Airworthiness Directive · Amendment 39-18512 · Elevator control system
M7 Aerospace LLC Airplanes
This AD applies to M7 Aerospace LLC Models SA226-AT, SA226-T, SA226-T (B), SA226-TC, SA227-AC (C-26A), SA227-AT, SA227-BC (C-26A), SA227-CC, SA227-DC (C-26B), and SA227-TT airplanes, all serial numbers, certificated in any category.
We are adopting a new airworthiness directive (AD) for all M7 Aerospace LLC Models SA226-AT, SA226-T, SA226-T(B), SA226-TC, SA227-AC (C-26A), SA227-AT, SA227-BC (C-26A), SA227-CC, SA227-DC (C-26B), and SA227-TT airplanes. We received reports of failed elevator control rod ends due to corrosion and lack of lubrication. This AD requires initial and repetitive inspections and lubrication of the elevator control rod ends and bearings with replacement as necessary. We are issuing this AD to correct the unsafe condition on these products.
Comply with paragraphs (g)(1) through (g)(5) of this AD using the following service bulletins within the compliance times specified, unless already done:
(1) For Models SA226-AT, SA226-T, SA226-T(B), and SA226-TC: M7 Aerospace LLC Service Bulletin (SB) 226-27-080 R1, Issued: November 5, 2015, and Revised: February 23, 2016;
(2) For Models SA227-AC (C-26A), SA227-AT, SA227-BC (C-26A), and SA227-TT: M7 Aerospace LLC SB 227-27-060 R1, Issued: November 5, 2015, and Revised: February 23, 2016; or
(3) For Models SA227-CC and SA227-DC (C-26B): M7 Aerospace LLC SB CC7-27-032 R1, Issued: November 5, 2015, and Revised: February 23, 2016.
(1) If abnormally high resistance is reported when operating the elevators, before further flight after June 15, 2016 (the effective date of this AD), inspect and lubricate installed elevator control links following paragraph 2.A. of the Accomplishment Instructions of the service bulletins identified in paragraphs (f)(1), (f)(2), or (f)(3) of this AD, as applicable.
(2) Remove the elevator control links and inspect following paragraph 2.B. (and 2.C. when applicable) and lubricate the bearings following paragraph 2.E. of the Accomplishment Instructions of the service bulletins identified in paragraphs (f)(1), (f)(2), or (f)(3) of this AD, as applicable, at whichever of the following occurs first:
(i) At the next Zone related Phase or Letter Check inspection after June 15, 2016 (the effective date of this AD) or within the next 600 hours time-in-service after June 15, 2016 (the effective date of this AD), whichever occurs later; or
(ii) Within the next 6 months after June 15, 2016 (the effective date of this AD).
(3) Repetitively remove and inspect the elevator control links not to exceed every 12 months following any inspection required in paragraph (g)(1) or (g)(2) of this AD following paragraph 2.B. (and 2.C. when applicable) and lubricate the bearings following paragraph 2.E. of the Accomplishment Instructions of the service bulletins identified in paragraphs (f)(1), (f)(2), or (f)(3) of this AD, as applicable.
(4) If during any inspection required in paragraphs (g)(1), (g)(2) or (g)(3) of this AD, any link assemblies between the elevator torque tubes and the elevator quadrant are found to have frozen (stiff, hard to move) bearings or broken/cracked links (rod ends), before further flight, replace the rod ends following paragraph 2.D. and lubricate the bearings following with paragraph 2.E. of the Accomplishment Instructions of the service bulletins identified in paragraphs (f)(1), (f)(2), or (f)(3) of this AD, as applicable.
(5) Repetitively lubricate the rod end bearings (male and female) on both elevator control link assemblies following the time limits in paragraph 1.D.4) of the applicable SB, but not to exceed every 6 months, and following the procedures in paragraph 2.E. of the Accomplishment Instructions of the service bulletins identified in paragraphs (f)(1), (f)(2), or (f)(3) of this AD, as applicable.