Airworthiness Directive · Amendment 39-18351 · Equipment/furnishings
Bombardier, Inc. Airplanes
This AD applies to Bombardier, Inc. Model BD-100-1A10 (Challenger 300) airplanes, certificated in any category, serial numbers 20001 through 20274.
We are superseding Airworthiness Directive (AD) 2011-07-10 for certain Bombardier, Inc. Model BD-100-1A10 (Challenger 300) airplanes. AD 2011-07-10 required revising the Airworthiness Limitations section of the Instructions for Continued Airworthiness; doing detailed visual inspections; removing discrepant material; cleaning the surfaces of the valves, the plug of the sensing port, and the cabin pressure-sensing port plug; securing the insulation; installing a new safety valve, and replacing certain cabin pressure-sensing port plugs. This new AD retains all requirements of AD 2011-07-10, and requires a detailed visual inspection of both safety valves and the surrounding area for foreign material, room temperature vulcanizing (RTV) silicone, contamination, foam on the bulkhead structure, tape or insulation, and loose material; and corrective actions if necessary. This AD was prompted by reports of in-flight loss of cabin pressurization that was attributed to partial blockage of a safety valve cabin pressure-sensing port in conjunction with a failed safety valve manometric capsule. We are issuing this AD to detect and correct blockage of a safety valve cabin pressure-sensing port, which could result in loss of cabin pressure.
This paragraph restates the requirements of paragraph (g) of AD 2011-07-10, Amendment 39-16647 (76 FR 17758, March 31, 2011), with no changes. For all airplanes: Within 30 days after June 1, 2010 (the effective date of AD 2010-10-18, Amendment 39-16297 (75 FR 27406, May 17, 2010)), revise the Airworthiness Limitations section of the Instructions for Continued Airworthiness by incorporating Tasks 21-31-09-101 and 21-31-09-102 in the Bombardier Temporary Revision (TR) 5-2-53, dated October 1, 2009, to Section 5-10-40, “Certification Maintenance Requirements,” in Part 2 of Chapter 5 of Bombardier Challenger 300 BD-100 Time Limits/Maintenance Checks.
(1) For the new tasks identified in Bombardier TR 5-2-53, dated October 1, 2009: For airplanes identified in the “Phase-in” section of Bombardier TR 5-2-53, dated October 1, 2009, the initial compliance with the new tasks must be carried out in accordance with the phase-in schedule detailed in Bombardier TR 5-2-53, dated October 1, 2009, except where that TR specifies a compliance time from the date of the TR, this AD requires compliance within the specified time after June 1, 2010 (the effective date of AD 2010-10-18, Amendment 39-16297 (75 FR 27406, May 17, 2010)).
Thereafter, except as provided by paragraph (n)(1) of this AD, no alternative to the task intervals may be used.
(2) When the information in Bombardier TR 5-2-53, dated October 1, 2009, has been included in the general revisions of the applicable Airworthiness Limitations section, that TR may be removed from that Airworthiness Limitations section of the Instructions for Continued Airworthiness.
This paragraph restates the requirements of paragraph (h) of AD 2011-07-10, Amendment 39-16647 (76 FR 17758, March 31, 2011), with certain clarified compliance times. For airplanes having S/Ns 20003 through 20173 inclusive, 20176, and 20177: Within 50 flight hours after June 1, 2010 (the effective date of AD 2010-10-18, Amendment 39-16297 (75 FR 27406, May 17, 2010)), do a detailed visual inspection of the safety valves and surrounding areas for discrepant material (e.g., foreign material surrounding the safety valves, room temperature vulcanizing (RTV) sealant on safety valves, RTV excess on the bulkhead, tape near the safety valve opening, and, on certain airplanes, insulation near the safety valve opening, and foam in the area surrounding the safety valves) and a detailed visual inspection for contamination (e.g., RTV, dust, or lint) in the safety valve pressure ports, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 100-25-14, dated June 30, 2008 (for airplanes having S/Ns 20124, 20125, 20128, 20134, 20139, 20143, 20146, 20148 through 20173 inclusive, 20176, and 20177); or Bombardier Service Bulletin 100-25-21, dated June 30, 2008 (for airplanes having S/Ns 20003 through 20123 inclusive, 20126, 20127, 20129 to 20133 inclusive, 20135 to 20138 inclusive, 20140 through 20142 inclusive, 20144, 20145, and 20147).
(1) If any discrepant material is found during the detailed visual inspection, before further flight, remove the discrepant material, clean the surfaces of the valves, and secure the insulation, as applicable, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 100-25-14, dated June 30, 2008 (for airplanes having S/Ns 20124, 20125, 20128, 20134, 20139, 20143, 20146, 20148 through 20173 inclusive, 20176, and 20177); or Bombardier Service Bulletin 100-25-21, dated June 30, 2008 (for airplanes having S/Ns 20003 through 20123 inclusive, 20126, 20127, 20129 through 20133 inclusive, 20135 through 20138 inclusive, 20140 through 20142 inclusive, 20144, 20145, and 20147).
(2) If contamination (e.g., RTV, dust, or lint) is found on the safety valve pressure sensing ports, before further flight, do a detailed visual inspection of the outside and inside diameters of the pressure sensing port conduit for the presence of RTV; and before further flight do the actions specified in paragraphs (h)(2)(i) and (h)(2)(ii) of this AD, as applicable; in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 100-25-14, dated June 30, 2008 (for airplanes having S/Ns 20124, 20125, 20128, 20134, 20139, 20143, 20146, 20148 through 20173 inclusive, 20176, and 20177); or Bombardier Service Bulletin 100-25-21, dated June 30, 2008 (for airplanes having S/Ns 20003 through 20123 inclusive, 20126, 20127, 20129 through 20133 inclusive, 20135 through 20138 inclusive, 20140 through 20142 inclusive, 20144, 20145, and 20147).
(i) If no RTV is found, clean the plug of the sensing port.
(ii) If any RTV is found, install a new safety valve.
This paragraph restates the requirements of paragraph (i) of AD 2011-07-10, Amendment 39-16647 (76 FR 17758, March 31, 2011), with no changes. For airplanes having S/Ns 20174, 20175, 20178 through 20189 inclusive, 20191 through 20228 inclusive, 20230 through 20232 inclusive, 20235, 20237, 20238, 20241, 20244, 20247, 20249 through 20251 inclusive, 20254, 20256 and 20259: Within 50 flight hours after June 1, 2010 (the effective date of AD 2010-10-18, Amendment 39-16297 (75 FR 27406, May 17, 2010)), clean the cabin pressure-sensing port plug in both safety valves, in accordance with Paragraph 2.B., “Part A—Modification—Cleaning,” of the Accomplishment Instructions of Bombardier Service Bulletin A100-21-08, dated June 18, 2009.
This paragraph restates the requirements of paragraph (j) of AD 2011-07-10, Amendment 39-16647 (76 FR 17758, March 31, 2011), with no changes. For airplanes having S/Ns 20003 through 20189 inclusive, 20191 through 20228 inclusive, 20230 through 20232 inclusive, 20235, 20237, 20238, 20241, 20244, 20247, 20249 through 20251 inclusive, 20254, 20256, and 20259: Within 50 flight hours after June 1, 2010 (the effective date of AD 2010-10-18, Amendment 39-16297 (75 FR 27406, May 17, 2010)), clean the cabin pressure-sensing port plug in both safety valves, in accordance with Paragraph 2.B., “Part A—Modification—Cleaning,” of the Accomplishment Instructions of Bombardier Service Bulletin A100-21-08, dated June 18, 2009. Repeat the cleaning thereafter at intervals not to exceed 50 flight hours until the actions specified by paragraph (k) of this AD are completed.
This paragraph restates the requirements of paragraph (k) of AD 2011-07-10, Amendment 39-16647 (76 FR 17758, March 31, 2011), with no changes. For airplanes having S/Ns 20003 through 20189 inclusive, 20191 through 20228 inclusive, 20230 through 20232 inclusive, 20235, 20237, 20238, 20241, 20244, 20247, 20249 through 20251 inclusive, 20254, 20256, and 20259: Within 12 months after May 5, 2011 (the effective date of AD 2011-07-10), replace the cabin pressure-sensing port plug having part number (P/N) 2844-060 in both safety valves with a new gridless plug having P/N 2844-19 and re-identify the safety valves, in accordance with Paragraph 2.C., “Part B—Modification—Replacement,” of the Accomplishment Instructions of Bombardier Service Bulletin A100-21-08, dated June 18, 2009. Doing the actions in this paragraph terminates the repetitive cleanings required by paragraph (j) of this AD.
For airplanes having S/Ns 20003 through 20123 inclusive, 20126, 20127, 20129 through 20133 inclusive, 20135 through 20138 inclusive, 20140 through 20142 inclusive, 20144, 20145, and 20147: Within 500 flight hours or 15 months after the effective date of this AD, whichever occurs first, do a detailed visual inspection of both safety valves and the surrounding area for foreign material, RTV silicone, contamination, foam on the bulkhead structure, tape or insulation, and loose material, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 100-25-21, Revision 02, dated July 25, 2013. Do all applicable corrective actions before further flight, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 100-25-21, Revision 02, dated July 25, 2013.