Airworthiness Directive · Amendment 39-18124 · Electrical power
BAE Systems (Operations) Limited Airplanes
This AD applies to BAE Systems (Operations) Limited Model 4101 airplanes, certificated in any category, all serial numbers.
We are adopting a new airworthiness directive (AD) for all BAE Systems (Operations) Limited Model 4101 airplanes. This AD was prompted by a report of the failure, due to overheat, of a bracket on which the earth post (EP) for the generator and propeller de-ice systems is located. This AD requires an inspection of the affected EPs and attachment structure for damage, an inspection of the earth cables of the generator and propeller de-ice system for signs of overheating and arcing damage, a torque check of the affected EP stiff nuts, an electrical high current bonding check of the bracket, and corrective actions if necessary. We are issuing this AD to detect and correct an overheat failure of the EPs for the generator and propeller de-ice system, and possible degradation of the wing front spar cap and/or web, which could affect the structural integrity of the wing.
Within 6 months after the effective date of this AD: Do a general visual inspection on both engines of the structure around EP2 and EP4; the brackets on which the EPs are mounted; the attachment of the nacelle horizontal support for damage, and lateral movement of the EPs; in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. If any lateral movement of the EP or any other damage is detected, before further flight, repair using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the European Aviation Safety Agency (EASA); or BAE Systems (Operations) Limited's EASA Design Organization Approval (DOA).
Within 6 months after the effective date of this AD: Do a general visual inspection of the earth cables of the generator and propeller de-ice system for arcing damage and signs that the cable insulation or terminal tags have been overheated, and do all applicable corrective actions; in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all applicable corrective actions before further flight.
Within 6 months after the effective date of this AD: Do a torque check of the EP2 and EP4 stiff nuts, and adjust the torque load as applicable, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014.
Within 6 months after the effective date of this AD: Measure the resistance of the EP2 and EP4 earth bolts using a high-current millivolts-drop test, and do all applicable corrective actions, in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014. Do all applicable corrective actions before further flight.
Although BAE Systems (Operations) Limited Inspection Service Bulletin J41-24-043, Revision 3, dated June 16, 2014, specifies to submit information to the manufacturer, this AD does not require that this information be submitted.