Airworthiness Directive · Amendment 39-18199 · Doors
Bombardier, Inc. Airplanes
Superseded. A later AD replaced this one: AD 2020-21-03. Comply with the one in force.
This AD applies to Bombardier, Inc. Model DHC-8-400, -401, and -402 airplanes, certificated in any category, serial numbers 4001 through 4411 inclusive.
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc. Model DHC-8-400 series airplanes. This AD was prompted by a report of loose bolts that are intended to secure the translating door crank assembly to the outside handle shaft. This AD requires a detailed inspection for loose bolts on the aft translating door crank assembly, and removal and reinstallation of the bolts. We are issuing this AD to prevent loose bolts from falling out. If both bolts become loose or fall out after the door is closed and locked, the door cannot be opened from inside or outside, which could impede evacuation in the event of an emergency.
Within 600 flight hours or 100 days, whichever occurs first after the effective date of this AD: Do a detailed inspection of the aft translating door crank assembly for loose bolts, in accordance with paragraph 3.B., “Procedure,” of Part A—INSPECTION, of the Accomplishment Instructions of Bombardier Service Bulletin 84-52-75, Revision A, dated July 11, 2013. Doing the applicable actions specified in paragraph (g)(1) or (g)(2) of this AD terminates the requirements of this paragraph.
(1) If any loose bolt is found: Before further flight, remove and reinstall the translating door crank assembly bolt, in accordance with paragraph 3.B., “Procedure,” and steps 3.C.(4) and 3.C.(5) of paragraph 3.C., “Close Out,” of Part B—RECTIFICATION, of the Accomplishment Instructions of Bombardier Service Bulletin 84-52-75, Revision A, dated July 11, 2013.
(2) If no loose bolt is found: Within 6,000 flight hours or 36 months, whichever occurs first after the effective date of this AD, remove and reinstall the translating door crank assembly bolts, in accordance with paragraph 3.B., “Procedure,” and steps 3.C.(4) and 3.C.(5) of paragraph 3.C., “Close Out,” of Part B—RECTIFICATION, of the Accomplishment Instructions of Bombardier Service Bulletin 84-52-75, Revision A, dated July 11, 2013.