Airworthiness Directive · Amendment 39-18497 · Rotorcraft tailboom
Airbus Helicopters (Previously Eurocopter France)
Superseded. A later AD replaced this one: AD 2021-09-05. Comply with the one in force.
This AD applies to Airbus Helicopters Model EC130B4 and EC130T2 helicopters with a tailboom to fenestron junction frame (junction frame) that has 690 or more hours time-in-service (TIS), certificated in any category.
We are superseding airworthiness directive (AD) 2014-12-51 for Airbus Helicopters (previously Eurocopter France) Model EC130B4 and EC130T2 helicopters. AD 2014-12-51 required repetitively inspecting the tailboom to Fenestron junction frame (junction frame) for a crack. This new AD retains the requirements of AD 2014-12-51, changes the applicability from helicopters with certain hours time-in-service (TIS) to junction frames with certain hours TIS, and adds a compliance time for sling cycles to the junction frame inspection interval. The actions of this AD are intended to detect a crack and to prevent failure of the junction frame, which could result in loss of the Fenestron and subsequent loss of control of the helicopter.
You are responsible for performing each action required by this AD within the specified compliance time unless it has already been accomplished prior to that time.
(1) Before the junction frame reaches 700 hours TIS or within 10 hours TIS, whichever occurs later, remove the horizontal stabilizer, clean the junction frame, and dye-penetrant inspect around the circumference of the junction frame for a crack in the areas shown in Figure 1 of Airbus Helicopters EC130 Emergency Alert Service Bulletin No. 05A017, Revision 2, dated February 20, 2015 (EASB 05A017). Pay particular attention to the area around the 4 spars (item b) of Figure 1 of EASB 05A017. An example of a crack is shown in Figure 3 of EASB 05A017.
(2) Within 25 hours TIS or 390 sling cycles, whichever occurs first after the inspection required by paragraph (f)(1) of this AD, and thereafter at intervals not exceeding 25 hours TIS or 390 sling cycles, whichever occurs first, either perform the actions of paragraph (f)(1) of this AD or, if the area is clean, using a borescope, inspect around the circumference of the junction frame for a crack in the areas shown in Figure 2 of EASB 05A017. Pay particular attention to the area around the 4 spars (item b) of Figure 2 of EASB 05A017. An example of a crack is shown in Figure 3 of EASB 05A017. For purposes of this AD, a sling cycle is defined as one landing with or without stopping the rotor or one external load-carrying operation; an external load-carrying operation occurs each time a helicopter picks up an external load and drops it off.
(3) If there is a crack, before further flight, replace the junction frame.