Airworthiness Directive · Amendment 39-18111 · Hydraulic power
The Boeing Company Airplanes
This AD applies to all The Boeing Company Model 757-200, -200PF, -200CB, and -300 series airplanes; and Model 767-200, -300, -300F, and -400ER series airplanes; certificated in any category.
We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 757-200, -200PF, -200CB, and -300 series airplanes; and Model 767-200, -300, -300F, and -400ER series airplanes. This AD was prompted by reports indicating that the counterweights in some hub assemblies of the ram air turbine (RAT) could be understrength and fracture when the RAT is rotating, and that some RAT hub assemblies were delivered with balance washer retention screws that were incorrectly heat-treated, and therefore, susceptible to fracture and cracking. This AD requires a part number and serial number inspection to determine if certain RAT hub assemblies are installed; and, for affected RAT hub assemblies, doing an inspection for missing and fractured balance washer screws, and replacement or rework if necessary. We are issuing this AD to prevent an inoperative RAT, which, following a dual engine shutdown in flight, will cause loss of all hydraulic power to the primary flight controls, resulting in subsequent loss of control of the airplane.
Prior to the next RAT backdrive test, or within 24 months after the effective date of this AD, whichever occurs first: Do an inspection to determine the part number and serial number of the RAT hub assembly, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 757-29A0066, Revision 1, dated March 8, 2010 (for Model 757 airplanes); or Boeing Alert Service Bulletin 767-29A0110, Revision 1, dated March 8, 2010 (for Model 767 airplanes). A review of airplane maintenance records is acceptable in lieu of this inspection if the part number and serial number of the RAT hub assembly can be conclusively determined from that review.
(1) If the part number or serial number of the RAT hub assembly is missing, or if the part number and serial number are specified in paragraphs (g)(1)(i) and (g)(1)(ii) of this AD, and the hub assembly has not been reworked and re-identified as specified in Hamilton Sundstrand Service Bulletin 730814-29-12, dated November 30, 2005 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-15, dated November 30, 2005 (for Model 767 airplanes): Prior to the next RAT backdrive test or within 24 months after the effective date of this AD, whichever occurs first, replace the RAT or RAT hub assembly with a new, serviceable, or reworked and re-identified RAT or RAT hub assembly, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 757-29A0066, Revision 1, dated March 8, 2010 (for Model 757 airplanes); or Boeing Alert Service Bulletin 767-29A0110, Revision 1, dated March 8, 2010 (for Model 767 airplanes); except as provided by paragraphs (g)(2) and (g)(3) of this AD.
(i) Model 757-200, -200PF, -200CB, and -300 series airplanes having part number (P/N) 733785A or 733785B, and serial number (S/N) 0410 through 0413 inclusive, 0415, 0417 through 0430 inclusive, 0432, or 0434.
(ii) Model 767-200, -300, -300F, and -400ER series airplanes having P/N 734350A, 734350B, 734350C, or 734350D; and S/N 0666, 0673 through 0684 inclusive, 0686, 0687, or 0689.
(2) Where Boeing Alert Service Bulletin 757-29A0066, Revision 1, dated March 8, 2010 (for Model 757 airplanes); or Boeing Alert Service Bulletin 767-29A0110, Revision 1, dated March 8, 2010 (for Model 767 airplanes); specifies to contact Hamilton Sundstrand for a replacement unit, this AD does not require that action.
(3) Where Boeing Alert Service Bulletin 757-29A0066, Revision 1, dated March 8, 2010 (for Model 757 airplanes); or Boeing Alert Service Bulletin 767-29A0110, Revision 1, dated March 8, 2010 (for Model 767 airplanes); specifies to return all RAT hub assemblies to Hamilton Sundstrand for rework and test, operators may return the RAT or RAT hub assembly to Hamilton Sundstrand or to an FAA-approved repair facility that has the capability to disassemble, repair, balance, and test the RAT or RAT hub assembly.
Prior to the next RAT backdrive test, or within 24 months after the effective date of this AD, whichever occurs first: Do an inspection to determine the part number and serial number on the RAT hub assembly, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 757-29-0069, dated June 24, 2010 (for Model 757 airplanes); or Boeing Special Attention Service Bulletin 767-29-0112, dated June 24, 2010 (for Model 767 airplanes). A review of airplane maintenance records is acceptable in lieu of this inspection if the part number and serial number of the RAT hub assembly can be conclusively determined from that review.
(1) If the part number or serial number of the RAT hub assembly is missing or if the part number and serial number is listed in paragraph 1.A., “Effectivity,” of Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes); and the RAT hub assembly has not been reworked and re-identified, as specified in Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes): Prior to the next RAT backdrive test or within 24 months after the effective date of this AD, whichever occurs first, do a general visual inspection of the 12 balance washer screws installed around the perimeter of the rotor assembly for missing washers and fractured screws, in accordance with the Accomplishment Instructions of Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes).
(2) If, during any inspection required by paragraph (h)(1) of this AD, any balance washer is missing or any fractured screw is found, prior to the next RAT backdrive test or within 24 months after the effective date of this AD, whichever occurs first: Replace the RAT or RAT hub assembly with a new, serviceable, or reworked and re-identified RAT or RAT hub assembly, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 757-29-0069, dated June 24, 2010 (for Model 757 airplanes); or Boeing Special Attention Service Bulletin 767-29-0112, dated June 24, 2010 (for Model 767 airplanes); except as provided by paragraphs (h)(2)(i), (h)(2)(ii), and (h)(2)(iii) of this AD.
(i) Where Boeing Special Attention Service Bulletin 757-29-0069, dated June 24, 2010 (for Model 757 airplanes); and Boeing Special Attention Service Bulletin 767-29-0112, dated June 24, 2010 (for Model 767 airplanes); specify to contact Hamilton Sundstrand for a replacement unit, this AD does not require that action.
(ii) Where Boeing Special Attention Service Bulletin 757-29-0069, dated June 24, 2010 (for Model 757 airplanes); and Boeing Special Attention Service Bulletin 767-29-0112, dated June 24, 2010 (for Model 767 airplanes); instruct operators to return all RAT or RAT hub assemblies to Hamilton Sundstrand for rework and test, operators may return the RAT or RAT hub assembly to Hamilton Sundstrand or an FAA-approved repair facility that has the capability to disassemble, repair, balance, and test the RAT or RAT hub assembly.
(iii) Where Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes); instructs operators to return all of the removed screws (including the remnants of the fractured screws) to Hamilton Sundstrand for further investigation, this AD does not include that requirement.
(3) If, during any inspection required by paragraph (h)(1) of this AD, there are no missing balance washers and no fractured screws: Prior to the next RAT backdrive test or within 24 months after the effective date of this AD, whichever occurs first, replace the balance washer screws, one at a time, in accordance with Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes).
(1) As of the effective date of this AD, no person may install a RAT hub assembly having any part number and serial number specified in paragraphs (i)(1)(i) and (i)(1)(ii) of this AD, on any airplane, unless it has been reworked and re-identified in accordance with Hamilton Sundstrand Service Bulletin 730814-29-12, dated November 30, 2005 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-15, dated November 30, 2005 (for Model 767 airplanes).
(i) Model 757-200, -200PF, -200CB, and -300 series airplanes having P/N 733785A or 733785B; and S/N 0410 through 0413 inclusive, 0415, 0417 through 0430 inclusive, 0432, or 0434.
(ii) Model 767-200, -300, -300F, and -400ER series airplanes having P/N 734350A, 734350B, 734350C, or 734350D, and S/N 0666, 0673 through 0684 inclusive, 0686, 0687, or 0689.
(2) As of the effective date of this AD, no person may install a RAT hub assembly having any applicable part number and serial number specified in paragraphs (i)(2)(i) and (i)(2)(ii) of this AD, on any airplane, unless it has been inspected, reworked, and re-identified in accordance with Hamilton Sundstrand Service Bulletin 730814-29-15, dated February 10, 2010 (for Model 757 airplanes); or Hamilton Sundstrand Service Bulletin 729548-29-18, dated February 10, 2010 (for Model 767 airplanes).
(i) Model 757-200, -200PF, -200CB, and -300 series airplanes having P/N 733785AB Series, and S/N 0107, 0105, 0121, 0151, 0179, 0204, 0282, 0289, 0296, 0315, 0319, 0337, 0390, 0403, 0412, 0421, 0424, 0426, 0429, 0430, 0439, 0445, 0450, 0477, 0503, 0510, 0512, 0584, 0585, 0591, 0599, 0609, 0617, 0624, 0656, 0673, 0685, 0789, 0822, 0841, 0854, 0911, 0912, 0936, 0957, 0961, 0971, 1061, 1064, 1096, 1101, 1102, 1105, 1113, 1117, 1170, 1172, 1173, or X2069.
(ii) Model 767-200, -300, -300F, and -400ER series airplanes having P/N 734350 Series, and S/N 0042, 0074, 0170, 0183, 0207, 0311, 0312, 0324, 0336, 0337, 0347, 0367, 0372, 0379, 0381, 0391, 0427, 0431, 0469, 0495, 0500, 0530, 0531, 0533, 0538, 0539, 0550, 0551, 0575, 0584, 0619, 0626, 0666, 0670, 0676, 0690, 0700, 0701, 0734, 0750, 0800, 0801, 0813, 0835, 0836, 0908, 0923, 0958, 0968, 0980, 1009, 1012, 1019, 1046, 1052, 1054, 1102, 1127, 1167, 1264, 1285, 1300, 1317, 1322, 1362, 1372, 1394, 1398, 1436, 1594, 1633, 1634, 1635, 1636, 1637, 1638, 1639, 1640, 1641, 1642, 1643, 1644, 1645, 1646, 1647, 1648, 1649, 1650, 1651, 1652, or X2063.
(3) As of the effective date of this AD, no person may install a balance washer screw having P/N MS24667-14, on the RAT hub assembly of any airplane unless it can be positively determined from a records review that the screws did not come from Northeast Fasteners, lots 24057 and 30533.
Although Boeing Alert Service Bulletin 757-29A0066, Revision 1, dated March 8, 2010 (for Model 757 airplanes); and Boeing Alert Service Bulletin 767-29A0110, Revision 1, dated March 8, 2010 (for Model 767 airplanes); specify to submit information to the manufacturer, this AD does not include that requirement.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft