Airworthiness Directive · Amendment 39-18087 · Rolls-Royce plc Turbofan Engines
Rolls-Royce plc Turbofan Engines
This AD applies to all Rolls-Royce plc (RR) RB211-Trent 553-61, 553A2-61, 556-61, 556A2-61, 556B-61, 556B2-61, 560-61, 560A2-61, 768-60, 772-60, 772B-60, 875-17, 877-17, 884-17, 884B-17, 892-17, 892B-17, 895-17, 970-84, 970B-84, 972-84, 972B- 84, 977-84, 977B-84, and 980-84 turbofan engines.
We are superseding airworthiness directive (AD) 2013-15-10 that applies to certain Rolls-Royce plc (RR) RB211 turbofan engines. AD 2013-15-10 required inspecting the intermediate-pressure compressor (IPC) rotor shaft rear balance land for cracks. This AD requires inspecting the IPC rotor shaft rear balance land for cracks, eliminates a terminating action, expands one inspection, and eliminates certain other inspections. We are issuing this AD to detect cracking on the IPC rotor shaft rear balance land, which could lead to uncontained engine failure and damage to the airplane.
(i) Within 625 cycles-in-service (CIS) after June 29, 2012, or before the next flight after the effective date of this AD, whichever occurs later, borescope inspect the IPC rotor shaft rear balance land. Use RR Alert Non-Modification Service Bulletin (NMSB) No. RB.211-72-AG270, Revision 4, dated March 21, 2011, paragraphs 3.A.(2)(a) through 3.A.(2)(c) and 3.A.(3)(a) through 3.A.(3)(c) for in-shop procedures, or paragraphs 3.B.(2)(a) through 3.B.(2)(c) and 3.B.(4)(a) through 3.B.(4)(c), for on-wing procedures, to do the inspection.
(ii) Thereafter, repeat the inspection within every 625 cycles-since-last inspection (CSLI). You may count CSLI from the last borescope inspection or the last eddy current inspection (ECI), whichever occurred later.
(iii) At each shop visit after the effective date of this AD, perform an ECI of the IPC rotor shaft rear balance land. Use RR Alert NMSB No. RB.211-72-AG085, Revision 2, dated July 7, 2011, paragraphs 3.A. through 3.B., to do the inspection.
(iv) To meet the requirement of paragraph (e)(1)(i) of this AD, instead of a borescope inspection, you may perform an ECI using paragraph (e)(1)(iii) of this AD.
(i) Within 475 CIS after June 29, 2012, or before the next flight after the effective date of this AD, whichever occurs later, borescope inspect the IPC rotor shaft rear balance land. Use RR Alert NMSB No. RB.211-72-AG264, Revision 5, dated March 21, 2011, paragraphs 3.A.(2)(a) through 3.A.(2)(c) and 3.A.(3)(a) through 3.A.(3)(c), for in-shop procedures, or paragraphs 3.B.(2)(a) through 3.B.(2)(c) and 3.B.(4)(a) through 3.B.(4)(c), for on-wing procedures, to do the inspection.
(ii) Thereafter, repeat the inspection within every 475 CSLI. You may count CSLI from the last borescope inspection or the last ECI, whichever occurred later.
(iii) At each shop visit after the effective date of this AD, perform an ECI of the IPC rotor shaft rear balance land. Use RR Alert NMSB No. RB.211-72-AG085, Revision 2, dated July 7, 2011, paragraphs 3.A. through 3.B., to do the inspection.
(iv) To meet the requirement of paragraph (e)(2)(i) of this AD, instead of a borescope inspection, you may perform an ECI using paragraph (e)(2)(iii) of this AD.
(i) Within 340 CIS after October 8, 2013, or before the next flight after the effective date of this AD, whichever occurs later, borescope inspect the IPC rotor shaft rear balance land. Use RR Alert NMSB No. RB.211-72-AH058, Revision 1, dated July 7, 2014, paragraphs 3.A.(2)(a) through 3.A.(2)(c), 3.A.(3)(a) through 3.A.(3)(d), and 3.A.(5)(a) through 3.A.(5)(c), for on-wing procedures, to do the inspection.
(ii) Thereafter, repeat the inspection within every 340 CSLI. You may count CSLI from the last borescope inspection or the last ECI, whichever occurred later.
(iii) At each shop visit after the effective date of this AD, perform an ECI of the IPC rotor shaft rear balance land. Use RR NMSB No. RB.211-72-G448, Revision 4, dated August 21, 2014, paragraphs 3.D.(4) through 3.D.(5), 3.D.(6)(f) through 3.D.(7)(w), 3.D.(8)(f) through 3.D.(8)(w), and 3.D.(11) to do the inspection.
(iv) To meet the requirement of paragraph (e)(3)(i) of this AD, instead of a borescope inspection, you may perform an ECI using paragraph (e)(3)(iii) of this AD.
(i) Within 280 flight cycles after October 8, 2013, or before the next flight after the effective date of this AD, whichever occurs later, borescope inspect the IPC rotor shaft rear balance land. Use RR Alert NMSB No. RB.211-72-AH059, dated December 11, 2012, paragraphs 3.A.(2)(a) through 3.A.(2)(c), 3.A.(3)(a) through 3.A.(3)(d), and 3.A.(5)(a) through 3.A.(5)(c) for on-wing procedures, to do the inspection.
(ii) Thereafter, repeat the inspection within every 280 CSLI. You may count CSLI from the last borescope inspection or the last ECI, whichever occurred last.
(iii) At each shop visit after the effective date of this AD, perform an ECI of the IPC rotor shaft rear balance land. Use RR NMSB No. RB.211-72-G448, Revision 4, dated August 21, 2014, paragraphs 3.D.(4) through 3.D.(5), 3.D.(6)(f) through 3.D.(7)(w), 3.D.(8)(f) through 3.D.(8)(w), and 3.D.(11) to do the inspection.
(iv) To meet the requirement of paragraph (e)(4)(i) of this AD, instead of a borescope inspection, you may perform an ECI using paragraph (e)(4)(iii) of this AD.
(i) RB211-Trent 500 engines. At the next shop visit after the effective date of this AD, remove the IPC balance weights, part numbers (P/Ns) AS44695-150, AS44695-175, AS44695-200, AS44695-225, AS44695-250, AS44695-275, and AS44695-300.
(ii) RB211-Trent 700 engines. At the next shop visit after the effective date of this AD, remove the IPC balance weights, P/Ns AS44695-150, AS44695-175, AS44695-200, AS44695-225, AS44695-250, AS44695-275, and AS44695-300.
(iii) RB211-Trent 800 engines. At the next shop visit after the effective date of this AD, remove the IPC balance weights, P/Ns AS44695-150, AS44695-175, AS44695-200, AS44695-225, AS44695-250, AS44695-275, and AS44695-300.
(iv) RB211-Trent 900 engines. At the next shop visit after the effective date of this AD, remove the IPC balance weights, P/Ns AS44695-150, AS44695-175, AS44695-200, AS44695-225, AS44695-250, AS44695-275, and AS44695-300.
(v) Once you have removed the IPC balance weights, P/Ns AS44695-150, AS44695-175, AS44695-200, AS44695-225, AS44695-250, AS44695-275, and AS44695-300, do not re-install them on any IPC shaft rear balance land.
(i) Removal of the IPC balance weights as described in paragraph (e)(5) of this AD terminates the repetitive borescope inspection requirements in paragraphs (e)(1) through (e)(4) of this AD. However, at each shop visit you must still do the ECI required by paragraphs (e)(1) through (e)(4) of this AD.
(ii) Reserved.
The aircraft, engines and makers this AD names, by the model designations in its text. A model listed here may still be outside the AD's serial ranges.
Engines