Airworthiness Directive · Amendment 39-18159 · International Aero Engines AG Turbofan Engines
International Aero Engines AG Turbofan Engines
This AD applies to:
(1) All International Aero Engines AG (IAE) V2500-A1 turbofan engines; and
(2) All IAE V2525-D5 and V2528-D5 turbofan engines; and
(3) IAE V2522-A5, V2524-A5, V2527-A5, V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines with serial numbers (S/Ns) V10001 through V13190, and V15001 through V16728, excluding V16707.
We are superseding Airworthiness Directive (AD) 2012-09-09 for all International Aero Engines AG (IAE) V2500-A1, V2525-D5, and V2528- D5 turbofan engines, and certain serial numbers (S/Ns) of IAE V2522-A5, V2524-A5, V2527-A5, V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines. AD 2012-09-09 required cleaning, eddy current inspection (ECI) or fluorescent penetrant inspection (FPI), and initial and repetitive ultrasonic inspections (USIs) of certain high-pressure compressor (HPC) stage 3 to 8 drums, as well as replacement of the drum attachment nuts. This new AD expands the affected population for initial and repetitive USIs of the HPC stage 3 to 8 drum, revises the inspection intervals, requires performing ECI or FPI, requires removal of the affected attachment nuts and any HPC stage 3 to 8 drum found cracked, and adds a mandatory terminating action. This AD was prompted by the discovery that additional attachment nuts for certain HPC stage 3 to 8 drums are affected. We are issuing this AD to prevent failure of the HPC stage 3 to 8 drum, which could result in uncontained drum failure, damage to the engine, and damage to the airplane.
For IAE V2500-A1 turbofan engines with S/Ns listed in “Group A” or “Group B” in paragraph 1.E. in IAE Alert Non-Mandatory Service Bulletin (NMSB) No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014, perform an initial USI of the HPC stage 3 to 8 drum within 200 cycles of the drum accumulating 8,000 cycles or within 200 cycles from the effective date of this AD, whichever occurs later.
For IAE V2500-A5 turbofan engines with S/Ns listed in “Group C” in paragraph 1.E. in IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014, perform an initial USI of the HPC stage 3 to 8 drum within 200 cycles of the drum accumulating 6,250 cycles or within 200 cycles from the effective date of this AD, whichever occurs later.
For IAE V2500-A5 turbofan engines with S/Ns listed in “Group D” in paragraph 1.E. in IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014, perform an initial USI of the HPC stage 3 to 8 drum within 200 cycles of the drum accumulating 3,750 cycles or within 200 cycles from the effective date of this AD, whichever occurs later.
For IAE V2500-A1, -A5, and -D5 turbofan engines not listed in “Group A,” “Group B,” “Group C,” or “Group D,” and with drum assembly part numbers (P/Ns) listed in “Group E” in paragraph 1.E. in IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014, perform an initial USI of the HPC stage 3 to 8 drum within 200 cycles of the drum accumulating 12,500 cycles or within 200 cycles from the effective date of this AD, whichever occurs later.
For IAE V2500-A1, -A5, and -D5 turbofan engines not listed in “Group A,” “Group B,” “Group C,” or “Group D,” and with drum assembly P/Ns listed in “Group F” in paragraph 1.E. in IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014, perform an initial USI of the HPC stage 3 to 8 drum within 200 cycles of the drum accumulating 9,000 cycles or within 200 cycles from the effective date of this AD, whichever occurs later.
(1) For engines included in “Group A,” “Group B,” “Group C,” “Group E,” or “Group F,” as defined in paragraph (e) of this AD, perform repetitive USIs of the HPC stage 3 to 8 drum within every 750 cycles of the last USI after the initial inspection required by paragraph (e) of this AD.
(2) For engines included in “Group D,” as defined in paragraph (e) of this AD, perform repetitive USIs of the HPC stage 3 to 8 drum within every 500 cycles of the last USI after the initial inspection required by paragraph (e) of this AD.
(3) If you inspect the HPC stage 3 to 8 drum at piece-part exposure, you may delay the next USI as shown in the “Grace Periods Table” for each compliance group listed in paragraph 1.E. in IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014.
For the USI inspections required by this AD, do the following. Inspect the stage 8 disk of the HPC stage 3 to 8 drum on the outer diameter adjacent to the stage 7 to 8 electron beam weld land using ultrasonic probe manipulator assembly P/N IAE2R19865 for IAE V2500-A1 engines, P/N IAE2R19852 or IAE2R19879 for IAE V2500-A5 engines, and P/N IAE2R19874 for IAE V2500-D5 engines. Inspect the stage 8 disk of the HPC stage 3 to 8 drum on the inner diameter at the inner radius position using ultrasonic probe manipulator assembly P/N IAE2R19870 for IAE V2500-A1 engines, P/N IAE2R19859 or IAE2R19880 for IAE V2500-A5 engines, and P/N IAE2R19876 for IAE V2500-D5 engines. Inspect the full circumference of both the inner and outer diameters. If the entire circumference cannot be inspected, remove the drum from the engine before further flight.
(1) Calibrate the ultrasonic equipment using the following parameters and the acceptance criteria listed in paragraph 3.A.(1)(a) of IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014. Use working standard P/N IAE2R19854 for outer diameter inspection and working standard P/N IAE2R19860 for inner diameter inspection:
(i) Set Frequency to 5 Mhz.
(ii) Set Rectify to Full Wave.
(iii) Set Pulser to Single Crystal.
(iv) Maximize the signal response to achieve 70 percent full screen height.
(v) Adjust the range control to position the target signal at 5.0 time base position based on ten division time base.
(vi) For outer diameter inspection, set Gate Position to 3.5-7.0 time base position based on ten division time base.
(vii) For inner diameter inspection, set Gate Position to 3.0-8.0 time base position based on ten division time base.
(2) Inspect the HPC stage 3 to 8 drum using the acceptance criteria listed in paragraph 3.A.(1)(a) of IAE Alert NMSB No. V2500-ENG-72-A0615, Revision 6, dated September 4, 2014.
(3) After completing the inspection of each feature, verify the calibration of the ultrasonic equipment. If the calibration is under sensitivity by more than 3db, then repeat the calibration and inspection of the feature.
At the next piece-part exposure of the HPC stage 3 to 8 drum after the effective date of this AD, do the following before returning any HPC stage 3 to 8 drum to service:
(1) Remove from service all silver-plated nuts (fully or partially-plated), P/Ns AS44862 or AS64367, that attach the HPC stage 3 to 8 drum to the HPC stage 9 to 12 drum.
(2) Clean the HPC stage 3 to 8 drum to remove the silver residue.
(3) Inspect the HPC stage 3 to 8 drum using at least one of the following methods:
(i) Fluorescent penetrant inspection (FPI) of the HPC stage 3 to 8 drum for cracks, or
(ii) Eddy current inspection (ECI) of the HPC stage 3 to 8 drum for cracks.
After the effective date of this AD, do not install any silver-plated nuts, P/N AS44862 or AS64367, into any engine.
Within 9,450 cycles after the effective date of this AD, but not later than December 31, 2025, install:
(1) An HPC stage 3 to 8 drum that has never operated with silver-plated nuts (fully or partially plated) to attach the HPC stage 3 to 8 drum to the HPC stage 9 to 12 drum, with
(2) silver-free nuts to attach the HPC stage 3 to 8 drum to the HPC stage 9 to 12 drum.
For the purpose of this AD, “piece-part exposure” is removal of the HPC stage 3 to 8 drum from the engine, removal of all blades from the drum, and separation of the HPC stage 3 to 8 drum from the stage 9 to 12 drum.