Airworthiness Directive · Amendment 39-18490 · Fire protection
Airbus Airplanes
This AD applies to the Airbus airplanes, certificated in any category, specified in paragraphs (c)(1) and (c)(2) of this AD, all manufacturer serial numbers.
(1) Airbus Model A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, and -343 airplanes.
(2) Airbus Model A340-211, -212, -213, -311, -312, -313, -541, and -642 airplanes.
We are superseding Airworthiness Directive (AD) 2014-03-14 for all Airbus Model A330-200 and -300 series airplanes, and Model A340- 200, -300, -500, and -600 series airplanes. AD 2014-03-14 required removing bulb-type maintenance lights; installing a drain mast on certain airplanes; and installing muffs on connecting bleed elements on certain airplanes. For certain Model A340-200 and -300 series airplanes, this new AD also requires replacing certain insulation sleeves with new insulation sleeves. This AD results from fuel system reviews conducted by the airplane manufacturer. We are issuing this AD to prevent ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
This paragraph restates the requirements of paragraph (g) of AD 2014-03-14, with new service information. Except for airplanes on which Airbus Modification 56739 has been incorporated in production: Within 26 months after March 26, 2014 (the effective date of AD 2014-03-14), remove the maintenance lights, in accordance with the Accomplishment Instructions of the applicable Airbus service information specified in paragraphs (g)(1), (g)(2), and (g)(3) of this AD.
(1) Airbus Mandatory Service Bulletin A330-33-3041, Revision 01, dated July 10, 2012; or Airbus Service Bulletin A330-33-3041, Revision 02, dated November 7, 2013 (for Model A330 series airplanes). As of the effective date of this AD, use only Airbus Service Bulletin A330-33-3041, Revision 02, dated November 7, 2013, for the actions required by paragraph (g) of this AD.
(2) Airbus Mandatory Service Bulletin A340-33-4026, Revision 01, dated July 10, 2012; or Airbus Service Bulletin A340-33-4026, Revision 02, dated November 7, 2013 (for Model A340-200 and -300 series airplanes). As of the effective date of this AD, use only Airbus Service Bulletin A340-33-4026, Revision 02, dated November 7, 2013, for the actions required by paragraph (g) of this AD.
(3) Airbus Mandatory Service Bulletin A340-33-5006, dated January 3, 2012 (for Model A340-500 and -600 series airplanes).
Note 1 to paragraph (g) of this AD: For Model A340-500 and -600 series airplanes, Airbus has issued Airbus Service Bulletin A340-33-5007 to introduce halogen-type lights, which are qualified as explosion-proof, and that can be installed (at operators' discretion) after removal of the non-explosion-proof lights required by paragraph (g) of this AD. For Model A330 series airplanes and Model A340-200 and -300 series airplanes, Airbus has issued Airbus Service Bulletins A330-33-3042 and A340-33-4027 for the installation of similar lights.
This paragraph restates the requirements of paragraph (h) of AD 2014-03-14, with new service information. For Model A330-200 and -300 series airplanes, and Model A340-200 and -300 series airplanes, except those airplanes on which Airbus Modification 52260 has been incorporated in production: Within 26 months after March 26, 2014 (the effective date of AD 2014-03-14), install insulation muffs on the connecting auxiliary power unit (APU) bleed air duct, in accordance with the Accomplishment Instructions of the applicable Airbus service information specified in paragraphs (h)(1), (h)(2), and (h)(3) of this AD.
(1) Airbus Service Bulletin A330-36-3038, dated January 16, 2012; or Airbus Service Bulletin A330-36-3038, Revision 01, dated May 11, 2015; for Model A330 series airplanes on which Airbus Service Bulletin A330-36-3032 has been incorporated. As of the effective date of this AD, use only Airbus Service Bulletin A330-36-3038, Revision 01, dated May 11, 2015.
(2) Airbus Mandatory Service Bulletin A330-36-3040, Revision 01, dated November 26, 2012, for Model A330 series airplanes on which Airbus Service Bulletin A330-36-3032 has not been incorporated.
(3) Airbus Mandatory Service Bulletin A340-36-4035, Revision 01, dated September 24, 2013, for Model A340 series airplanes.
This paragraph restates the alternative action specified in paragraph (i) of AD 2014-03-14, with new service information. For Model A330 series airplanes on which the modification specified in Airbus Service Bulletin A330-36-3032 has not been incorporated, and for Model A340 series airplanes: Doing the bleed leak detection loop modification of the APU, in accordance with the Accomplishment Instructions of the applicable Airbus service information specified in paragraphs (i)(1) and (i)(2) of this AD, is an acceptable alternative to the actions required by paragraph (h) of this AD, provided the modification is accomplished within 26 months after March 26, 2014 (the effective date of AD 2014-03-14).
(1) Airbus Service Bulletin A330-36-3037, Revision 02, including Appendix 01, dated April 7, 2014.
(2) Airbus Service Bulletin A340-36-4033, Revision 02, including Appendix 01, dated May 19, 2014.
This paragraph restates the requirements of paragraph (j) of AD 2014-03-14, with no changes. For Model A340-500 and -600 series airplanes, except those on which Airbus Modification 54636 or 54637 has been incorporated in production: Within 26 months after March 26, 2014 (the effective date of AD 2014-03-14), install a drain mast between frame (FR) 80 and FR83, in accordance with the Accomplishment Instructions of Airbus Mandatory Service Bulletin A340-53-5031, Revision 02, dated August 3, 2011.
For Model A340 series airplanes in configurations 002, 003, and 005, as described in Airbus Service Bulletin A340-36-4035, including Appendix 01, dated September 18, 2012, that have been modified before the effective date of this AD as specified in Airbus Service Bulletin A340-36-4035, including Appendix 01, dated September 18, 2012: Within 14 months after the effective date of this AD, replace the insulation sleeves between FR83 and FR84 with new insulation sleeves, in accordance with the Accomplishment Instructions of Airbus Service Bulletin A340-36-4035, Revision 01, dated September 24, 2013.