this AD, as applicable.
(1) For airplanes on which any inspection specified in Boeing Special Attention Service Bulletin 777-78-0071 has been done: Within 2,000 flight hours after doing a detailed inspection of the EEC wire bundles and clips as specified in Boeing Special Attention Service Bulletin 777-78-0071, or within 500 flight hours after the effective date of this AD, whichever occurs later; do a detailed inspection of the EEC wire bundles and clips for damage, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013, except as required by paragraph (m) of this AD. Do all applicable corrective actions before further flight. Repeat the inspection thereafter at the applicable time specified in table 5 of paragraph 1.E., “Compliance,” of Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013.
(2) For airplanes on which any inspection specified in Boeing Service Bulletin 777-78-0082, has been done: Within 2,000 flight hours after doing a detailed inspection of the EEC wire bundles and clips as specified in Boeing Special Attention Service Bulletin 777-78-0082, or within 500 flight hours after the effective date of this AD, whichever occurs later; do a detailed inspection for damage of the EEC wire bundles and clips, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 777-78-0082, Revision 1, dated June 15, 2015, except as required by paragraph (m) of this AD. Do all applicable corrective actions before further flight. Repeat the inspection thereafter at the applicable time specified in table 5 of paragraph 1.E., “Compliance,” of Boeing Service Bulletin 777-78-0082, Revision 1, dated June 15, 2015.
Within 48 months after the effective date of this AD: Install serviceable T/R halves, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 777-78A0094, dated July 29, 2014, except as required by paragraph (m) of this AD. The definition of a serviceable T/R half is specified in Boeing Alert Service Bulletin 777-78A0094, dated July 29, 2014. Accomplishing the installation specified in this paragraph and the revision to the maintenance or inspection program required by paragraph (n) of this AD terminates the actions required by paragraphs (g), (i), (j), and (k) of this AD.
Where Boeing Alert Service Bulletin 777-78A0094, dated July 29, 2014; Boeing Service Bulletin 777-78-0082, Revision 1, dated June 15, 2015; and Boeing Special Attention Service Bulletin 777-78-0071, Revision 2, dated July 23, 2013; specify to contact Boeing for appropriate action: Before further flight, repair using a method approved in accordance with the procedures specified in paragraph (r) of this AD.
Within 30 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate Airworthiness Limitations 78-AWL-01, Thrust Reverser Thermal Protection System; and 78-AWL-02, Thrust Reverser Inner Wall; as specified in Boeing 777 Maintenance Planning Data (MPD) Document, Section 9, Airworthiness Limitations (AWLs) and Certification Maintenance Requirements (CMRs), D622W001-9, Revision dated November 2015. The initial compliance times for AWLs 78-AWL-01, Thrust Reverser Thermal Protection System, and 78-AWL-02, Thrust Reverser Inner Wall, as specified in Boeing 777 MPD Document, Section 9, AWLs and CMRs, D622W001-9, Revision dated November 2015, are at the applicable time specified in paragraph (n)(1) or (n)(2) of this AD.
(1) For airplanes on which any inspections required by paragraph (i) of this AD are done: Concurrent with the next inspection required by paragraph (i) of this AD, or within 30 days after the effective date of this AD, whichever occurs later.
(2) For airplanes on which the installation required by paragraph (l) of this AD is done: At the later of the times specified in paragraph (n)(2)(i) and (n)(2)(ii) of this AD.
(i) Within 1,125 days or 6,000 flight cycles, whichever occurs first after accomplishing the installation required by paragraph (l) of this AD.
(ii) Within 30 days after the effective date of this AD.
After the maintenance or inspection program, as applicable, has been revised as required by paragraph (n) of this AD, no alternative actions (e.g., inspections) or intervals may be used unless the actions or intervals are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (r) of this AD.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft