Airworthiness Directive · Amendment 39-18410 · Fuel
The Boeing Company Airplanes
Superseded. A later AD replaced this one: AD 2018-22-10. Comply with the one in force.
This AD applies to all The Boeing Company airplanes identified in paragraphs (c)(1) and (c)(2) of this AD, certificated in any category.
(1) Model DC-10-10, DC-10-10F, DC-10-15, DC-10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, DC-10-40F airplanes.
(2) Model MD-10-10F, MD-10-30F, MD-11, and MD-11F airplanes.
We are superseding Airworthiness Directive (AD) 2013-08-23 for all The Boeing Company Model DC-10-10, DC-10-10F, DC-10-15, DC-10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, DC-10-40F, MD-10-10F, MD-10- 30F, MD-11, and MD-11F airplanes. AD 2013-08-23 required adding design features to detect electrical faults and to detect a pump running in an empty fuel tank. This new AD would clarify certain requirements and remove a terminating action. This new AD would also provide an optional method of compliance for the proposed actions. This AD was prompted by a determination that it is necessary to clarify the requirements for the design features and to remove a terminating action for certain inspections. We are issuing this AD to reduce the potential of ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.
This paragraph restates the actions required by paragraph (g) of AD 2013-08-23, Amendment 39-17441 (78 FR 24037, April 24, 2013), with clarification of actions for airplanes with auxiliary fuel tanks removed, clarification of the pumps that must have a protective device installed, and a new compliance time. Except as provided by paragraph (h) of this AD: As of 48 months after the effective date of this AD, no person may operate any airplane affected by this AD unless an amended type certificate or supplemental type certificate that incorporates the design features and requirements described in paragraphs (g)(1) through (g)(4) of this AD has been approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA, and those design features are installed on the airplane to meet the criteria specified in section 25.981(a) and (d) of the Federal Aviation Regulations (14 CFR 25.981(a) and (d), at Amendment 25-125 (http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgFAR.nsf/0/339DAEE3E0A6379D862574CF00641951?OpenDocument)). For airplanes on which Boeing-installed auxiliary fuel tanks are removed, the actions specified in this AD for the auxiliary fuel tanks are not required.
(1) For all airplanes: Each electrically powered alternating current (AC) fuel pump installed in any fuel tank that normally empties during flight and each pump that is partially covered by a lowering fuel level—such as main tanks, center wing tanks, auxiliary fuel tanks installed by the airplane manufacturer, and tail tanks—must have a protective device installed to detect electrical faults that can cause arcing and burn through of the fuel pump housing and pump electrical connector. The same device must shut off the pump by automatically removing electrical power from the pump when such faults are detected. When a fuel pump is shut off resulting from detection of an electrical fault, the device must stay latched off, until the fault is cleared through maintenance action and the pump is verified safe for operation.
(2) For airplanes with a 2-person flightcrew: Additional design features, if not originally installed by the airplane manufacturer, must be installed to meet 3 criteria: To detect a running fuel pump in a tank that is normally emptied during flight, to provide an indication to the flightcrew that the tank is empty, and to automatically shut off that fuel pump. The prospective pump indication and shutoff system must automatically shut off each pump in case the flightcrew does not shut off a pump running dry in an empty tank within 60 seconds after each fuel tank is emptied. An airplane flight manual supplement (AFMS) that includes flightcrew manual pump shutoff procedures in the Limitations section of the AFMS must be submitted to the Los Angeles ACO, FAA, for approval.
(3) For airplanes with a 3-person flightcrew: Additional design features, if not originally installed by the airplane manufacturer, must be installed to detect when a fuel pump in a tank that is normally emptied during flight is running in an empty fuel tank, and to provide an indication to the flightcrew that the tank is empty. The flight engineer must manually shut off each pump running dry in an empty tank within 60 seconds after the tank is emptied. The AFMS Limitations section must be revised to specify that this pump shutoff must be done by the flight engineer.
(4) For all airplanes with tanks that normally empty during flight: Separate means must be provided to detect and shut off a pump that was previously commanded to be shut off automatically or manually but remained running in an empty tank during flight.
In lieu of doing the requirements of paragraph (g) of this AD, do the applicable actions specified in paragraphs (h)(1), (h)(2), and (h)(3) of this AD.
(1) For MD-11 and MD-11F airplanes: Do the actions specified in paragraphs (h)(1)(i) and (h)(1)(ii) of this AD.
(i) As of 48 months after the effective date of this AD, change the fuel pump control and indication system wiring, in accordance with the Accomplishment Instructions of Boeing Service Bulletin MD11-28-137, dated June 24, 2014.
(ii) Prior to or concurrently with accomplishing the actions specified in paragraph (h)(1)(i) of this AD: Replace the fuel pump control relays with fault current detectors, and change the fuel tank boost/transfer pump wire termination, in accordance with Accomplishment Instructions of Boeing Alert Service Bulletin MD11-28A133, dated June 5, 2014.
(2) For Model DC-10-10, DC-10-10F, DC-10-15, DC-10-30, DC-10-30F (KC-10A and KDC-10), DC-10-40, DC-10-40F, MD-10-10F, and MD-10-30F airplanes: Do the actions specified in paragraphs (h)(2)(i) and (h)(2)(ii) of this AD.
(i) As of 48 months after the effective date of this AD, change the fuel pump control and indication system wiring, in accordance with the Accomplishment Instructions of Boeing Service Bulletin DC10-28-256, dated June 24, 2014.
(ii) Prior to or concurrently with accomplishing the actions specified in paragraph (h)(2)(i) of this AD: Replace the fuel pump control relays with fault current detectors, and change the fuel tank boost/transfer pump wire termination, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC10-28A253, dated June 5, 2014.
(3) For all airplanes: Within 30 days after accomplishing the actions required by paragraph (h)(1) or (h)(2) of this AD, or within 30 days after the effective date of this AD, whichever occurs later, revise the maintenance or inspection program, as applicable, to incorporate the Critical Design Configuration Control Limitations (CDCCLs), Airworthiness Limitation Instructions (ALIs), and short-term extensions specified in Appendices B, C, and D of Boeing Trijet Special Compliance Item (SCI) Report MDC-02K1003, Revision M, dated July 25, 2014. The initial compliance time for accomplishing the actions specified in the ALIs is at the later of the times specified in paragraphs (h)(3)(i) and (h)(3)(ii) of this AD. Revising the maintenance or inspection program required by this paragraph terminates the requirements in paragraphs (g) and (h) of AD 2008-06-21 R1, Amendment 39-16100 (74 FR 61504, November 25, 2009).
(i) At the applicable time specified in Appendix C of Boeing Trijet SCI Report MDC-02K1003, Revision M, dated July 25, 2014, except as provided by Appendix D of Boeing Trijet SCI Report MDC-02K1003, Revision M, dated July 25, 2014.
(ii) Within 30 days after accomplishing the actions required by paragraph (h)(1) or (h)(2) of this AD, as applicable; or within 30 days after the effective date of this AD; whichever occurs later.
If the option in paragraph (h)(3) of this AD is accomplished: After the maintenance or inspection program has been revised as provided by paragraph (h)(3) of this AD, no alternative actions (e.g., inspections), intervals, or CDCCLs may be used unless the actions, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (k) of this AD.
Accomplishment of the actions specified in paragraphs (h)(1), (h)(2), and (h)(3) of this AD, as applicable, extends the 18-month repetitive inspections and tests required by paragraph (a) of AD 2002-13-10, Amendment 39-12798 (67 FR 45053, July 8, 2002); and the 18-month repetitive inspections required by paragraph (j) of AD 2011-11-05, Amendment 39-16704 (76 FR 31462, June 1, 2011); to 24-month intervals for pumps affected by those ADs, regardless if the pump is installed in a tank that normally empties, provided the remaining actions required by those two ADs have been accomplished.