Airworthiness Directive · Amendment 39-18103 · Landing gear
Short Brothers & Harland Ltd. Airplanes
This AD applies to Short Brothers & Harland Ltd. Model SC-7 Series 3 airplanes, all serial numbers, certificated in any category.
The FAA is correcting an airworthiness directive (AD) that published in the Federal Register. That AD applies to all Short Brothers & Harland Ltd. Model SC-7 Series 3 airplanes. The amendment number in the Agency Identification Numbers in the preamble section of the AD is incorrect. Although no other part of the preamble or regulatory information has been corrected, we are publishing the entire rule in the Federal Register.
Unless already done, comply with this AD within the compliance times specified in paragraphs (f)(1) through (f)(5) of this AD.
(1) Within 30 days after March 30, 2015 (the effective date of this AD), accomplish a visual inspection of the NLG sliding tube following the instructions of paragraph 3.A of SAFRAN Messier-Buggatti-Dowty Service Bulletin No. 32-17M, dated November 1, 2014.
Note 1 to paragraphs (f)(1), (f)(2), (f)(4), and (f)(5) of this AD: Instructions provided by SAFRAN Messier-Buggatti-Dowty Service Bulletin No. 32-17M, dated November 1, 2014, are referenced in Shorts Service Bulletin Number 32-74, dated November 1, 2014.
(2) Within 90 days after March 30, 2015 (the effective date of this AD), do a fluorescent penetrant inspection of the sliding tube following the instructions of paragraph 3.B of SAFRAN Messier-Buggatti-Dowty Service Bulletin No. 32-17M, dated November 1, 2014.
(3) If any crack is detected during the inspection required by paragraph (f)(1) or (f)(2) of this AD, before further flight, obtain FAA-approved repair instructions approved specifically for compliance with this AD by reporting the findings to Short Brothers & Harland Ltd. and incorporating those instructions. You can find contact information for Short Brothers & Harland Ltd. in paragraph (h) of this AD.
(4) Within 30 days after any inspection required by paragraphs (f)(1) and (f)(2) of this AD or within 30 days after March 30, 2015 (the effective date of this AD), whichever occurs later, report the inspection results to Short Brothers & Harland Ltd. by completing the Inspection Results Proforma following the instructions of paragraph 3.C.(2) of SAFRAN Messier-Buggatti-Dowty Service Bulletin No. 32-17M, dated November 1, 2014. You can find contact information for Short Brothers & Harland Ltd. in paragraph (h) of this AD.
(5) From March 30, 2015 (the effective date of this AD), you may install a sliding tube on an NLG provided that, before next flight after installation, the NLG sliding tube passes the inspections in paragraphs (f)(1) and (f)(2) of this AD following the instructions of paragraph 3 of SAFRAN Messier-Buggatti-Dowty Service Bulletin No. 32-17M, dated November 1, 2014.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Aircraft